Foundation for Rural Development
Monthly Time Sheet Employee Name: Badshah Hazrat
Project Coordinator
For the Month of: January 2019 Designation:
MPS-UNDP Rule of Law ( Lot-1)
Project
Date--->
Attendance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total hrs.
Regular 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 161
Own
Casual leave
Leave with out pay
Compensatory leave
Total hours:
NOTE: The above allocation of time is a true to the best of my knowledge and belief.
Prepared by:______________________ Reviewed by: ______________________________
(Employee) (Supervisor)
Foundation for Rural Development
Monthly Time Sheet Employee Name: Noman shah
Lawyer
For the Month of: May 2019 Designation:
MPS-UNDP Rule of Law ( Lot-1)
Project
Date--->
Attendance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total hrs.
Regular 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 161
Own
Casual leave
Leave with out pay
Compensatory leave
Total hours:
NOTE: The above allocation of time is a true to the best of my knowledge and belief.
Prepared by:______________________ Reviewed by: ______________________________
(Employee) (Supervisor)