Lakas High School Esip 2019 2022 Gina
Lakas High School Esip 2019 2022 Gina
Lakas High School Esip 2019 2022 Gina
ENHANCED
SCHOOL
IMPROVEMENT
PLAN
School Year 2019-2022
Title Page i
Table of Contents ii
VISION
MISSION
To protect and promote the right of every Filipino to quality, culture-based and
complete Basic Education where:
Pupils learn in a child-friendly, gender- sensitive, safe and motivating
environment;
Teachers facilitate learning and constantly nurture every learner;
Administrators and staff, stewards of the institution to ensure enabling
and supportive environment for effective learning to happen;
Family, community and other stakeholders are actively engaged and
share responsible for developing life-long learners.
CORE VALUES
SCHOOL GOALS
SCHOOL OBJECTIVES
CHAPTER 2
__________________________________________________________________________
C
Assess H
A
A. School’s Current Situation
P
LAKAS HIGH SCHOOL, being an IP school is located by the hillside of the T
Botolan, Zambales. It is 6.5 kilometres away from the poblacion, 200 meters away
from the nearest public elementary school, 1.5 kilometre away from the nearest E
public secondary school and approximately 7 kilometre away from the Division R
Office. Tricycle is the usual mode of transportation in the area but most of the
time; people just walk because of inaccessibility of the tricycles.
2
There are no record of incidence of crimes and human-induced hazards except
sickness such as measles because whenever our students got sick, they we’re
rushed to Kainomayan Hospital. Furthermore, since the school is located by the
hillside, the most frequently human-induced hazards are forest Fire and the
illegal logging. Natural hazards such as Droughts, Flood, and storms are also
experienced for the last three years.
In addition to this, since this is an IP school, some of the classrooms are native
classrooms made of cogon, bamboo and lumber and our students just sit on the
floor during class hours. However, since the materials are made of light materials
and the roofing is made of cogon, years passed, it’s time has now come to be worn
out and the result is distressing especially now that it’s already rainy season,
there are water dripping inside and classes are affected because of the present
situation. Moreover, there are some monoblock chairs donated by private
individuals however it’s not enough because of the increasing number of
students, as a result we are now lacking of chairs. The school’s classroom- seat
ratio is 1:4, we have an existing 99 chairs and now in need of additional chairs to
provide the additional number of students.
The school water source is water pipe. Sometimes, we use the deep well run
by diesel gasoline. To give comfort to our students, the school has 3 functional
toilets: two for males and 3 for females. The toilet learner ratio is 1:47
Based on the table shown, the school lacks textbooks needed by the
students in all subjects by grade level except for Grade 9 English, Grade 9 Math,
Grade 9 Science, Grade 9 Music and Arts and ESP. No textbooks for TLE, Grades 11
and 12.
At present, we have an on-going construction of school library building
donated by Rotary Club of Makati under MOA with the LAKAS Pamunuan to Deped.
We’ ll soon have a school library and at the same time LRMDC.
The school has 50 computer units (DCP), one laptop and two Computer Desk
which is used by both junior and senior students. In addition, there is one computer
desk used in the office. However, there are five computers (private donations) to be
repaired.
The source of electricity is grid supply and we have Globe WIFI Broadband
connectivity.
There are 11 nationally funded teachers, 2 male and 9 female; three municipal
contractual teachers; and two Provincial Contractual teachers; and one secretary. All
Permanent teachers have met the desired competencies on RPMS/PPST.
Most of the students are poor; they need support from Deped, LGUs and other
private sectors. Furthermore, to solve or address the problem, the school advocates
all Deped Programs and Projects like Alternative Delivery Mode (ADM) wherein one
of the interventions is Feeding identified students who are at-risk of dropping out.
Another supplemental feeding is given to students before the conduct of deworming.
Hoping that students who are identified non-readers and frustration readers for
English and Filipino will also undergo the Feeding Program.
The school’s Source of Fund is stated below and continues to get an award of
100% Liquidation.
Table 7. Fund Source
Table 8. Number of Students who were 90% absent in the previous years who
are recipients of Conditional Cash Allowance
TOTAL 175 18 8 10 22 10 12
Percent of
10.29% 44.44% 55.56% 12.57% 45.45% 54.55%
Total
There are some students in the previous SY who were 90% below absent
and are recipients of Conditional Cash Allowance (Pantawid Pamilya) given by the
government thru DSWD.
Table 9. Number of learners who are in the frustration, instructional, and
independent levels for the current SY (ENGLISH) 10
Frustration Level Instructional Level Independent Level
M
a
Level Total Male Female Total Male Female Total Female
l
e
Pre-Test Results
Grade 7 15 10 5 25 10 15 20 10 10
Grade 8 10 7 3 14 5 9 10 5 5
Grade 9 6 2 4 17 8 9 11 5 6
Grade 10 4 2 2 27 15 12 20 10 10
Grade 11 0 0 0 0 0 0 11 5 6
Grade 12 0 0 0 0 0 0 22 9 13
Level Post-Test Results
Grade 7 5 3 2 40 20 20 15 5 10
Grade 8 5 3 2 20 10 10 9 3 6
Grade 9 5 3 2 19 10 9 10 3 7
Grade 10 2 1 1 27 17 10 12 6 6
Grade 11 NA NA NA NA 11 5 6
Grade 12 NA NA NA NA 22 9 13
Table 10. Number of learners who are in the frustration, instructional, and
independent levels for the current SY (Filipino)
Grade 8 NA NA NA NA NA NA NA NA
Grade 9 NA NA NA NA NA NA NA NA
Grade 10 NA NA NA NA NA NA NA NA
Grade 11 NA NA NA NA NA NA NA NA
Grade 12 NA NA NA NA NA NA NA NA
Level Post-Test Results
Grade 7 5 3 2 40 20 20 15 5 10
Grade 8 NA NA NA NA NA NA NA NA NA
Grade 9 NA NA NA NA NA NA NA NA NA
Grade 10 NA NA NA NA NA NA NA NA NA
Grade 11 NA NA NA NA NA NA 11 5 6
Grade 12 NA NA NA NA NA NA 22 9 13
Based on the analysis of the school current situation the following are the
priority needs of the school for improvement to attain the school goals and
objectives for the three consecutive years from SY 2019-2022. These are the
following: Shortage of classrooms, armchairs, hand washing and toilets;
Renovation of the roofing of the native classrooms; Finalization and validation of
IPeD Policy Framework; High percentage of Absenteeism ; Identified Grade 7 Non-
Readers, Frustration Readers both English and Filipino; Increased number of
Non-Numerates in Grade 7; Increased number of Severely Wasted Learners;
Renovation of Grade 8 classrooms; Renovation of LAKAS Council Canteen to be
used as Guidance Office and Clinic; Construction of Reading Clinic; Installation
of Internet Connectivity for SHS; Intensified Home Visitation and Conference to
address students problems and needs; Procurement of TLE equipment and
utensils to be used in canteen, Construction of Guard House and Perimeter
Fence.
For the school category, awards received were as follows; Brigada Eskwela,
2nd Place Division; Gulayan sa Paaralan. 2nd Place District; Choral, 2nd Place
District. For our students’ category, awards received for the4 following: Spoken
Poetry, District; Sabayang Awit, District; Pop Jingle: Writing and Singing;
Technolympics (Landscaping) District, 1st entry to Division Level; Sineliksik,
Division 1st Place, Direk Ko, Ganap ko, 3rdr Place Region; Science Quiz Bee,
District, Urduja Film Festival, 7 awards received. For the School Head category,
was awarded and recognized: 100 Liquidation, Brigada Eskwela 2nd Place Small
Category Division; 3rd Place Photojourn; PRIMALS Class Monitor
2.2 List of Priority Improvement Areas (PIA’s)- ANNEX 4
Table11. List of PIA’s –ANNEX 4
Improvement Strategic Urgency Magnitude Feasibility
Areas Importance
1.Shortage of classrooms, armchairs, hand -Conduct meetings with possible partners like
washing and toilets the LGUs, Provincial, National officials, NGOs
and other private sectors
-Conduct dialogue with the PTA Officers,
LAKAS and other community members
2.Renovation of the roofing of the native -Conduct dialogue/meetings with the PTA
classrooms Officers, LAKAS Pamunuan
-Request for financial or in-kind assistance
from the LGU
1. Project Title: Shortage of classrooms, textbooks, arm chairs, hand washing and toilet
Problem Statement:
Date of Person
Activity Output Budget Budget Source
Implementation Responsible
Call for a
School head
meeting/conference Records of
Teacher/Adviser
with the LAKAS meetings and All year round None None
Parents
pamunuan, LGUs, conferences
Students
Provincial, national
Records of
Make a Project
meetings and July-August 2019 School Head None None
Proposal
conferences
Donors
Search for potential Solicited Teachers
Donations
donors, partners materials/ All year round Parents None
MOOE
donations Students
Repair of
classrooms, request
School head
for textbooks, Solicitations
MOA Teachers
installation of hand- All year round 20,000 Donations
Program of Work Parents
washing, MOOE
Students
construction of
additional toilets
Note: Please record also the date of monitoring per project
Please attach this form to the AIP template
Problem Statement:
An immediate problem to repair the roofing of the native classrooms for
it’s already worn out, dripping water gets inside due to heavy rain
Minutes of the
Consultative Meeting School Head
Meeting/Attendance July 2019
with parents and Lakas Council None None
of parents and onwards
LAKAS Council Chairman
LAKAS Council
School Head
Approval of the
Consultative Meeting Teachers
LAKAS Council / June – April
with LGU/DEPED Lakas Council None None
MAYOR as stated in 2016
(Municipal/Provincial) Chairman
the minutes of the
Mayor
School Head
September Municipal LGU
Renovation of the Renovated roofing
2019 onwards Engineer 50,000 Donors
roofing of the native (Program of work )
Teachers MOOE
classrooms
Problem Statement:
Root Cause:
Date of Person
Activity Output/Outcome Budget Budget Source
Implementation Responsible
Pre-Assessment
June - July 2019 School Head
Pre-Assessment Oral Reading Test None None
English Teacher
results
Identified
students under
Conduct of Phil School Head
the Frustration June - July 2019 5,000 None
IRRI Teachers
and Instructional
level
“One-text-a-
Enhanced love School Head
week” All year round None None
for reading Teachers
Developed
Teachers
Peer Tutoring camaraderie All year round None None
Students
through reading
Remedial Increased
Teaching performance in English Teacher
All year round None None
Reading Parents
Comprehension
Problem Statement:
Root Cause:
Date of Person
Activity Output/Outcome Budget Budget Source
Implementation Responsible
Pre-Assessment in
June - July 2019 School Head
Pre-Assessment the four None None
English Teacher
fundamentals
Identified
Conduct of students with School Head
June - July 2019 5,000 None
Numeracy Test numeracy Teachers
difficulty
Developed
Teachers
Peer Tutoring camaraderie All year round None None
Students
through numeracy
Remedial
Improved
Teaching English Teacher
performance in All year round None None
Parents
Numeracy
Problem Statement:
interventions
Root Cause:
Date of Person
Activity Output Budget Budget Source
Implementation Responsible
School head
Records of
Conference Teacher/Adviser
meetings and All year round None NA
with Parents Parents
conferences
Students
Teachers/adviser
Home visits Parents
Home Visitation All year round 500 MOOE
reports Students
Donors
Adopt –a student’ Solicited Teachers Solicitations
1000
needs materials/ All year round Parents Donations
donations Students MOOE
School head
Giving of Rewards Records of 90% - Teachers Solicitations
All year round
and Incentives 100% attendance Parents Donations
Students
Problem Statement:
There were 14 identified severely wasted learners due to
poverty
Date of Person
Activity Output Budget Budget Source
Implementation Responsible
Orientation to
Attendance School Head
students and June 2019 None None
ACR MAPEH Teachers
Parents
Record of
Provide Students MOOE
July to December School Head
Supplemental (Pre, during and 5,000 Donations
2019 TLE Teachers
Feeding After) Cantten
ACR
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Teachers/adviser
Consultation Parents
Approval of the
with LGU (Municipal/ July 2019 Students NA NA
Project Proposal
Provincial) LGU
Mun. Engineer
Monitoring
/Evaluation Teachers
Records
All year round LGU
Pictures
DEpED
Problem Statement: The SHS needs an Internet Subscription separate from the JHS for fast
connectivity
School
Application for Approved Head/ICT
November 2019 3000.00 MOOE
Internet Application Coordinator
Subscription
Problem Statement:
The school need to purchase TLE utensils and equipment for canteen
used
Date of Person
Activity Output Budget Budget Source
Implementation Responsible
School Head
Assessment of the
Report/ACR June 2019 TLE/Canteen None None
program
Manager
Problem Statement:
Due to increasing number of none readers and frustration readers, the
school needs to have a Reading Clinic, a room where students can stay to be
diagnosed of their reading difficulties
Root Cause:
Lack of Interest in Reading
Parents can’t also read
Poor Reading Practices
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
School Head
Approval of the
Consultative Meeting Teachers
LAKAS Council / June – April
with LGU/DEPED Lakas Council None None
MAYOR as stated in 2019
(Municipal/Provincial) Chairman
the minutes of the
Mayor
School Head
Project Proposal to September 2019
Approved Project Municipal Engineer
construct Reading Clinic onwards None None
proposal Teachers
School Head
Construction of Reading Program of Work October 2019 Municipal Engineer
50,000 D0nations
Clinic ACR onwards Teachers
School Head
Monitoring/Evaluation Pictures/Documents October onwards None None
Teachers
Project Title:
Finalization of IPeD Policy Framework
Problem Statement:
The school in partnership with LAKAS Council has not yet finished the 100%
formulation of the IPed Policy Framework
Project Objective:
To enhance and preserve IP culture and traditions of our students
Root Causes:
. K to 12 Curriculum Indifference of some leaders
Date of Budget
Activity Output Person Responsible Budget
Implementation Source
School head
Approval of the IP Teachers
Reorientation on the finalization
IP Leaders & June 2019 LAKAS Council 500 MOOE
of the IPeD Policy Framework
LAKAS Council Elders
IP EP-Supervisor
School head
Finalization and validation
Copy of the IP Teachers
of the IPeD July-December 2019 5,000 SDO
Curriculum LAKAS Council
Policy Framework
Elders
IP EP-Supervisor
School head
Records
Assessment/Evaluation IP Teachers
Documents All year round None None
Monitoring LAKAS Council/Elders
Pictures
Problem Statement:
Due to increasing number of enrollees, the school is in need to renovate
the LAKAS Office to Guidance/ Clinic
Root Cause:
Infested by termites
No space to accommodate learners who have problems in school and their
health
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Minutes of the
Consultative Meeting School Head
Meeting/Attendance July 2019
with parents and LAKAS Lakas Council None None
of parents and LAKAS onwards
Council Chairman
Council
School Head
Approval of the
Consultative Meeting Teachers
LAKAS Council / June – April
with LGU/DEPED Lakas Council None None
MAYOR as stated in 2016
(Municipal/Provincial) Chairman
the minutes of the
Mayor
School Head
Renovated Guidance September 2019 LGU
Municipal Engineer
Renovation of Guidance Office/Clinic onwards 50,000 Donors
Teachers
Office/Clinic (Program of work ) MOOE
School Head
Monitoring/Evaluation Pictures/Documents October onwards None None
Teachers
To construct a guard house for the security guards to have a place to stay
Root Cause:
Luck of fund
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Minutes of the
Consultative Meeting School Head
Meeting/Attendance July 2019
with parents and LAKAS Lakas Council None None
of parents and LAKAS onwards
Council Chairman
Council
School Head
Approval of the
Consultative Meeting Teachers
LAKAS Council / June – April
with LGU/DEPED Lakas Council None None
MAYOR as stated in 2016
(Municipal/Provincial) Chairman
the minutes of the
Mayor
School Head
Construction of Guard September 2019 LGU
Municipal Engineer
House onwards 50,000 Donors
Construct Guard House Teachers
(Program of work ) MOOE
School Head
Monitoring/Evaluation Pictures/Documents October onwards None None
Teachers
Problem Statement: Identified students who have problems in school need to be visited at
home
Project Objective Statement: To lessen number of students who have problems in school
Encouraged
Home
students to Year-round Advisers 500.00 School Fund
Visitation
Balik Aral
Parent/ Identified
Parent/
Teacher/ reasons of
Teacher/
Pupils and non- Year-round - -
Pupils and
School Head attendance to
School Head
Conference school
Note: Please record also the date of monitoring per project
Please attach this form to the AIP template
CHAPTER 4 C
Monitoring and Evaluation H
4.1 Project Monitoring Report Forms A
P
LIST OF ACRONYMS
T
E
DepEd – Department of Education R
SIP – School Improvement Program
AIP – Annual Implementation Plan 4
SPT- School Planning Team
PT- Project Team
PWP-Project Work Plan
LRMDC- Learning Resource Management and Development Center
RICE- Restructured Instructional Classroom Environment
SLAC-School Learning Action Cell
BHS-Basic Hand Washing Facility
PREPARED BY:
MEMBERS:
EMELINE B. ALVAREZ ____________________
Recommending Approval:
APPROVED: