Design Flexible Pavement

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Design of Flexible Pavement

No. of Lane for Cariageway = 2 Lane

Initial traffic in the year of completion of construction A = 2218 CVPD

Traffic Growth Rate r = 5 %

Design Life n = 10 Year

Vehicle Damage Factor based on axle load survey F = 2.5

Design CBR of subgrade soil = 7 %

Distribution Factor D = 0.75

Design Traffic N =  
365 * (1  r ) n  1
* A* D * F
r
N = 19092533

N = 19.0925334 msa

You might also like