Roll No - Examiner - Student's Signature - Marks Obtained - Superintendent
Roll No - Examiner - Student's Signature - Marks Obtained - Superintendent
A. Request B. Clarification
C. Response D. Agreement
V. ________________ is allocating the overall cost estimate to individual work items to establish a baseline for
measuring performance.
A. Cost Estimating B. Cost controlling
C. Cost Budgeting D. None of these
2. Fill in the blanks
I. ________________ deals with building the system and focuses on issues such as how to design, test, code
and deploy.
II. __________________ is developing an approximation or estimate of the costs of the resources needed to
complete a project.
III. __________________ follows the fact that the output from one activity is input to another.
IV. _______________________ in software engineering is a one which combines the elements of waterfall
model which are then applied in an iterative manner.
V. A ___________________________________ is a document that describes how the organization will
manage cost variances on the project.
3. Write (T) for true and (F) for false.
a. Rapid Application Development (RAD) is a high-speed adaptation that emphasizes on short development time. (
)
b. The activities that comprise the project are relatively connected. That is, they are not simple, repetitive acts. ( )
c. If a business application can be modularized in a way that enables each major function (component, module) to
be completed is less than three months is called as scalable project.( )
d. Project may be self-specified or customer implemented specified. ( )
e. Intangible costs or benefits are costs or benefits that are difficult to measure in monetary terms.( )
`
BS (CS) 7th Semester (Fall 2016)
Final Term Examination
Software Project Management
Time: 1:15hrs SECTION B Marks: 35
Attempt any three questions with needed diagrams, each carries 5 marks.
Attempt any three questions with needed diagrams, each carries 5 marks.