BR No 767-1 (NGP)

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9
At a glance
Powered by AI
The document discusses the hydraulic design calculations for a major bridge site including catchment area, design discharge, waterway requirements, and formation levels.

The catchment area is 24.71 sqkm and the design discharge is 245.237 cubic meters per second.

The existing opening consists of 3 spans of 6.5 meters each while the proposed opening consists of 2 spans of 9.15 meters each.

Waterway Calculation for Major Bridge

Bridge Site Details


1 Section = NGP-SEGM
2 Bridge No. = 767/1
3 Chainage = 7071 m
4 Km CH. 0 from CSTM = 767.641 Km
5 Existing Opening 3 x 6.5 RCC Box
- No. of Span = 3
- Length of Span = 6.5 m
6 Proposed Opening 2 x 9.15 PSC Slab
- No. of Span = 2
- Length of Span = 9.15 m
Design Data
1 Name of Hydrometerological Sub-Zone = 3f Lower Godavari
2 Name of Tributary
3 Shape of Catchment Fern Shape
4 Location - Latitude = 20°45'23.65"N
- Longitude = 78°40'59.42"E

Physical Characteristic of the Catchment


1 Catchment Area (A) = 24.71 Km2
2 Length of Longest Stream Course from = 11.87 Km Refer
source to the Bridge Site (L) TopoSheet
5 Height of Farthest point above the point of= 55.067 m
interest along the river (H)
6 Nature of Soil = Black Cotton Soil

Bridge Parameters
7 Average Bed Level = 234.933
8 OHFL as per Bridge Register = 238.048
9 Existing Bottom of Slab/Girder = 239.928
10 Proposed bottom of Slab/Girder = 241.735
11 Existing Formation Level = 242.538
12 Proposed Formation Level = 242.605
13 Existing Rail Level = 243.228
14 Proposed Rail Level = 243.343
Bridge No. 767/1
Sr. No. Hydraulic Data Values Unit
1 Catchment Area 24.71 Km2
2 Design Discharge 245.237 m3/s
3 Velocity 2.830 m/s
4 WaterWay Requirment 86.660 m2
5 OHFL as per Bridge Register 238.048 m
6 CHFL 239.373 m
7 Average Bed Level 234.933 m
8 Free board -Existing Bridge. w.r.to CHFL 2.958 m
Free board -Proposed Bridge. w.r.to CHFL 3.025 m
9 Free board -Existing Bridge. w.r.to OHFL 4.490 m
Free board -Proposed Bridge. w.r.to OHFL 4.557 m
10 Vertical Clearance - Existing Bridge. w.r.to CHFL 0.555 m
Vertical Clearance - Proposed Bridge. w.r.to CHFL 2.362 m
11 Vertical Clearance - Existing Bridge. w.r.to OHFL 1.880 m
Vertical Clearance - Proposed Bridge. w.r.to OHFL 3.687 m
12 Length of Longest Stream Course from Source 11.87 Km
13 Height of Farthest Point 55.07 m
14 Sub-Zone 3f
15 Nature of Soil Black Cotton Soil
16 Max Depth of Scour from CHFL m
17 Scour Level m
Flood Estimation
Improved Rational Formula

Q₅₀ = 0.278 x C x I x A

Where,
Q₅₀ = Design Flood (m3/s) for 50 year return period
C = Runoff coefficient between 0 and 1.0
A = Catchment Area (Sq.Km)
I = 50 yr Rainfall intensity in mm/h lasting for tc hour
duration, where tc-time of concentration

Runoff Coefficient C
The value of 'C' depends on the nature of soil,soil cover and location of
catctment and may be taken as under :-

Formula to obtain Runoff Coefficient "C"

Description of catchment Formula for 'C'


a) Sandy soil/sandy loam/arid areas C = 0.249 (R x F) 0.20
b) Alluvium/silty loam/costal area C = 0.332 (R x F) 0.20
Red soil/clayey loam/gray or
c) brown,alluvium/cultivated plains/tall C = 0.415 (R x F) 0.20
crops/wooded areas.

Black cotton/clayey soil/lightly


d) covered/lighted wooded/plain & C = 0.456 (R x F) 0.20
barren/submontara & plateau.
e) Hilly soils/plateau & barren. C = 0.498 (R x F) 0.20

where R = 50 Year '24 hour' point rainfall (cm)


F = Areal reduction factor depending upon catchment area & duration of
rainfall from table below.

Catchment area Duration of Rainfall


( sq.km ) < 30 min. 30 to 60 min. 60 to 100 min.
< 2.50 0.72 0.81 0.88
> 2.50 < 5.00 0.71 0.80 0.87
> 5.00 < 13.00 0.70 0.79 0.86
> 13.00 < 25.00 0.68 0.78 0.85
NOTE :- Rainfall duration shall be equal to the calculated 'Tc' for the catchment.

Calculation of Time of Concentration 'tc


0.345 0.345
Time of concentration 'tc = L3 = 1672.45
H 55.07

tc = 3.246751 hrs
tc = 194.805 mins
Where:-
L=Length of Longest Stream
H=Height of farthest above the point of interest along the river.

Runoff Coefficient C

R=50 yr 24 hrs Rainfall Ref. Plate 8 from CWC report of Subzone 3f

R = 25.3 cm
F = 0.850 Ref. above table

C = 0.456 ( Rx F)^0.20
C = 0.840

Calculation of Intensity of rainfall :-

i) Tc h ratio ( from map fig 4 of RBF (16) is based on time concentration =


& Ratio of 50yrs T hrs Rainfall / 50yrs 24hrs Rainfall)
ii) 1 h ratio ( from map fig 4 of RBF (16) is based on time concentration =
& Ratio of 50yrs T hrs Rainfall / 50yrs 24hrs Rainfall)
Tc h ratio 0.570
iii) Coeff. K' = = =
1 h ratio 0.380
iv) 50 year 24 hrs rainfall from plate 8 of cwc report =220x1.15 =
v) (a) R 50 ( 1 ) = Ref. Fig. No.3.6 of RBF-16 = 1.15 x 80 =
vi) (b) R 50 ( Tc) = K xR50 (1) = 1.50 x 92.000 =
R50 (tc) 138.00
vii) Intensity of Rainfall (I) = R = =
tc 3.247

Design flood discharge :-

Q₅₀ = 0.278 x C x I x A
Q₅₀ = 0.278x0.84x42.5x24.71
Q₅₀ = 245.237 m3/s

A. Velocity Calculation of Existing Bridge m

Velocity by Discarge (V) = Q / A

1/𝑛 𝑥 �^(2/3) �^(1/2)


1/𝑛 𝑥 �^(2/3) �^(1/2)
Velocity by Mannig's Equation (V)=

Where Q-Discharge
A-Area of across the River=BxY
R=A/P = Area/ Perimete=BxY/(B+2Y)
S-Slope at Bridge Site

a) Discharge (Q50) = 245.240


b) B (total width of Existing opening) = 3 x 6.5
c) Mannnings Coeff (n) - Open Channel Hydraulics by Van Te Chow = 0.05
d) Slope of stream (as per Site Survey of River - Level Diff at 100m 0.004545
u/s Side is = 235.188-234.733 = 0.0.455m)

Equate V Assume Y= 4.450


1/𝑛 𝑥 �^(2/3) �^(1/2)
Q/(BxY) =
245.24/(3 x 6.5x4.45) = 1/0.05x(3 x 6.5x4.45)/(3 x 6.5+2x4.45)^2/3x0.004545^1/"2
2.83 m/sec = 2.84 m/sec

OK

Check for Velocity

�/√𝑔�
Froud No. (Fr) = = 0.429701 < 1

Flow is Sub-Critical

B. Checking for adequacy of waterway provided For Existing Bridge:-

a) Discharge (Q) = 245.240


b) Mean velocity ( allowed ) (V) = 2.830
c) Average waterway required = Q/V = 245.24/2.83 = 86.66
d) Exsisting opening = 3 x 6.5 = 19.5
e) Ht.of water = Ave. waterway/Exist. opening = 86.66/19.5 = 4.440
f) Average Bed level = 234.933
g) OH.F.L. = 238.048

As Waterway requirment fullfilled , hence there is no contraction in waterway at c/s of Ex. Bridge
Therefore Afflux at bridge section will be zero.

h) Therefore C.H.F.L .= Bed Level + Height of Water = 239.373

i) Vertical Clearance required as per Br.Sub.Struc.Code = 1.077

j) Required Bottom of Slab/Girder = CHFL + Vertical Clearance = 240.450


k) Existing Bottom of Slab/Girder = 239.928
l) Hence provided Proposed Bottom of Slab/Girder = 241.735

Vertical Clearance w. r. to CHFL


m) Vertical Clearance available for Proposed Bridge=BOG-CHFL = 2.362
Vertical Clearance w. r. to OHFL
n) Vertical Clearance available for Proposed Bridge=BOG-OHFL = 3.687

As Existing Bridge is RCC Box. Therefore Vertical Clearance requirement is Zero for Existing Bridge.

Free Board at U/S Side of Ex. Bridge should be estimated including afflux, Because Waterway requirment not f
at U/S Side of Ex. Bridge.
o) Calculation of afflux For Exsisiting Bridge
- Velocity of flow (V) = 2.830
- Unobstructed sectional area of river (A) = 126.1404
- (Clear distance between abutment x Height)
- Obstructed sectional area of river (a) = 104.8284
- Afflux = [�^2/17.88+0.01524]𝑥[ 〖 (�/ = 0.207
�)^2 〗− 1]

p) Required free Board as per Br. Sub Struct. Code = 1

Formation Level
q) Minimum Formation Level Required = CHFL+Afflux+Free Board = 240.580
r) Existing Formation Level = 242.538
s) Hence Proposed Formation Level = 242.605

Free Board w. r. to CHFL


t) Free Board of Proposed Bridge = F.L. - (CHFL+Afflux) = 3.025
Free Board w. r. to OHFL
u) Free Board of Proposed Bridge = F.L. - OHFL = 4.557
0.570

0.380

1.500

253 mm
92.00 mm
138.00 mm

42.5 mm/hr
for minor stream
1 in 220

2/3x0.004545^1/"2

m3/sec
m/sec
m2
m
m
m
m

ay at c/s of Ex. Bridge

m Ref.Cl.No. 4.8
m as against Ex. Br. = 0.555 m

m as against Ex. Br. = 1.880 m

Zero for Existing Bridge.

ecause Waterway requirment not fulfilled

m/sec
m2 Ref. Dwg

m2 Ref. Dwg
m Ref. Br.Str.code
Cl no. 4.7

m Ref.Cl.No.4.9

m as against Ex. Br. = 2.958 m

m as against Ex. Br. = 4.490 m

You might also like