Bridge Parameters
7 Average Bed Level = 234.933
8 OHFL as per Bridge Register = 238.048
9 Existing Bottom of Slab/Girder = 239.928
10 Proposed bottom of Slab/Girder = 241.735
11 Existing Formation Level = 242.538
12 Proposed Formation Level = 242.605
13 Existing Rail Level = 243.228
14 Proposed Rail Level = 243.343
Bridge No. 767/1
Sr. No. Hydraulic Data Values Unit
1 Catchment Area 24.71 Km2
2 Design Discharge 245.237 m3/s
3 Velocity 2.830 m/s
4 WaterWay Requirment 86.660 m2
5 OHFL as per Bridge Register 238.048 m
6 CHFL 239.373 m
7 Average Bed Level 234.933 m
8 Free board -Existing Bridge. w.r.to CHFL 2.958 m
Free board -Proposed Bridge. w.r.to CHFL 3.025 m
9 Free board -Existing Bridge. w.r.to OHFL 4.490 m
Free board -Proposed Bridge. w.r.to OHFL 4.557 m
10 Vertical Clearance - Existing Bridge. w.r.to CHFL 0.555 m
Vertical Clearance - Proposed Bridge. w.r.to CHFL 2.362 m
11 Vertical Clearance - Existing Bridge. w.r.to OHFL 1.880 m
Vertical Clearance - Proposed Bridge. w.r.to OHFL 3.687 m
12 Length of Longest Stream Course from Source 11.87 Km
13 Height of Farthest Point 55.07 m
14 Sub-Zone 3f
15 Nature of Soil Black Cotton Soil
16 Max Depth of Scour from CHFL m
17 Scour Level m
Flood Estimation
Improved Rational Formula
Q₅₀ = 0.278 x C x I x A
Where,
Q₅₀ = Design Flood (m3/s) for 50 year return period
C = Runoff coefficient between 0 and 1.0
A = Catchment Area (Sq.Km)
I = 50 yr Rainfall intensity in mm/h lasting for tc hour
duration, where tc-time of concentration
Runoff Coefficient C
The value of 'C' depends on the nature of soil,soil cover and location of
catctment and may be taken as under :-
tc = 3.246751 hrs
tc = 194.805 mins
Where:-
L=Length of Longest Stream
H=Height of farthest above the point of interest along the river.
Runoff Coefficient C
R = 25.3 cm
F = 0.850 Ref. above table
C = 0.456 ( Rx F)^0.20
C = 0.840
Q₅₀ = 0.278 x C x I x A
Q₅₀ = 0.278x0.84x42.5x24.71
Q₅₀ = 245.237 m3/s
Where Q-Discharge
A-Area of across the River=BxY
R=A/P = Area/ Perimete=BxY/(B+2Y)
S-Slope at Bridge Site
OK
�/√𝑔�
Froud No. (Fr) = = 0.429701 < 1
Flow is Sub-Critical
As Waterway requirment fullfilled , hence there is no contraction in waterway at c/s of Ex. Bridge
Therefore Afflux at bridge section will be zero.
As Existing Bridge is RCC Box. Therefore Vertical Clearance requirement is Zero for Existing Bridge.
Free Board at U/S Side of Ex. Bridge should be estimated including afflux, Because Waterway requirment not f
at U/S Side of Ex. Bridge.
o) Calculation of afflux For Exsisiting Bridge
- Velocity of flow (V) = 2.830
- Unobstructed sectional area of river (A) = 126.1404
- (Clear distance between abutment x Height)
- Obstructed sectional area of river (a) = 104.8284
- Afflux = [�^2/17.88+0.01524]𝑥[ 〖 (�/ = 0.207
�)^2 〗− 1]
Formation Level
q) Minimum Formation Level Required = CHFL+Afflux+Free Board = 240.580
r) Existing Formation Level = 242.538
s) Hence Proposed Formation Level = 242.605
0.380
1.500
253 mm
92.00 mm
138.00 mm
42.5 mm/hr
for minor stream
1 in 220
2/3x0.004545^1/"2
m3/sec
m/sec
m2
m
m
m
m
m Ref.Cl.No. 4.8
m as against Ex. Br. = 0.555 m
m/sec
m2 Ref. Dwg
m2 Ref. Dwg
m Ref. Br.Str.code
Cl no. 4.7
m Ref.Cl.No.4.9