0% found this document useful (0 votes)
105 views2 pages

First Part Completed Completed

The document contains information about different zones of construction projects listing details of underground layers and depths. It includes zones 3B and 3A which contain multiple entries listing the from and to layers, depth information for each layer, and total depth of the construction for each entry. The zones include notes on whether parts of the construction are completed.

Uploaded by

akash nair
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views2 pages

First Part Completed Completed

The document contains information about different zones of construction projects listing details of underground layers and depths. It includes zones 3B and 3A which contain multiple entries listing the from and to layers, depth information for each layer, and total depth of the construction for each entry. The zones include notes on whether parts of the construction are completed.

Uploaded by

akash nair
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ZONE NO: FROM IL CL GL TO IL CL GL BACKFILLIN TOTAL REMARK

G LAYER LAYER

1 MH/24/35 3.55 6.422 6.61 MH/24/34 3.165 7 7.02 11 13


2 MH/24/34 3.165 7 7.02 MH/24/33 2.913 7.3 7.47 11 16
3 MH/24/33 2.913 7.3 7.47 MH/24/32 2.808 7.18 7.43 12 17
ZONE 3B PART 3

4 MH/24/32 2.808 7.18 7.43 MH/24/31 2.601 8.68 8.21 14 19


5 MH/24/31 2.601 8.68 8.21 MH/24/30 2.494 8.026 8.12 14 21
6 MH/24/30 2.494 8.026 8.12 MH/24/29 2.39 7.6 7.78 14 21
7 MH/24/29 2.39 7.6 7.78 MH/24/28 2.203 6.267 6.93 16 19
8 MH/24/28 2.203 6.267 6.93 MH/24/27 2.146 5.404 5.65 12 15
9 MH/24/27 2.146 5.404 5.65 MH/24/26 1.978 5.31 5.31 8 12
10 MH/24/7/21 0.922 5.01 5.012 MH/24/7/22 1.626 5.068 5.09 11 14
11 MH/24/7/22 1.626 5.068 5.09 MH/24/7/23 2.015 5.42 5.42 11 13
12 MH/24/7/23 2.015 5.42 5.42 MH/24/7/24 2.315 5.85 5.85 4 13 FIRST PART

1 MH/19/6/9 2.542 4.616 5.043 MH/19/6/8 2.104 5.122 5.373 11 10 COMPLETED


ZONE 3A PART 1

2 MH/19/6/8 2.104 5.122 5.373 MH/19/6/7 1.908 4.817 4.912 11 11 COMPLETED

3 MH/19/6/7 1.908 4.817 4.912 MH/19/6/7/1 2.296 4.912 5.097 5 10


4 MH/19/6/7/1 2.296 4.912 5.097 MH/19/6/7/2 2.626 4.738 5.03 5 9
5 MH/19/6/7/2 2.626 4.738 5.03 MH/19/6/7/3 3.302 5.27 5.139 4 7
6 MH/19/6/7 1.908 4.817 4.912 MH/19/6/6 1.638 4.596 5.061 6 12
7 MH/19/6/6 1.638 4.596 5.061 MH/19/6/5 0.989 4.35 5.177 8 14
8 MH/19/6/4/1A 2.717 4.678 5.01 MH/19/6/4 1.82 5.215 5.161 8 10
1 MH/19/21 2.595 5.068 5.24 MH/19/20 2.328 4.891 5.04 8 10
2 MH/19/20 2.328 4.891 5.04 MH/19/19 1.947 4.868 4.929 4 10
3 MH/19/19 1.947 4.868 4.929 MH/19/19/1 2.892 4.797 4.797 4 9
ZONE 3A PART 2

4 MH/19/16/4/1 3.555 5.555 5.25 MH/19/16/4 2.758 5.782 5.19 8 7 COMPLETED

5 MH/19/16/4 2.758 5.782 5.19 MH/19/16/5 3.053 5.759 5.24 8 8 COMPLETED

6 MH/19/16/4 2.758 5.782 5.19 MH/19/16/3 2.44 5.578 5.89 10 11


7 MH/19/10/5A 3.399 5.217 5.03 MH/19/10/4A 3.173 5.313 5.31 7 6 COMPLETED

8 MH/19/10/4A 3.173 5.313 5.31 MH/19/10/3A 2.838 4.751 5 7 7 COMPLETED

9 MH/19/10/3A 2.838 4.751 5 MH/19/10/2A 2.533 4.953 5.08 8 8 COMPLETED

10 MH/19/10/2A 2.533 4.953 5.08 MH/19/10/1A 2.363 5.07 5.07 8 9 COMPLETED

11 MH/19/10/5/1 3.4 5.32 5.31 MH/19/10/5 2.469 5.33 5.33 6 8


12 MH/19/10/5 2.469 5.33 5.33 MH/19/10/6 3.024 5.71 5.71 6 10
MH/19/10/2/5 2.946 5.41 5.41 MH/19/10/2/6 3.17 5.52 5.52 2 8
1 MH-1-22/28 3.682 5.879 6.36 MH-1-22/28/1 3.897 5.945 6.48 9 9 COMPLETED
ZONE 3C PART 2

2 MH-1-22/28 3.682 5.879 6.36 MH-1-22/29 3.79 5.644 6.79 10 10 COMPLETED

3 MH-1-22/29 3.79 5.644 6.79 MH-1-22/30 3.889 5.844 6.57 8 10


4 MH-1-22/28 3.682 5.879 6.36 MH-1-22/27 3.531 5.92 6.52 4 10
5 MH-1-22/25/2 4.162 6.092 6.56 MH-1-22/25/1 3.995 5.903 6.3 8 8
6 MH-1-22/21/3 4.57 6.344 6.21 MH-1-22/21/2 4.351 6.349 5.94 5 5 COMPLETED

7 MH-1-22/21/2 4.351 6.349 5.94 MH-1-22/21/1 4.287 6.291 6.15 4 6


8 MH-1-22/21/1 4.287 6.291 6.15 MH-1-22/21 2.61 6.102 5.94 5 9
ZONE NO: FROM TO BACKFILLI TOTAL REMARK
NG LAYER LAYER

1 MH/24/35 MH/24/34 11
2 MH/24/34 MH/24/33 11
3 MH/24/33 MH/24/32 12
ZONE 3B PART 3

4 MH/24/32 MH/24/31 14
5 MH/24/31 MH/24/30 14
6 MH/24/30 MH/24/29 14
7 MH/24/29 MH/24/28 16
8 MH/24/28 MH/24/27 12
9 MH/24/27 MH/24/26 8
10 MH/24/7/21 MH/24/7/22 11
11 MH/24/7/22 MH/24/7/23 11
12 MH/24/7/23 MH/24/7/24 4 FIRST PART

1 MH/19/6/9 MH/19/6/8 11 COMPLETED


ZONE 3A PART 1

2 MH/19/6/8 MH/19/6/7 11 COMPLETED

3 MH/19/6/7 MH/19/6/7/1 5
4 MH/19/6/7/1 MH/19/6/7/2 5
5 MH/19/6/7/2 MH/19/6/7/3 4
6 MH/19/6/7 MH/19/6/6 6
7 MH/19/6/6 MH/19/6/5 8
8 MH/19/6/4/1A MH/19/6/4 8
1 MH/19/21 MH/19/20 8
2 MH/19/20 MH/19/19 4
3 MH/19/19 MH/19/19/1 4
ZONE 3A PART 2

4 MH/19/16/4/1 MH/19/16/4 8 COMPLETED

5 MH/19/16/4 MH/19/16/5 8 COMPLETED

6 MH/19/16/4 MH/19/16/3 10
7 MH/19/10/5A MH/19/10/4A 7 COMPLETED

8 MH/19/10/4A MH/19/10/3A 7 COMPLETED

9 MH/19/10/3A MH/19/10/2A 8 COMPLETED

10 MH/19/10/2A MH/19/10/1A 8 COMPLETED

11 MH/19/10/5/1 MH/19/10/5 6
12 MH/19/10/5 MH/19/10/6 6
1 MH-1-22/28 MH-1-22/28/1 9 COMPLETED
ZONE 3C PART 2

2 MH-1-22/28 MH-1-22/29 10 COMPLETED

3 MH-1-22/29 MH-1-22/30 8
4 MH-1-22/28 MH-1-22/27 4
5 MH-1-22/25/2 MH-1-22/25/1 8
6 MH-1-22/21/3 MH-1-22/21/2 5 COMPLETED

7 MH-1-22/21/2 MH-1-22/21/1 4
8 MH-1-22/21/1 MH-1-22/21 4

You might also like