This document contains vibration data from inspections of a power plant turbine during rotor repair from April 20-23. It includes vibration readings from 6 bearings in millimeters per second and micrometers peak-to-peak, as well as turbine speed, load, and guidelines for acceptable vibration levels. Vibration levels decreased over the inspection period as the turbine was run at various speeds and loads from no load to 85MW during the repair and inspection process.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

Vibration Record

This document contains vibration data from inspections of a power plant turbine during rotor repair from April 20-23. It includes vibration readings from 6 bearings in millimeters per second and micrometers peak-to-peak, as well as turbine speed, load, and guidelines for acceptable vibration levels. Vibration levels decreased over the inspection period as the turbine was run at various speeds and loads from no load to 85MW during the repair and inspection process.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TNB Repair & Maintenance Sdn. Bhd.

INSPECTION CHECKSHEET
Vibration Data Record
(As Left)

Job : PhaLai U2 LP Rotor Repair


SO No : 10444265
Measuring equipment : Bently Nevada Adre 408 Dynamic Signal Processing Instrument,
Siesmic sensors, IMV VM9201/12

TNB REMACO Pha Lai Power PPC Control Room


Speed Load
Date Time Bently Nevada Adre 408 (mm/s RMS) IMV VM9201/12 (µm pk-pk)
(rpm) (MW) Brg 1 Brg 2 Brg 3 Brg 4 Brg 5 Brg 6 Brg 1 Z Brg 1 Y Brg 2 Z Brg 2 Y Brg 3 Z Brg 3 Y Brg 4 Z Brg 4 Y Brg 5 Z Brg 5 Y Brg 6 Z Brg 6 Y
13:00 3000 FSNL 0.513 1.037 1.719 1.975 2.488 1.026
14:00 3321 Overspeed 0.688 0.895 2.767 3.165 3.580 1.812
14:15 4.7 4 0 8 3 5 8 21 7 16 16 7 3
20-04-19
15:00 10.3 6 0 8 5 5 7 24 5 15 15 8 3
16:00 2996 35.5 1.999 1.097 1.702 4.109 3.972 0.829 19 3 9 9 4 9 34 19 14 13 8 2
16:15 42.4 24 4 8 11 0 9 33 19 16 13 8 2
9:45 69 8 17 12 17 19 20 43 25 16 14 5 10
10:00 3004 74 1.130 1.391 2.194 4.551 4.016 1.135 7 15 8 18 17 18 37 20 15 12 5 10
11:10 3007 77.9 1.102 1.304 2.221 4.262 3.721 1.162 7 13 7 17 17 19 39 18 14 15 6 11
21-04-19
11:15 3008 85 1.037 1.337 2.597 4.851 3.198 1.593 6 8 7 17 28 28 48 23 12 15 8 13
16:00 3003 84 1.075 1.359 2.827 5.102 3.323 1.621 7 9 7 18 21 29 42 24 13 15 9 13
16:38 80.9 7 9 7 18 22 28 40 23 13 15 9 13
22-04-19 14:00 3000 85.6 1.070 1.315 2.483 4.916 3.312 1.561 7 8 7 16 18 25 39 22 13 15 9 13
23-04-19 10:10 3007 84.2 1.200 1.468 2.625 4.780 3.558 1.588 8 9 7 15 19 4 37 28 13 15 9 13

8 hours
trending

20-04-19 14:08 3002 FSNL 0.518 1.042 1.686 1.926 2.450 1.004
20-04-19 18:59 3004 40MW 1.026 1.293 1.457 4.087 3.656 0.748
21-04-19 2:59 3011 45MW 0.993 1.370 1.479 3.481 3.547 0.900
21-04-19 11:09 3006 75MW 1.108 1.424 2.161 4.578 4.153 1.075
21-04-19 19:00 3015 80~85MW 1.102 1.304 2.690 4.775 3.334 1.632
22-04-19 3:01 3014 80~85MW 1.151 1.337 2.614 5.080 2.952 1.659
22-04-19 11:13 3008 80~85MW 1.097 1.381 2.652 4.873 3.263 1.544
22-04-19 20:00 3009 80~85MW 1.228 1.375 2.734 5.026 3.078 1.582
23-04-19 4:00 3010 80~85MW 1.200 1.473 2.761 5.091 2.952 1.626
23-04-19 12:10 3006 80~85MW 1.173 1.451 2.646 4.720 3.514 1.632

Info:
ISO 10816-2 (mm/s RMS) LMZ 110MW Steam Turbine (µm pk-pk) Bearing 1,2 Bearing 3,4 Critical speed
A: Vibration < 3.8 Very Good < 15µm < 20µm Critical speed 1 : 1,670rpm
B: 3.8 < Vibration < 7.5 Good 15 ~ 20µm 20 ~ 32µm Critical speed 2 : 1,899rpm
C: 7.5 < Vibration < 11.8 Satisfying during the latest overhaul, will fix the vibration correction. 20 ~ 25µm 32 ~ 40µm Critical speed 3 : 2,405rpm
D: Vibration > 11.8 Allow to operate for 5 days and nights, to be repaired for better vibration. 25 ~ 32µm 40 ~ 60µm Critical speed 4 : 4,991rpm
Alarm: 4.0mm/s + (25%x7.5mm/s) You need to stop the turbine to correct the vibration. > 32µm > 60µm
= 5.9mm/s Alarm: 25µm 40µm

Measured by: TNB REMACO & PPC


Date: 20/4/2019, 21/4/2019, 22/4/2019, 23/4/2019