Required TOP Construction Documents (BTG)
Handover O&M Team Observations on TOP's
Sl No. TOP's Name Dept. STATUS Remarks
Date Items/Section Observations
Construction ECC Documents not available in folder:
1 Electrical System Unit#3 21-Dec-18 Documents ELECT Open
iv. 3-ELE-ELE-16B