0% found this document useful (0 votes)
37 views3 pages

Project Manager/Construction Manager

The document outlines the roles and responsibilities of various parties involved in a building construction project. It discusses the Project Manager/Construction Manager who is responsible for implementing the method statement and ensuring resources and safety. It also outlines the roles of the Project Engineer, QA/QC Engineer, Foreman, Surveyor, Safety Officer, and Sub-Contractor in carrying out construction works according to the approved drawings, method statements, and specifications while following proper safety, quality control and welfare procedures.

Uploaded by

ashfaq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views3 pages

Project Manager/Construction Manager

The document outlines the roles and responsibilities of various parties involved in a building construction project. It discusses the Project Manager/Construction Manager who is responsible for implementing the method statement and ensuring resources and safety. It also outlines the roles of the Project Engineer, QA/QC Engineer, Foreman, Surveyor, Safety Officer, and Sub-Contractor in carrying out construction works according to the approved drawings, method statements, and specifications while following proper safety, quality control and welfare procedures.

Uploaded by

ashfaq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Building construction

Excavation Backfill Compaction Anti termite PCC Reinforcement Foundation concrete Slab on grade
Columns Beams Slabs Core wall Shear wall

Project Manager/Construction Manager:


 The PM/Construction Manager is responsible for the implementation of Method
Statement.
 The PM/Construction Manager shall ensure that the key personnel are well aware of the
Specification and Method Statement.
 The Construction Manager shall ensure that all resources like Manpower, Material and
Equipment are available to carry out the work as planned and without any delay or
confusions.
 Coordinate with the QC and EHS team for proper execution of work in a safe
environment.
 Implement and monitor effectiveness of the risk assessment program.
 Regularly discuss OSH at periodic meetings.
 Ensure availability of welfare facility for the workforce.
Project Engineer/Site Engineer:

 The Project Engineer is responsible to carry out the work as per the Method Statement,
Specification and Approved Drawings.
 The Project Engineer shall ensure that the resources are available to carry out the works
as scheduled.
 Ensure that MSRA trained to site supervisors upon approval and prior to work
executions, in additional to periodic training for the MSRA.
 Ensure reporting of any new hazard/incidents/ unplanned events to EHS team to review
of the MSRA.
 Ensure that all workforces are fully aware about the emergency response and
evacuation procedure.
 Ensure full compliance with EHS recommendations during ejection of the activity.
QA/QC Engineer/Inspector:

 The QA/QC Engineer/Inspector is responsible for the effective monitoring,


implementation & documentation of QA/QC Procedures.
 The QA/QC Engineer/Inspector shall ensure the implementation of ITP and Method
Statements.
 The QA/QC Engineer/Inspector shall ensure that all the approvals are available for the
safe movements of works.
 The QA/QC Engineer/Inspector will coordinate with the consultant for site work
inspection.
Foreman:
 The Foreman is responsible to carry out the work as per the Method Statement,
Specification and Approved Drawings.
 The Foreman shall be available at site full time for the execution of works.
 Ensure that workforce is trained about the MSRA.
 Ensure that welfare facilities are well maintained and housekeeping is proper during
work execution.
 Ensure that daily task briefing is conducted prior to work commencement.
 Ensure that head counting is in place after break hours.
Surveyor:
 The Surveyor shall ensure that all the survey related works carried out as per the
approved drawings.
 The Surveyor shall ensure that setting out and level carried out with Total station and
Auto level.
 For all survey related works he shall be available at site full time.
Safety Engineer/Officer:
 The Safety officer shall observe and advise all site personnel of all safety requirements
in addition to giving safety inductions on regular basis or whenever necessary.
 Conduct induction/training to site staff/workers.
 Conduct site inspection and report deficiencies to project manager/HSE Manager.
Sub-Contractor:

 Ensure the work is carried out as per the Method Statement, Specification and
Approved Drawings.
 Ensure that the resources are available to carry out the works as scheduled.
 Ensure that MSRA trained to site supervisors upon approval and prior to work
executions, in additional to periodic training for the MSRA.
 Ensure reporting of any new hazard/incidents/ unplanned events to EHS team to review
of the MSRA.
 Ensure the availability of competent employees to complete the task
 Ensure the availability of adequate welfare facilities at site
 Ensure the availability of required PPE at site

You might also like