Selecting A Job For Method Study
Selecting A Job For Method Study
1. The M.S involves cost & time .If sufficicent reurns are not attained the whoe exercisewill go
waste .Thus the money spent shuld b justifies by the selling forrom it. Following guidelines can
be used for selecting ajob
a. Operation’s involving accessive labour.
b. Operations producing lot of scrap or defecties
c. Operations gaving poor utilization of resources.
2. The M.s man shuld be careful enough to select ajob en which he has the technical know ledge &
expertise. A person selecting a job in in has area of expertise is going to do full justice.
3. M.S means a change as tis i going to affect the way in which job is done & is not fully accepted
by work man & the union. Human considerations play a vital role in M.S Following are some of
the situations where human aspect should be givng due importance
a. Workers complaint about unnecessary & tiring work.
b. More frequency of accdnts
c. Inconsistant earnings.
Lec 19- 20
Recording technique:
The next step in basic procedure ist orecord all facts relatin to the existing method. Th activities selected
for investigation may be visualized in order to improve them through sub sequent critical examination. It
is essential to gave some means of planning on record all the necessary facts about the existin method.
The Records are very much useful to make before & after comparison toa asses the effectiveness of the
purposed methd.
The recording technique are designed to simplify and standardized the recording work.
Gilbreth introduce the graphical mthod of recording. In order to make the presentation of the facts
clearly, it is useful to use symbols instead of written description.
Recoudign Techniques:
According to the nature of the job being studied & purpose for which the record is required the
techniques fall inot following categories:
1. Charts.
2. Diagrams
3. Models
1. Charts: This is the most popular method of recording the facts. The activitis comprising the
jobare recorded using themethod study symbol.A great are is to be taken in preparing the
cahart. So that the informaio it shows is easily understood & recognized. The following
information shuld be given the charts.
a. Adequate Discription of thee activities
b. Wheater the chartin is for present or purposed method
c. Specific reference to whne the activities will begin & end
d. Time & distance secter use whenever necessary.
e. The date of charting & name of the person who does charting
It is also called out the process chart. In O.P chart gives the Birseye view (overall) of the whole process
by recording only the major activities & inspection involves in the process. O.P chart uses only two
symbols, operation & inspection. O.Pchat is help full to
Construction of Chart:
A chart ismade by drawing arrows to show the entry of the main material to writing above the
description of componenets & below the time the of conditions. As ech operation , inspection, takes
place the symbol is eneterd & no in the sequence with abrief discipline on the right side & time required
for operation on left hand side.During assembly process, the major process is charted toward the R.H
side of t eh chart & subsiese process on the L.H Side. These are join to each other & to the main trunk
(junction) at the place of entry of material are sub assmblyh. The chart doesnot show where the work
takes place whoe perform this.
Lec 22
Dated: 16/5/2012
Left hand Right Hand
// // Screw nut
Symbol
Frequency of R.H 5 4 0 0
Frequency of L.H 2 2 0 2