Internal Audit Check List MR
Internal Audit Check List MR
: QM/MR/Sec 16
QUALITY MANUAL Rev No. : 00
Rev. Date: 01/09/2010
Title : Design & Development
Page No : Page 1 of 3
Design Engineer determines the design stages & the responsibilities / authorities & the
interface between different groups involved for design and prepares the design plan.
Design Engineer shall update the design plan, as appropriate, as the Design progresses.
Design Engineer ensures that the design documentation includes the methods,
Assumptions, formulas, and calculations.
Design Engineer determines the inputs related to product requirement and records the same.
Design Engineer ensures that the design input includes:
a) Functional, performance requirements.
b) Where applicable, information derived from previous provisions similar design,
c) Customer specified requirements, and
d) Other requirements essential for designs
Design Engineer reviews the design inputs for adequacy, and ensures that these
requirements are complete & unambiguous
Design Engineer ensures that the design output is documented and expressed in terms that
can be verified against design inputs requirements. The design and development output
documents are approved prior to release.
Prepared by: ( MR) Master Copy Stamp Controlled Copy Stamp Approved by:(Chairman/MD)
Date : 01/09/2010 Date : 01/09/2010
Signature: Signature:
Sec. No. : QM/MR/Sec 16
QUALITY MANUAL Rev No. : 00
Rev. Date: 01/09/2010
Title : Design & Development
Page No : 2 of 3
Design Engineer conducts systematic review of design at suitable stages in accordance with
the design and development plan. This is done
Design Engineer keeps the records of the results of the reviews and any necessary action .
CPE shall ensure that final review & approval is conducted by individual(s) other than
the person or persons who developed the design.
CPE ensures that the design verification is performed in accordance with planned
arrangements to ensure that the design & development output have met the input
requirements and records of the results of the verification and necessary actions shall be
maintained.
CPE Validates the designs to ensure that resulting product is capable of meeting the
requirements for specified application or intended use where known.
Prepared by: ( MR) Master Copy Stamp Controlled Copy Stamp Approved by:(Chairman/MD)
Date : 01/09/2010 Date : 01/09/2010
Signature: Signature:
Sec. No. : QM/MR/Sec 16
QUALITY MANUAL Rev No. : 00
Rev. Date: 01/09/2010
Title : Design & Development
Page No : 3 of 3
CPE ensures the design validation is complete prior to the delivery or installation of the
product, wherever practicable.
Records of the results of validation and any necessary actions shall be maintained
Design changes are reviewed, verified, validated and approved before implementation.
CPE shall ensure that the methodology of carrying out the design changes includes
evaluation of the effect of the change on constituent parts and products already delivered.
Records of the results of the reviews of changes and necessary actions shall be
maintained.
CPE shall ensure design changes, including changes to design documents, shall require
the same control such as approval, as the original design.
Document reference:
6. CROSS REFERENCE :
Prepared by: ( MR) Master Copy Stamp Controlled Copy Stamp Approved by:(Chairman/MD)
Date : 01/09/2010 Date : 01/09/2010
Signature: Signature: