For Contrac Cell

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 26

Sr. ITEM.

CLAIMED
DESCRIPTION UOM RATE PERCENT
No. CODE
UNIT PPNG EREC NIBR < 2"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 153.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 153.00 30%
1 3265535 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 153.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 153.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 153.00 8%
BOX UP & HAND OVER 7% INM 153.00 7%
UNIT PPNG EREC NIBR >= 2" TO <=6" NB

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 128.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 128.00 30%
2 3265536 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 128.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 128.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 128.00 8%
BOX UP & HAND OVER 7% INM 128.00 7%
"UNIT PPNG EREC NIBR >6"" TO <=24"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 122.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 122.00 30%
3 3265537 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT INM 122.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 122.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 122.00 8%
BOX UP & HAND OVER 7% INM 122.00 7%
"UNIT PPNG EREC IBR < 2"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 161.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 161.00 30%
4 3265539
ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 161.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 161.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 161.00 8%
"UNIT PPNG EREC IBR >= 2"" TO <=6"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 135.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 135.00 30%
5 3265540 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 135.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 135.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 135.00 8%
BOX UP & HAND OVER 7% INM 135.00 7%
UNIT PPNG EREC IBR >6" TO <=24

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 129.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 129.00 30%
6 3265541
6 3265541 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 129.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 129.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 129.00 8%
BOX UP & HAND OVER 7% INM 129.00 7%
UNIT-WELD CS-NIBR <2"",T<10MM
7 3265253 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 389.00 90%
AFTER HYDROTEST COMPLETION 10% IND 389.00 10%
UNIT-WELD CS-NIBR <2"" 10 <=T < 12MM
8 3265254 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 419.00 90%
AFTER HYDROTEST COMPLETION 10% IND 419.00 10%
UNIT WELD CS- NIBR >=2" T <10MM
9 3265256 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 299.00 90%
AFTER HYDROTEST COMPLETION 10% IND 299.00 10%
UNIT-WELD CS-NIBR >=2"" 10 <=T <12MM
10 3265257 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 353.00 90%
AFTER HYDROTEST COMPLETION 10% IND 353.00 10%
UNIT- WELD CS-NIBR >= 2" 12<= T<15MM
11 3265258 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 404.00 90%
AFTER HYDROTEST COMPLETION 10% IND 404.00 10%
UNIT-WELD CS-IBR <2"",T<10MM
12 3265267 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 428.00 90%
AFTER HYDROTEST COMPLETION 10% IND 428.00 10%
UNIT-WELD CS-IBR >=2"" T <10MM
13 3265270 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 329.00 90%
AFTER HYDROTEST COMPLETION 10% IND 329.00 10%
"UNIT-WELD SS-NIBR <2"",T<10MM"
3265309 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 738.00 90%
AFTER HYDROTEST COMPLETION 10% IND 738.00 10%
"UNIT- WELD SS-NIBR >=2"" T <10MM"
14 3265312 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 568.00 90%
AFTER HYDROTEST COMPLETION 10% IND 568.00 10%
"UNIT-WELD INCOLOY <2"",T<10MM"
15 3265337 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 870.00 90%
AFTER HYDROTEST COMPLETION 10% IND 870.00 10%
UNIT-WELD INCOLOY >=2"" T < 10MM
16 3265339 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 669.00 90%
AFTER HYDROTEST COMPLETION 10% IND 669.00 10%
UNIT-WELD DUP SS >=2" ,12<=T<15MM-
17 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1327.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1327.00 10%
UNIT-WELD DUP SS >2" T <10MM
18 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD DUP SS <2" ,T<10MM
19 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
19 3107471
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD SUPER DUP SS <2" ,T<10MM
20 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD SUPER DUP SS >2" ,T<10MM-
21 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
Flgd Vlv Erec <6" <=300 #
22 3265572 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 138.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 138.00 10%
Flgd Vlv Erec >=6" <= 300#
23 3265574 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 166.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 166.00 10%
"Flgd Vlv Erec >=6"" >300# to <=600#"
24 3265575 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 185.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 185.00 10%
"Flgd Safety Vlv Erec >=6"""
25 3265580 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 279.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 279.00 10%
EREC REC PLTFRM <= 10M HEIGHT
After Completion of Erection INR/MT 6379 55%
26 3263026
After QMD Clearance INR/MT 6379 35%
After acceptance by Reliance representative / EIC. INR/MT 6379 10%
EREC REC PLTFRM <= 20M HEIGHT
After Completion of Erection INR/MT 6757 55%
27 3263027
After QMD Clearance INR/MT 6757 35%
After acceptance by Reliance representative / EIC. INR/MT 6757 10%
ERECTION OF GRATINGS <=20M HEIGHT
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN SQM 209 55%
28 3263016
After QMD Clearance SQM 209 35%
After acceptance by Reliance representative / EIC. SQM 209 10%
EREC OF GRATINGS > 40M HGT FROM GRD LVL
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN SQM 322 55%
29 3263018
After QMD Clearance SQM 322 35%
After acceptance by Reliance representative / EIC. SQM 322 10%
EQUIP-EREC ROTARY-FINFAN COOLER-DRVNG MC
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 3420.00 30%
30 3269201
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 3420.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 3420.00 20%
31 3269202 EQUIP-EREC ROTARY-ASSMBLY-FIN FAN COOLER INR/MT 3420.00 100%
EQUIP-EREC ROTARY-PUMP&DRVNG MC>2MT
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 5700.00 30%
32 3269198
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 5700.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 5700.00 20%
EQUIP EREC-STATIC>5MT TO<=20MT

33 3269192
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 2528.00 30%
33 3269192
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 2528.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 2528.00 20%
EQUIP-EREC ROTARY-FAN/BLOWER-DRVNG MC
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 9405.00 30%
34 3269203
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 9405.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 9405.00 20%
EQUIP EREC-STATIC > 20 MT TO <= 50 MT
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 2298.00 30%
35 3269193
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 2298.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 2298.00 20%
YARD PIPE SUPPORT FABRICATION - CS INR/MT 14950 90%
36 3265590
YARD PIPE SUPPORT FABRICATION - CS INR/MT 14950 10%
PIPE SUPPORT ERECTION - CS
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN INR/MT 11923 55%
37 3265593
AFTER QMD CLEARANCE INR/MT 11923 35%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 11923 10%
ERECTION OF CIR PLTFRM STRUC. > 40 M HGT
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN INR/MT 14304 55%
38 3263035
AFTER QMD CLEARANCE INR/MT 14304 35%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 14304 10%
MISCELLANEOUS WORK - Extra Efforts @15% on "ERECTION OF
39 3107471 CIR LS 54927 100%

40 3299139 INCENTIVE-FESTIVAL LS 95000 100%


41 3298626 MAKING, EREC. & WELD-MS ROD ON RACK/UNIT MTR 478 100%
42 3300701 MOU WEAR PLATE WELD CS THK <=8 MM MTR 366 100%
43 3262995 YARD - WELD LIGHT STEEL STRUC MT 9319 100%
44 3302847 MOU SURFACE PREP&PAINT ON WELD JOINT ID 8 100%
45 3141355 FIXING OF SAFETY NET NR/SQ 7 100%
46 3141356 REMOVAL OF SAFETY NET NR/SQ 3 100%
47 3299935 ERECTN OF HANGING SCAFF 12M-18M HT INR/M2 145.00 100%
48 3299933 ERECTN OF HANGING SCAFF 6M - 12M HT INR/M2 130.00 100%
49 3299932 ERECTN OF HANGING SCAFFOLD UPT 6M HT INR/M2 117.00 100%

50 ERECTION-SCAFF ELEV 0-15M, WITH FIM INR/CUM 19.80 100%


3265778
51 3290901 EREC SCAFF ABV 15M & UPT 25M HEIGHT M3 20.00 100%
52 3290903 DISMANTLE SCAFF.>15 M TO 25 M HGT M3 13.00 100%

53 DISMANTLING-SCAFF ELEV 0-15M, WITH FIM INR/CUM 11.70 100%


3265785
54 3299939 DISMANTLE HANGING SCAFF UPTO 6M HT INR/M2 58.00
55 3299940 DISMANTLE HANGING SCAFF 6M - 12M HT INR/M2 65.00 100%
56 3299942 DISMANTLE HANGING SCAFF 12M - 18M HT INR/M2 72.00 100%
57 3290913 EREC & DISMANTLE OF COMP HANDRAIL SYSTEM M 16.50 100%
58 3290912 EREC & DISMANTLE OF PLATFORM M2 22.00 100%
59 3300140 LABOUR CHRGS F/CUTTING SCAFFOLDING PIPE NOS 11.00 100%
60 3264085 NDT RT PIPE UPTO 2"DIA, <=20MM THK INR/PJT 380.00 100%
61 3264086 NDT RT PIPE ABOVE 2"TO4"DIA,<=20MM THK IND 142.00 100%
62 3264087 NDT RT PIPE ABOVE 4" DIA,<=20MM THK IND 100.00 100%
63 3264080 STRESS RELIEVING SIZE>2"(CS),THK<=25MM IND 67.00 100%
64 3298622 EXTRA CHRGS-MANUAL ERE. INM 33.00 100%
65 3107471 MISCELLANEOUS WORK LS 100%
66 3269837 TRANSPORTATION OF RAW STRUCTURAL STEEL INR/MT 125 100%
67 3269838 TRANSPORTATION OF FABRICATED STR. STEEL INR/MT 150 100%
68 3252436 TRANSPORTATION OF RAW PIPES INM 3.50 100%
69 3252437 TRANSPORTATION OF FABRICATED PIPES INM 4.00 100%
70 3114925 CHARGES FOR MOBILISATION OF MANPOWER INR/PPR 1500.00 100%
71 3252438 TRANSPORTATION OF FITTINGS IND 4.00 100%
3079618 TRADE VALIDATION
HIGELY (Structural welder, pipe welder,pipe fitter, fabricator,foreman , structural fitter,
SKILLED supervisors) INR/PPR 752.00 100%
72 Grinder,Gas Cutter INR/PPR 510.00 100%
SKILLED
SEMI-SKILLED (Khalasi & Rigger) INR/PPR 482.00 100%
UNSKILLED Helper INR/PPR 399.00 100%
TOTAL AMOUNT ( RS )
Remarks

spl stp
5267 1096 4171
6686 1996 4690
6710
1996 4714
6685 1996 4689
6685 1996 4689
6685 1996 4689

4187 2934 1253


10589 7928 2661

18278 13823 4455


18477 13829 4648
18477 13829 4648
18477 13829 4648

5266 4192 1074


13650 10600 3050

22662 18274 4388


24163 19448 4715
24163 19448 4715
24163 19448 4715
spl stp

645 645
1424 700 724

1424 700 724


1424 700 724
1424 700 724
spl stp

482 147 335


2335 1970 365

3516 2885 631


4523 3665 858
4523 3665 858
4523 3665 858
0

104 76 28
3289 3162 127
3869 3543 326
5950 5525 425
5950 5525 425
5950 5525 425

1136 397713.6
1136 44190.4

558 210421.8
558 23380.2

526 141546.6
526 15727.4

117 37170.9
117 4130.1

126 45813.6
126 5090.4

663 255387.6
663 28376.4

356 105411.6
356 11712.4

116 77047.2
116 8560.8

248 126777.6
248 14086.4

1138 891054
1138 99006

642 386548.2
642 42949.8

10 11943
10 1327

921 922565.7
921 102507.3

581 581987.7
581 64665.3

90 90153
90 10017

56 56095.2
56 6232.8
Sr. ITEM. CLAIMED
DESCRIPTION UOM RATE PERCENT
No. CODE
UNIT PPNG EREC NIBR < 2"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 153.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 153.00 30%
1 3265535 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 153.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 153.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 153.00 8%
BOX UP & HAND OVER 7% INM 153.00 7%
UNIT PPNG EREC NIBR >= 2" TO <=6" NB

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 128.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 128.00 30%
2 3265536 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 128.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 128.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 128.00 8%
BOX UP & HAND OVER 7% INM 128.00 7%
"UNIT PPNG EREC NIBR >6"" TO <=24"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 122.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 122.00 30%
3 3265537 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT INM 122.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 122.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 122.00 8%
BOX UP & HAND OVER 7% INM 122.00 7%
"UNIT PPNG EREC IBR < 2"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 161.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 161.00 30%
4 3265539
ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 161.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 161.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 161.00 8%
"UNIT PPNG EREC IBR >= 2"" TO <=6"" NB"

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 135.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 135.00 30%
5 3265540 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 135.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 135.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 135.00 8%
BOX UP & HAND OVER 7% INM 135.00 7%
UNIT PPNG EREC IBR >6" TO <=24

SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 129.00 30%

SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 129.00 30%
6 3265541
6 3265541 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 129.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 129.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 129.00 8%
BOX UP & HAND OVER 7% INM 129.00 7%
UNIT-WELD CS-NIBR <2"",T<10MM
7 3265253 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 389.00 90%
AFTER HYDROTEST COMPLETION 10% IND 389.00 10%
UNIT-WELD CS-NIBR <2"" 10 <=T < 12MM
8 3265254 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 419.00 90%
AFTER HYDROTEST COMPLETION 10% IND 419.00 10%
UNIT WELD CS- NIBR >=2" T <10MM
9 3265256 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 299.00 90%
AFTER HYDROTEST COMPLETION 10% IND 299.00 10%
UNIT-WELD CS-NIBR >=2"" 10 <=T <12MM
10 3265257 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 353.00 90%
AFTER HYDROTEST COMPLETION 10% IND 353.00 10%
UNIT- WELD CS-NIBR >= 2" 12<= T<15MM
11 3265258 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 404.00 90%
AFTER HYDROTEST COMPLETION 10% IND 404.00 10%
UNIT-WELD CS-IBR <2"",T<10MM
12 3265267 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 428.00 90%
AFTER HYDROTEST COMPLETION 10% IND 428.00 10%
UNIT-WELD CS-IBR >=2"" T <10MM
13 3265270 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 329.00 90%
AFTER HYDROTEST COMPLETION 10% IND 329.00 10%
"UNIT-WELD SS-NIBR <2"",T<10MM"
3265309 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 738.00 90%
AFTER HYDROTEST COMPLETION 10% IND 738.00 10%
"UNIT- WELD SS-NIBR >=2"" T <10MM"
14 3265312 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 568.00 90%
AFTER HYDROTEST COMPLETION 10% IND 568.00 10%
"UNIT-WELD INCOLOY <2"",T<10MM"
15 3265337 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 870.00 90%
AFTER HYDROTEST COMPLETION 10% IND 870.00 10%
UNIT-WELD INCOLOY >=2"" T < 10MM
16 3265339 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 669.00 90%
AFTER HYDROTEST COMPLETION 10% IND 669.00 10%
UNIT-WELD DUP SS >=2" ,12<=T<15MM-
17 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1327.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1327.00 10%
UNIT-WELD DUP SS >2" T <10MM
18 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD DUP SS <2" ,T<10MM
19 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
19 3107471
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD SUPER DUP SS <2" ,T<10MM
20 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD SUPER DUP SS >2" ,T<10MM-
21 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
Flgd Vlv Erec <6" <=300 #
22 3265572 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 138.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 138.00 10%
Flgd Vlv Erec >=6" <= 300#
23 3265574 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 166.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 166.00 10%
"Flgd Vlv Erec >=6"" >300# to <=600#"
24 3265575 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 185.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 185.00 10%
"Flgd Safety Vlv Erec >=6"""
25 3265580 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 279.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 279.00 10%
EREC REC PLTFRM <= 10M HEIGHT
After Completion of Erection INR/MT 6379 55%
26 3263026
After QMD Clearance INR/MT 6379 35%
After acceptance by Reliance representative / EIC. INR/MT 6379 10%
EREC REC PLTFRM <= 20M HEIGHT
After Completion of Erection INR/MT 6757 55%
27 3263027
After QMD Clearance INR/MT 6757 35%
After acceptance by Reliance representative / EIC. INR/MT 6757 10%
ERECTION OF GRATINGS <=20M HEIGHT
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN SQM 209 55%
28 3263016
After QMD Clearance SQM 209 35%
After acceptance by Reliance representative / EIC. SQM 209 10%
EREC OF GRATINGS > 40M HGT FROM GRD LVL
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN SQM 322 55%
29 3263018
After QMD Clearance SQM 322 35%
After acceptance by Reliance representative / EIC. SQM 322 10%
EQUIP-EREC ROTARY-FINFAN COOLER-DRVNG MC
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 3420.00 30%
30 3269201
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 3420.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 3420.00 20%
31 3269202 EQUIP-EREC ROTARY-ASSMBLY-FIN FAN COOLER INR/MT 3420.00 100%
EQUIP-EREC ROTARY-PUMP&DRVNG MC>2MT
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 5700.00 30%
32 3269198
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 5700.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 5700.00 20%
EQUIP EREC-STATIC>5MT TO<=20MT

33 3269192
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 2528.00 30%
33 3269192
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 2528.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 2528.00 20%
EQUIP-EREC ROTARY-FAN/BLOWER-DRVNG MC
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 9405.00 30%
34 3269203
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 9405.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 9405.00 20%
EQUIP EREC-STATIC > 20 MT TO <= 50 MT
AFTER INSTALLATION OF EQUIPMENT ON FOUNDATION INR/MT 2298.00 30%
35 3269193
AFTER ALIGNMENT COMPLETION AND QMD CLEARANCE INR/MT 2298.00 50%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 2298.00 20%
YARD PIPE SUPPORT FABRICATION - CS INR/MT 14950 90%
36 3265590
YARD PIPE SUPPORT FABRICATION - CS INR/MT 14950 10%
PIPE SUPPORT ERECTION - CS
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN INR/MT 11923 55%
37 3265593
AFTER QMD CLEARANCE INR/MT 11923 35%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 11923 10%
ERECTION OF CIR PLTFRM STRUC. > 40 M HGT
AFTER SHIFTING &ERECTION OF STR INCLUDING ALIGNMEN INR/MT 14304 55%
38 3263035
AFTER QMD CLEARANCE INR/MT 14304 35%
AFTER ACCEPTANCE BY COMPANY REPRESENTATIVE INR/MT 14304 10%
MISCELLANEOUS WORK - Extra Efforts @15% on "ERECTION OF
39 3107471 CIR LS 54927 100%

40 3299139 INCENTIVE-FESTIVAL LS 95000 100%


41 3298626 MAKING, EREC. & WELD-MS ROD ON RACK/UNIT MTR 478 100%
42 3300701 MOU WEAR PLATE WELD CS THK <=8 MM MTR 366 100%
43 3262995 YARD - WELD LIGHT STEEL STRUC MT 9319 100%
44 3302847 MOU SURFACE PREP&PAINT ON WELD JOINT ID 8 100%
45 3141355 FIXING OF SAFETY NET NR/SQ 7 100%
46 3141356 REMOVAL OF SAFETY NET NR/SQ 3 100%
47 3299935 ERECTN OF HANGING SCAFF 12M-18M HT INR/M2 145.00 100%
48 3299933 ERECTN OF HANGING SCAFF 6M - 12M HT INR/M2 130.00 100%
49 3299932 ERECTN OF HANGING SCAFFOLD UPT 6M HT INR/M2 117.00 100%

50 ERECTION-SCAFF ELEV 0-15M, WITH FIM INR/CUM 19.80 100%


3265778
51 3290901 EREC SCAFF ABV 15M & UPT 25M HEIGHT M3 20.00 100%
52 3290903 DISMANTLE SCAFF.>15 M TO 25 M HGT M3 13.00 100%

53 DISMANTLING-SCAFF ELEV 0-15M, WITH FIM INR/CUM 11.70 100%


3265785
54 3299939 DISMANTLE HANGING SCAFF UPTO 6M HT INR/M2 58.00
55 3299940 DISMANTLE HANGING SCAFF 6M - 12M HT INR/M2 65.00 100%
56 3299942 DISMANTLE HANGING SCAFF 12M - 18M HT INR/M2 72.00 100%
57 3290913 EREC & DISMANTLE OF COMP HANDRAIL SYSTEM M 16.50 100%
58 3290912 EREC & DISMANTLE OF PLATFORM M2 22.00 100%
59 3300140 LABOUR CHRGS F/CUTTING SCAFFOLDING PIPE NOS 11.00 100%
60 3264085 NDT RT PIPE UPTO 2"DIA, <=20MM THK INR/PJT 380.00 100%
61 3264086 NDT RT PIPE ABOVE 2"TO4"DIA,<=20MM THK IND 142.00 100%
62 3264087 NDT RT PIPE ABOVE 4" DIA,<=20MM THK IND 100.00 100%
63 3264080 STRESS RELIEVING SIZE>2"(CS),THK<=25MM IND 67.00 100%
64 3298622 EXTRA CHRGS-MANUAL ERE. INM 33.00 100%
65 3107471 MISCELLANEOUS WORK LS 100%
66 3269837 TRANSPORTATION OF RAW STRUCTURAL STEEL INR/MT 125 100%
67 3269838 TRANSPORTATION OF FABRICATED STR. STEEL INR/MT 150 100%
68 3252436 TRANSPORTATION OF RAW PIPES INM 3.50 100%
69 3252437 TRANSPORTATION OF FABRICATED PIPES INM 4.00 100%
70 3114925 CHARGES FOR MOBILISATION OF MANPOWER INR/PPR 1500.00 100%
71 3252438 TRANSPORTATION OF FITTINGS IND 4.00 100%
3079618 TRADE VALIDATION
HIGELY (Structural welder, pipe welder,pipe fitter, fabricator,foreman , structural fitter,
SKILLED supervisors) INR/PPR 752.00 100%
72 Grinder,Gas Cutter INR/PPR 510.00 100%
SKILLED
SEMI-SKILLED (Khalasi & Rigger) INR/PPR 482.00 100%
UNSKILLED Helper INR/PPR 399.00 100%
TOTAL AMOUNT ( RS )
Remarks

5267 241755.3
6686 306887.4
6710
153994.5
6685 102280.5
6685 81824.4
6685 71596.35

4187 160780.8
10589 406617.6

18278 350937.6
18477 236505.6
18477 189204.48
18477 165553.92

5266 192735.6
13650 499590

22662 414714.6
24163 294788.6
24163 235830.88
24163 206352.02

645 31153.5
1424 68779.2

1424 34389.6
1424 22926.4
1424 18341.12

482 19521
2335 94567.5

3516 71199
4523 61060.5
4523 48848.4
4523 42742.35
0

104 4024.8
3289 127284.3
3869 74865.15
5950 76755
5950 61404
5950 53728.5

1136 397713.6
1136 44190.4

558 210421.8
558 23380.2

526 141546.6
526 15727.4

117 37170.9
117 4130.1

126 45813.6
126 5090.4

663 255387.6
663 28376.4

356 105411.6
356 11712.4

116 77047.2
116 8560.8

248 126777.6
248 14086.4

1138 891054
1138 99006

642 386548.2
642 42949.8

10 11943
10 1327

921 922565.7
921 102507.3

581 581987.7
581 64665.3

90 90153
90 10017

56 56095.2
56 6232.8

2950 366390
2950 40710

5496 821102.4
5496 91233.6
Sr. ITEM. CLAIMED
DESCRIPTION UOM RATE PERCENT
No. CODE
UNIT PPNG EREC NIBR < 2"" NB"
SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 153.00 30%
SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 153.00 30%

1 3265535 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 153.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 153.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 153.00 8%
BOX UP & HAND OVER 7% INM 153.00 7%
UNIT PPNG EREC NIBR >= 2" TO <=6" NB
SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 128.00 30%
SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 128.00 30%

2 3265536 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 128.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 128.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 128.00 8%
BOX UP & HAND OVER 7% INM 128.00 7%
"UNIT PPNG EREC NIBR >6"" TO <=24"" NB"
SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 122.00 30%
SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 122.00 30%
3 3265537 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT INM 122.00 15%
MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 122.00 10%
AFTER COMPLETION OF HYDRO TEST 8% INM 122.00 8%
BOX UP & HAND OVER 7% INM 122.00 7%
"UNIT PPNG EREC IBR < 2"" NB"
SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 161.00 30%
SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 161.00 30%
4 3265539
ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 161.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 161.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 161.00 8%
"UNIT PPNG EREC IBR >= 2"" TO <=6"" NB"
SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 135.00 30%
SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 135.00 30%

5 3265540 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 135.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 135.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 135.00 8%
BOX UP & HAND OVER 7% INM 135.00 7%
UNIT PPNG EREC IBR >6" TO <=24
SHIFTING,PLACING, FIT UP & ITS CLEARANCE INCL TEMP SUPPORT IF REQD 30% INM 129.00 30%
SUPPORTING & ALIGNMENT WITH WELD VISUL FOR SUPPORTS 30% INM 129.00 30%

6 3265541 ISO CLEARANCE AFTER WELDING COMPL WITH WELD VISUAL OF PUNCH POINT 15% INM 129.00 15%

MECHENICAL CLEARANCE INCLUDING NDT CLEARANCE 10% INM 129.00 10%


AFTER COMPLETION OF HYDRO TEST 8% INM 129.00 8%
BOX UP & HAND OVER 7% INM 129.00 7%
UNIT-WELD CS-NIBR <2"",T<10MM
7 3265253 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 389.00 90%
AFTER HYDROTEST COMPLETION 10% IND 389.00 10%
UNIT-WELD CS-NIBR <2"" 10 <=T < 12MM
8 3265254 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 419.00 90%
AFTER HYDROTEST COMPLETION 10% IND 419.00 10%
UNIT WELD CS- NIBR >=2" T <10MM
9 3265256 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 299.00 90%
AFTER HYDROTEST COMPLETION 10% IND 299.00 10%
UNIT-WELD CS-NIBR >=2"" 10 <=T <12MM
10 3265257 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 353.00 90%
AFTER HYDROTEST COMPLETION 10% IND 353.00 10%
UNIT- WELD CS-NIBR >= 2" 12<= T<15MM
11 3265258 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 404.00 90%
AFTER HYDROTEST COMPLETION 10% IND 404.00 10%
UNIT-WELD CS-IBR <2"",T<10MM
12 3265267 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 428.00 90%
AFTER HYDROTEST COMPLETION 10% IND 428.00 10%
UNIT-WELD CS-IBR >=2"" T <10MM
13 3265270 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 329.00 90%
AFTER HYDROTEST COMPLETION 10% IND 329.00 10%
"UNIT-WELD SS-NIBR <2"",T<10MM"
14 3265309 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 738.00 90%
AFTER HYDROTEST COMPLETION 10% IND 738.00 10%
"UNIT- WELD SS-NIBR >=2"" T <10MM"
15 3265312 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 568.00 90%
AFTER HYDROTEST COMPLETION 10% IND 568.00 10%
"UNIT-WELD INCOLOY <2"",T<10MM"
16 3265337 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 870.00 90%
AFTER HYDROTEST COMPLETION 10% IND 870.00 10%
UNIT-WELD INCOLOY >=2"" T < 10MM
17 3265339 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 669.00 90%
AFTER HYDROTEST COMPLETION 10% IND 669.00 10%
UNIT-WELD DUP SS >=2" ,12<=T<15MM-
18 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1327.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1327.00 10%
UNIT-WELD DUP SS >2" T <10MM
19 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD DUP SS <2" ,T<10MM
20 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD SUPER DUP SS <2" ,T<10MM
21 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
UNIT-WELD SUPER DUP SS >2" ,T<10MM-
22 3107471 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IND 1113.00 90%
AFTER HYDROTEST COMPLETION 10% IND 1113.00 10%
Flgd Vlv Erec <6" <=300 #
23 3265572 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 138.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 138.00 10%
Flgd Vlv Erec >=6" <= 300#
24 3265574 AFTER FAB COMPLETION & NDT CLEARANCE OF WELD JOINT 90% IDS 166.00 90%
AFTER HYDROTEST COMPLETION 10% IDS 166.00 10%
TOTAL AMOUNT ( RS )
This Bill
QTY
Qty Amount

5267 241755.300
6686 306887.400
6710 153994.500
6685 102280.500
6685 81824.400
6685 71596.350

4187 160780.800
10589 406617.600

18278 350937.600
18477 236505.600
18477 189204.480
18477 165553.920

5266 192735.600
13650 499590.000
22662 414714.600
24163 294788.600
24163 235830.880
24163 206352.020

645 31153.500
1424 68779.200

1424 34389.600
1424 22926.400
1424 18341.120

482 19521.000
2335 94567.500

3516 71199.000
4523 61060.500
4523 48848.400
4523 42742.350
0
104 4024.800
3289 127284.300

3869 74865.150
5950 76755.000
5950 61404.000
5950 53728.500
1136 397713.600
1136 44190.400

558 210421.800
558 23380.200

526 141546.600
526 15727.400

117 37170.900
117 4130.100

126 45813.600
126 5090.400

663 255387.600
663 28376.400

356 105411.600
356 11712.400

116 77047.200
116 8560.800

248 126777.600
248 14086.400

1138 891054.000
1138 99006.000

642 386548.200
642 42949.800

10 11943.000
10 1327.000

921 922565.700
921 102507.300

581 581987.700
581 64665.300

90 90153.000
90 10017.000
56 56095.200
56 6232.800

2950 366390.000
2950 40710.000

5496 821102.400
5496 91233.600
11362573.47

You might also like