0% found this document useful (0 votes)
94 views2 pages

Foundation Rural Development: Monthly Time Sheet

The documents are monthly time sheets for two employees of the Foundation for Rural Development. Badshah Hazrat worked as a Project Coordinator for the MPS-UNDP Rule of Law project in January 2019, logging 161 regular hours for the month. Noman shah worked as a Lawyer for the same project in May 2019, also logging 161 regular hours for the month. Both time sheets were prepared by the employees and reviewed by their supervisors.

Uploaded by

noman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views2 pages

Foundation Rural Development: Monthly Time Sheet

The documents are monthly time sheets for two employees of the Foundation for Rural Development. Badshah Hazrat worked as a Project Coordinator for the MPS-UNDP Rule of Law project in January 2019, logging 161 regular hours for the month. Noman shah worked as a Lawyer for the same project in May 2019, also logging 161 regular hours for the month. Both time sheets were prepared by the employees and reviewed by their supervisors.

Uploaded by

noman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Foundation for Rural Development

Monthly Time Sheet Employee Name: Badshah Hazrat

Project Coordinator
For the Month of: January 2019 Designation:

MPS-UNDP Rule of Law ( Lot-1)


Project

Date--->
Attendance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total hrs.

Regular 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 161

Own

Casual leave

Leave with out pay

Compensatory leave

Total hours:

NOTE: The above allocation of time is a true to the best of my knowledge and belief.

Prepared by:______________________ Reviewed by: ______________________________


(Employee) (Supervisor)
Foundation for Rural Development
Monthly Time Sheet Employee Name: Noman shah

Lawyer
For the Month of: May 2019 Designation:

MPS-UNDP Rule of Law ( Lot-1)


Project

Date--->
Attendance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total hrs.

Regular 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 161

Own

Casual leave

Leave with out pay

Compensatory leave

Total hours:

NOTE: The above allocation of time is a true to the best of my knowledge and belief.

Prepared by:______________________ Reviewed by: ______________________________


(Employee) (Supervisor)

You might also like