INTRODUCTION
It is proposed to re-construct the historically relevant Glastonbury stone arch to a new site at Church Street, Mexborough.
A basic examination of ground conditions was carried out by excavating a single trial pit in the proposed location of the arch
th
on 12 november 2014. This revealed made ground over a former roadway with sandstone and stiff clay ratchel at a depth
of approx 600mm.
It is therefore considered that the arch be built off a plain slab foundation cast at this level and set back from the face of the
retaining wall so as not to apply any additional surcharge pressure.
Slab design:
Asslabtop
hslab
hhcoreslab
Asslabbtm
Min mesh for shrinkage (top) A252 Actual mesh adopted in top A393
Mesh adopted in bottom A393
Cover to top reinforcement ctop = 40 mm Cover to btm reinforcement cbtm = 40 mm
Slab edge reinforcement
Mesh provided in top A393 Mesh provided in bottom A393
BM = (46×1.4)×0.9×0.9/2 = 26KNM
Hence: Adopt 300mm thick RC Slab x 5500mm Long x 1800mm wide reinforced with
A393 mesh top and bottom.
40mm cover to reinforcement.
500mm lap to mesh.
Grade RC35 Concrete mechanically vibrated.
Base to be within 30 deg of base of ret wall
TYPICAL DETAIL