This document contains a pre-pour checklist for a concrete pour project. It lists activities that must be approved by contractors and engineers before proceeding. These include verifying rebar placement is to approved drawings, shuttering is dimensionally correct, water leakage tests are passed, embedded items and openings are correctly installed, and safety requirements are met. Once all items are approved, permission is given to proceed with the concrete pour.
This document contains a pre-pour checklist for a concrete pour project. It lists activities that must be approved by contractors and engineers before proceeding. These include verifying rebar placement is to approved drawings, shuttering is dimensionally correct, water leakage tests are passed, embedded items and openings are correctly installed, and safety requirements are met. Once all items are approved, permission is given to proceed with the concrete pour.
This document contains a pre-pour checklist for a concrete pour project. It lists activities that must be approved by contractors and engineers before proceeding. These include verifying rebar placement is to approved drawings, shuttering is dimensionally correct, water leakage tests are passed, embedded items and openings are correctly installed, and safety requirements are met. Once all items are approved, permission is given to proceed with the concrete pour.
This document contains a pre-pour checklist for a concrete pour project. It lists activities that must be approved by contractors and engineers before proceeding. These include verifying rebar placement is to approved drawings, shuttering is dimensionally correct, water leakage tests are passed, embedded items and openings are correctly installed, and safety requirements are met. Once all items are approved, permission is given to proceed with the concrete pour.
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1of 1
s
Pre-pour check list
Sl.NO Activity Contr. Contr. CISPL CISPL Eng QC Engineer QC A Rebar 1 Approved drawings are available 2 Diameter of bars are as per approved drawing 3 Spacing/no. of bars are as per approved drawings 4 Cover to rebar is as required 5 Distribution of cover blocks is as per approved detail. 6 Alignment of rebar is satisfactory 7 Lap location is staggered 8 Lap length is sufficient All dowel bars/couplers/addl. Bars near openings are placed as 9 per approved detail 10 Coupler tightening is satisfactory. 11 Ensure continuity of earthing rebar. 12 Cleanliness is satisfactory 13 Approved to proceed with shuttering work B Shutter 1 Approved drawings are available 2 Materials used for shuttering work are as per approved details. 3 Dimensions of shutters are satisfactory 4 Cleanliness is satisfactory 5 Gaps in shutters are sealed properly. 6 Supports and bracings are as per approved details 7 Alignment of shutters are OK 8 Verticality of shutters are OK 9 Mould release agent is applied on the shutters. 10 Top level of concrete is marked on the shutters. Water Leakage Test done along periphery of slab shuttering 11 and vertical casted members (for slabs) 12 Water leakage tests done for vertical members C Services 1 Electrical 2 Mechanical/Elevators 3 Plumbing 4 Only fixing of embedded items for concrete structure 5 Façade: inspection of completed works embedded item 6 Others 7 Builders openings are as per the approved details D Safety requirements are OK E Approved to proceed with the concrete pour Comments