0% found this document useful (0 votes)
51 views1 page

Reqd Construction Documents

The document lists the required construction documents for the TOP Electrical System Unit #3 project. It notes that the ECC documents were not available in the project folder for section 3-ELE-ELE-16B. The project was handed over on December 21, 2018 and is marked as open with the Electrical department for addressing the missing documents.

Uploaded by

Naresh Pattanaik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

Reqd Construction Documents

The document lists the required construction documents for the TOP Electrical System Unit #3 project. It notes that the ECC documents were not available in the project folder for section 3-ELE-ELE-16B. The project was handed over on December 21, 2018 and is marked as open with the Electrical department for addressing the missing documents.

Uploaded by

Naresh Pattanaik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Required TOP Construction Documents (BTG)

Handover O&M Team Observations on TOP's


Sl No. TOP's Name Dept. STATUS Remarks
Date Items/Section Observations
Construction ECC Documents not available in folder:
1 Electrical System Unit#3 21-Dec-18 Documents ELECT Open
iv. 3-ELE-ELE-16B