Common Services Multicore Cable Schedule

This document provides details of the multicore cable schedules for connecting equipment at the Kariba South Power Station to new relay panels as part of an automation project. It includes 37 core cable schedules from the station transformer 1 and 3 relay panels to the new relay panels, specifying the core numbers, terminal block connections and functions such as controls and indications for circuit breakers, isolators and other equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views25 pages

Common Services Multicore Cable Schedule

This document provides details of the multicore cable schedules for connecting equipment at the Kariba South Power Station to new relay panels as part of an automation project. It includes 37 core cable schedules from the station transformer 1 and 3 relay panels to the new relay panels, specifying the core numbers, terminal block connections and functions such as controls and indications for circuit breakers, isolators and other equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 25

Kariba South Power Station - Automation Project

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Station Transformer 1 relay panel To: New Relay Panel
: circuit breaker local control cubicle
Cable no: A/ST1 Cores: 37
Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
1 Station transformer 1 W2L TB1/1 Circuit breaker control
common +ve
2 Station transformer 1 W1L TB1/2 Circuit breaker close
3 Station transformer 1 W3L TB1/3 Circuit breaker open
4 Station transformer 1 X1L TB1/4 Indications and alarms
common +ve
5 Station transformer 1 X5L TB1/5 11kV ocb closed
6 Station transformer 1 X4L TB1/6 11kV ocb open
7 Station transformer 1 X15L TB1/7 Main protection operated

8 Station transformer 1 X14L TB1/8 Backup protection


9 Station transformer 1 X2L TB1/9 Indications common -ve
10 Station transformer 1 X7L TB1/10 11kV ocb racked out
11 Station transformer 1 X8L TB1/11 11kV ocb off remote
12 Station transformer 1 W11L TB1/12 Circuit breaker 1TO
control common +ve
13 Station transformer 1 W12L TB1/13 18kV acb 1TO close
14 Station transformer 1 W13L TB1/14 18kV acb 1TO open

Multi-core cable schedules Page 1 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay Panel


No Kiosk
Core Ferrule Term Ferrule Term No Comments
Number No No No
15 Station transformer 1 W5L TB1/15 Isolator 1T3 control
common
16 Station transformer 1 W6L TB1/16 18kV isol 1T3 close
17 Station transformer 1 W7L TB1/17 18kV isol 1T3 open
18 Station transformer 1 W8L TB1/18 Isolator 1T4 control
common
19 Station transformer 1 W9L TB1/19 18kV isol 1T4 close
20 Station transformer 1 W10L TB1/20 18kV isol 1T4 open
21 Station transformer 1 X31L TB1/21 Circuit breaker indication
common +ve
22 Station transformer 1 X32L TB1/22 Off remote control
23 Station transformer 1 X33L TB1/23 Circuit breaker 1TO closed
24 Station transformer 1 X34L TB1/24 Circuit breaker 1TO open
25 Station transformer 1 X35L TB1/25 Isolator 1T4 closed
26 Station transformer 1 X36L TB1/26 Isolator 1T4 open
27 Station transformer 1 X37L TB1/27 Isolator 1T3 closed
28 Station transformer 1 X38L TB1/28 Isolator 1T3 open
29 Station transformer 1 X39L TB1/29 E/S 1T1 closed
30 Station transformer 1 X40L TB1/30 E/S 1T1 open
31 Station transformer 1 X32L TB1/31 18kV acb off remote
32 Station transformer 1 X58L TB1/32 Circuit breaker indication
common -ve
33 Station transformer 1 X231L TB1/33 S/transformer cooler alarm
common +ve

Multi-core cable schedules Page 2 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay Panel


No Kiosk
Core Ferrule Term Ferrule Term No Comments
Number No No No
34 Station transformer 1 X232L TB1/34 Oil flow fail
35 Station transformer 1 X233L TB1/35 Cooling water failure
36 Station transformer 1 X235L TB1/36 Buchholz gas
37 Station transformer 1 X234L TB1/37 Winding temperature high
38 Station transformer 1 X236L TB1/38 50VDC negative
39 Station transformer 1 X51L TB1/39 Circuit breaker alarm
common +ve
40 Station transformer 1 X54L TB1/40 Swgr low air pressure

Multi-core cable schedules Page 3 of 25


Kariba South Power Station - Automation Project

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Station Transformer 3 relay panel To: New Relay Panel
:Circuit breaker local control cubicle
Cable no: A/ST3 Cores: 37
Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
1 Station transformer 3 W2G TB1/41 Circuit breaker control
common +ve
2 Station transformer 3 W1G TB1/42 Circuit breaker close
3 Station transformer 3 W3G TB1/43 Circuit breaker open
4 Station transformer 3 X1G TB1/44 Indications and alarms
common +ve
5 Station transformer 3 X5G TB1/45 11kV ocb closed
6 Station transformer 3 X4G TB1/46 11kV ocb open
7 Station transformer 3 X15G TB1/47 Main protection operated

8 Station transformer 3 X14G TB1/48 Backup protection


9 Station transformer 3 X2G TB1/49 Indications common -ve
10 Station transformer 3 X7G TB1/50 11kV ocb racked out
11 Station transformer 3 X8G TB1/51 11kV ocb off remote
12 Station transformer 3 W11G TB1/52 Circuit breaker 1TO
control common +ve
13 Station transformer 3 W12G TB1/53 18kV acb 1TO close
14 Station transformer 3 W13G TB1/54 18kV acb 1TO open

Multi-core cable schedules Page 4 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
15 Station transformer 3 W5G TB1/55 Isolator 1T3 control
common
16 Station transformer 3 W6G TB1/56 18kV isol 1T3 close
17 Station transformer 3 W7G TB1/57 18kV isol 1T3 open
18 Station transformer 3 W8G TB1/58 Isolator 1T4 control
common
19 Station transformer 3 W9G TB1/59 18kV isol 1T4 close
20 Station transformer 3 W10G TB1/60 18kV isol 1T4 open
21 Station transformer 3 X31G TB1/61 Circuit breaker indication
common +ve
22 Station transformer 3 X32G TB1/62 Off remote control
23 Station transformer 3 X33G TB1/63 Circuit breaker 1TO
closed
24 Station transformer 3 X34G TB1/64 Circuit breaker 1TO open
25 Station transformer 3 X35G TB1/65 Isolator 1T4 closed
26 Station transformer 3 X36G TB1/66 Isolator 1T4 open
27 Station transformer 3 X37G TB1/67 Isolator 1T3 closed
28 Station transformer 3 X38G TB1/68 Isolator 1T3 open
29 Station transformer 3 X39G TB1/69 E/S 1T1 closed
30 Station transformer 3 X40G TB1/70 E/S 1T1 open
31 Station transformer 3 X32G TB1/71 18kV acb off remote
32 Station transformer 3 X58G TB1/72 Circuit breaker indication
common -ve
33 Station transformer 3 X231G TB1/73 S/transformer cooler
alarm common +ve

Multi-core cable schedules Page 5 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay Panel


No Kiosk
Core Ferrule Term Ferrule Term No Comments
Number No No No
34 Station transformer 3 X232G TB1/74 Oil flow fail
35 Station transformer 3 X233G TB1/75 Cooling water failure
36 Station transformer 3 X235G TB1/76 Buchholz gas
37 Station transformer 3 X234G TB1/77 Winding temperature high
38 Station transformer 3 X236G TB1/78 50VDC negative
39 Station transformer 3 X51G TB1/79 Circuit breaker alarm
common +ve
40 Station transformer 3 X54G TB1/80 Swgr low air pressure

Multi-core cable schedules Page 6 of 25


Kariba South Power Station - Automation Project

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Common Services Tx1 relay panel To: New Relay Panel
Cable no: A/CST1 Cores: 27
Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
1 Common services Tx1 W2N TB1/81 11Kv cb control common
+ve
2 Common services Tx1 W1N TB1/82 11Kv cb close
3 Common services Tx1 W3N TB1/83 11Kv cb open
4 Common services Tx1 X1N TB1/84 11Kv indications and
alarms common +ve
5 Common services Tx1 X5N TB1/85 11Kv ocb closed
6 Common services Tx1 X4N TB1/86 11Kv ocb open
7 Common services Tx1 X14N TB1/87 Main protection operated
8 Common services Tx1 X227N TB1/88 Buchholz gas
9 Common services Tx1 X228N TB1/89 Oil temp high
10 Common services Tx1 X2N TB1/90 11Kv indications
common –ve
11 Common services Tx1 X7N TB1/91 11Kv ocb racked out
12 Common services Tx1 X8N TB1/92 11Kv ocb off remote
control

Multi-core cable schedules Page 7 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
13 Common services Tx1 X17N TB2/1 11Kv trip circuit failure
14 Common services Tx1 W502N TB2/3 380V cb control common
+ve
15 Common services Tx1 W501N TB2/4 380V cb close
16 Common services Tx1 W503N TB2/5 380V cb open
17 Common services Tx1 X501N TB2/6 380V cb indications
common +ve
18 Common services Tx1 X505N TB2/7 380V cb closed
19 Common services Tx1 X504N TB2/8 380V cb open
20 Common services Tx1 X502N TB2/9 380V cb indications
common –ve
21 Common services Tx1 X508N TB2/10 380V cb racked out

Multi-core cable schedules Page 8 of 25


Kariba South Power Station - Automation Project

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Common Services Tx 2 relay panel To: New Relay Panel
Cable no: A/CST1 Cores: 27
Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
1 Common services Tx2 W2E TB2/11 11Kv cb control common +ve
2 Common services Tx2 W1E TB2/12 11Kv cb close
3 Common services Tx2 W3E TB2/13 11Kv cb open
4 Common services Tx2 X1E TB2/14 11Kv indications and alarms
common +ve
5 Common services Tx2 X5E TB2/15 11Kv ocb closed
6 Common services Tx2 X4E TB2/16 11Kv ocb open
7 Common services Tx2 X14E TB2/17 Main protection operated
8 Common services Tx2 X227E TB2/18 Buchholz gas
9 Common services Tx2 X228E TB2/19 Oil temp high
10 Common services Tx2 X2E TB2/20 11Kv indications common –ve
11 Common services Tx2 X7E TB2/21 11Kv ocb racked out
12 Common services Tx2 X8E TB2/22 11Kv ocb off remote control
13 Common services Tx2 X17E TB2/23 11Kv trip circuit failure
Relay Plant A/ST1 Marshalling New Relay Panel
Kiosk
No Core Ferrule Term Ferrule Term No Comments

Multi-core cable schedules Page 9 of 25


Kariba South Power Station - Automation Project

Number No No No
14 Common services Tx2 W502E TB2/24 380V cb control common +ve
15 Common services Tx2 W501E TB2/25 380V cb close
16 Common services Tx2 W503E TB2/26 380V cb open
17 Common services Tx2 X501E TB2/27 380V cb indications common
+ve
18 Common services Tx2 X505E TB2/28 380V cb closed
19 Common services Tx2 X504E TB2/29 380V cb open
20 Common services Tx2 X502E TB2/30 380V cb indications common
–ve
21 Common services Tx2 X508E TB2/31 380V cb racked out

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Common Services Tx3 relay panel To: New Relay Panel

Multi-core cable schedules Page 10 of 25


Kariba South Power Station - Automation Project

Cable no: A/CST1 Cores: 27


Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
1 Common services Tx3 W2D TB2/32 11Kv cb control common
+ve
2 Common services Tx3 W1D TB2/33 11Kv cb close
3 Common services Tx3 W3D TB2/34 11Kv cb open
4 Common services Tx3 X1D TB2/35 11Kv indications and
alarms common +ve
5 Common services Tx3 X5D TB2/36 11Kv ocb closed
6 Common services Tx3 X4D TB2/37 11Kv ocb open
7 Common services Tx3 X14D YB2/38 Main protection operated
8 Common services Tx3 X277D TB2/39 Buchholz gas
9 Common services Tx3 X228D TB2/40 Oil temp high
10 Common services Tx3 X2D TB2/41 11Kv indications common
–ve
11 Common services Tx3 X7D TB2/42 11Kv ocb racked out
12 Common services Tx3 X8D TB2/43 11Kv ocb off remote
control
Relay Plant A/ST1 Marshalling New Relay Panel
Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
13 Common services Tx3 X17D TB2/44 11Kv trip circuit failure

Multi-core cable schedules Page 11 of 25


Kariba South Power Station - Automation Project

14 Common services Tx3 W502D TB2/45 380V cb control common


+ve
15 Common services Tx3 W501D TB2/46 380V cb close
16 Common services Tx3 W503D TB2/47 380V cb open
17 Common services Tx3 X501D TB2/48 380V cb indications
common +ve
18 Common services Tx3 X505D TB2/49 380V cb closed
19 Common services Tx3 X504D TB2/50 380V cb open
20 Common services Tx3 X502D TB2/51 380V cb indications
common –ve
21 Common services Tx3 X508D TB2/52 380V cb racked out

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Permanent camp feeder 2 relay panel To: New Relay Panel
Cable no: A/PCF2 Cores: 19

Multi-core cable schedules Page 12 of 25


Kariba South Power Station - Automation Project

Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 Permanent camp 2 feeder W2H TB2/53 11Kv cb control common
+ve
2 Permanent camp 2 feeder W3H TB2/54 11Kv cb open
3 Permanent camp 2 feeder W1H TB2/55 11Kv cb close
4 Permanent camp 2 feeder X1H TB2/56 11Kv indications and
alarms common +ve
5 Permanent camp 2 feeder X4H TB2/57 11Kv ocb open
6 Permanent camp 2 feeder X5H TB2/58 11Kv ocb closed
7 Permanent camp 2 feeder X15H TB2/59 Main protection operated
8 Permanent camp 2 feeder X14H TB2/60 Back-up protection
operated
9 Permanent camp 2 feeder X2H TB2/61 11Kv indications common
–ve
10 Permanent camp 2 feeder X7H TB2/62 11Kv ocb racked out
11 Permanent camp 2 feeder X8H TB2/63 11Kv ocb off remote
control

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Substation Tx 1 relay panel To: New Relay Panel
Cable no: A/SST1 Cores: 19

Multi-core cable schedules Page 13 of 25


Kariba South Power Station - Automation Project

Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay Panel


Kiosk
No Core Ferrule Term Ferrule Term No Comments
Number No No No
1 Substation Tx1 W2M TB2/64 11kV Circuit breaker
control common +ve
2 Substation Tx1 W3M TB2/65 11kV ocb open
3 Substation Tx1 W1M TB2/66 11kV ocb close
4 Substation Tx1 X1M TB2/67 Indications and alarms
common +ve
5 Substation Tx1 X4M TB2/68 11kV ocb open
6 Substation Tx1 X5M TB2/69 11kV ocb closed
7 Substation Tx1 X14M TB2/70 Main protection
operated
8 Substation Tx1 X2M TB2/71 Indications common –ve
9 Substation Tx1 X7M TB2/72 11kV ocb racked out
10 Substation Tx1 X8M TB2/73 11kV ocb off remote
control

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Substation Tx2 relay panel To: New Relay Panel
Cable no: A/SST2 Cores: 19

Multi-core cable schedules Page 14 of 25


Kariba South Power Station - Automation Project

Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 Substation Tx2 W2F 11kV Circuit breaker
control common +ve
2 Substation Tx2 W3F 11kV ocb open
3 Substation Tx2 W1F 11kV ocb close
4 Substation Tx2 X1F Indications and alarms
common +ve
5 Substation Tx2 X4F 11kV ocb open
6 Substation Tx2 X5F 11kV ocb closed
7 Substation Tx2 X14F Main protection
operated
8 Substation Tx2 X2F Indications common –ve
9 Substation Tx2 X7F 11kV ocb racked out
10 Substation Tx2 X8F 11kV ocb off remote
control

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: 220VDC switchboard To: New Relay Panel
Cable no: A/B220DC Cores: 7

Multi-core cable schedules Page 15 of 25


Kariba South Power Station - Automation Project

Length: m Qty: 2 glands

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 220V DC Batteries X211 Alarms common +ve
2 220V DC Batteries X212 Battery 1 earth fault
3 220V DC Batteries X213 Battery 2 earth fault
4 220V DC Batteries X214 Battery charger failure

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: North bank1 feeder relay panel To: New Relay Panel
Cable no: A/NBF1 Cores: 19
Length: m Qty: 2 glands

Multi-core cable schedules Page 16 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 North bank1 feeder W2K 11kV cb control
common +ve
2 North bank1 feeder W3K 11kV cb open
3 North bank1 feeder W1K 11kV cb close
4 North bank1 feeder X1K 11kV indications and
alarms common +ve
5 North bank1 feeder X4K 11kV ocb open
6 North bank1 feeder X5K 11kV ocb closed
7 North bank1 feeder X15K Main protection
operated
8 North bank1 feeder X14K Back-up protection
operated
9 North bank1 feeder X2K 11kV indications
common –ve
10 North bank1 feeder X7K 11kV ocb racked out
11 North bank1 feeder X8K 11kV ocb off remote
control
MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: 18kV s/gear air compressor control panel To: New Relay Panel
Cable no: A/SAC Cores:
Length: m Qty: 2 glands

Multi-core cable schedules Page 17 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 18kV s/gear air compressors X215 Alarms common +ve
2 18kV s/gear air compressors X216 Compressor 1 failure
3 18kV s/gear air compressors X217 Compressor 2 failure
4 18kV s/gear air compressors X218 HP system 1 low air
pressure
5 18kV s/gear air compressors X219 HP system 1 low air
pressure

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Emergency drain pump To: New Relay Panel
Cable no: A/NBF1 Cores: 19
Length: m Qty: 2 glands

Multi-core cable schedules Page 18 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 Emergency drain pump W2P Circuit breaker control
common +ve
2 Emergency drain pump W1P Ocb close
3 Emergency drain pump W3P Ocb open
4 Emergency drain pump X1P Indications and alarms
common +ve
5 Emergency drain pump X4P Ocb open
6 Emergency drain pump X5P Ocb closed
7 Emergency drain pump X14P Overcurrent/ earthfault
protection
8 Emergency drain pump X2P Indications common –ve
9 Emergency drain pump X7P Ocb racked out
10 Emergency drain pump X8P Ocb off remote control
11 Emergency drain pump X17P Trip circuit failure

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: North bank feeder 2 To: New Relay Panel
Cable no: A/NBF2 Cores:
Length: m Qty: 2 glands

Multi-core cable schedules Page 19 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 North bank feeder No2 W2C Circuit breaker control
common +ve
2 North bank feeder No2 W1C Ocb close
3 North bank feeder No2 W3C Ocb open
4 North bank feeder No2 X1C Indications and alarms
common +ve
5 North bank feeder No2 X4C Ocb open
6 North bank feeder No2 X5C Ocb closed
7 North bank feeder No2 X14C Overcurrent/ earthfault
protection
8 North bank feeder No2 X2C Indications common –ve
9 North bank feeder No2 X7C Ocb racked out
10 North bank feeder No2 X8C Ocb off remote control
11 North bank feeder No2 X17C Trip circuit failure

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: ‘Mulsifyre’ fire protection (Turbine hall) To: New Relay Panel
Cable no: A/MFP Cores: 5
Length: m Qty: 2 glands

Multi-core cable schedules Page 20 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 ‘Mulsifyre’ equipment X220 Alarm common +ve
2 ‘Mulsifyre’ equipment X221 Fire protection operated

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: 11kV bus section relay panel To: New Relay Panel
Cable no: A/BS11 Cores: 19
Length: m Qty: 2 glands

Multi-core cable schedules Page 21 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 11kV bus section W2J Circuit breaker control
common +ve
2 11kV bus section W1J Circuit breaker close
3 11kV bus section W3J Circuit breaker open
4 11kV bus section X1J Indications and alarms
common +ve
5 11kV bus section X4J Circuit breaker open
6 11kV bus section X5J Circuit breaker closed
7 11kV bus section X14J Main protection
operated
8 11kV bus section X2J Indications common -ve
9 11kV bus section X7J Circuit breaker racked
out
10 11kV bus section X8J Circuit breaker off
remote control
11 11kV bus section X17J Trip circuit failure
MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: 380V bus section relay panel To: New Relay Panel
Cable no: A/BS380 Cores: 19
Length: m Qty: 2 glands

Multi-core cable schedules Page 22 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


Kiosk Panel
No Core Ferrule Term Ferrule Term Comments
Number No No No No
1 380V bus section W502A Circuit breaker control
common +ve
2 380V bus section W501A Circuit breaker close
3 380V bus section W503A Circuit breaker open
4 380V bus section X501A Indications and alarms
common +ve
5 380V bus section X504A Circuit breaker open
6 380V bus section X505A Circuit breaker closed
7 380V bus section X514A Main protection
operated
8 380V bus section X522A Indications common -ve
9 380V bus section X518A Circuit breaker racked
out
10 380V bus section Circuit breaker off
remote control

MULTICORE CABLE SCHEDULE

Date: 17-12-2001
From: Turbine Panel To: New Relay Panel
Cable no: A/TP Cores: 7
Length: m Qty: 2 glands

Multi-core cable schedules Page 23 of 25


Kariba South Power Station - Automation Project

Relay Plant A/ST1 Marshalling New Relay


No Kiosk Panel
Core Ferrule Term Ferrule Term Comments
Number No No No No
Intake gate house no1 Z162 Intake gate control
common -ve
Intake gate house no1 Z163 Gate close
Intake gate house no1 L41 Indications common +ve
Intake gate house no1 L42 Gate open
Intake gate house no1 L43 Gate closed
Intake gate house no2 Z162A Intake gate control
common -ve
Intake gate house no2 Z163A Gate close
Intake gate house no2 L41A Indications common +ve
Intake gate house no2 L42A Gate open
Intake gate house no2 L43A Gate closed
Intake gate house no3 Z162B Intake gate control
common -ve
Plant A/ST1 Marshalling New Relay
Kiosk Panel

No Core Ferrule Term Ferrule Term Comments


Number No No No No
Intake gate house no3 Z163B Gate close
Intake gate house no3 L41B Indications common +ve
Intake gate house no3 L42B Gate open
Intake gate house no3 L43B Gate closed

Multi-core cable schedules Page 24 of 25


Kariba South Power Station - Automation Project

Intake gate house no4 Z162C Intake gate control


common -ve
Intake gate house no4 Z163C Gate close
Intake gate house no4 L41C Indications common +ve
Intake gate house no4 L42C Gate open
Intake gate house no4 L43C Gate closed
Intake gate house no5 Z162D Intake gate control
common -ve
Intake gate house no5 Z163D Gate close
Intake gate house no5 L41D Indications common +ve
Intake gate house no5 L42D Gate open
Intake gate house no5 L43D Gate closed
Intake gate house no6 Z162E Intake gate control
common -ve
Intake gate house no6 Z163E Gate close
Intake gate house no6 L41E Indications common +ve
Intake gate house no6 L42E Gate open
Intake gate house no6 L43E Gate closed

Multi-core cable schedules Page 25 of 25