0% found this document useful (0 votes)
53 views2 pages

Roll No - Examiner - Student's Signature - Marks Obtained - Superintendent

This document appears to be an exam for a software project management course. It contains multiple choice questions testing definitions of key project management terms like project management, cost estimating, and clarification. It also includes fill-in-the-blank questions on topics like project lifecycles and cost management plans. Finally, it asks students to answer true/false questions and choose three of four essay questions to answer in more detail, such as comparing waterfall and V-model project lifecycles or defining costs, projects, and conditions of satisfaction.

Uploaded by

Fawad Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

Roll No - Examiner - Student's Signature - Marks Obtained - Superintendent

This document appears to be an exam for a software project management course. It contains multiple choice questions testing definitions of key project management terms like project management, cost estimating, and clarification. It also includes fill-in-the-blank questions on topics like project lifecycles and cost management plans. Finally, it asks students to answer true/false questions and choose three of four essay questions to answer in more detail, such as comparing waterfall and V-model project lifecycles or defining costs, projects, and conditions of satisfaction.

Uploaded by

Fawad Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BS (CS) 7th Semester (Fall 2018)

Mid Term Examination


Software Project Management
Roll No_____________ Examiner _________________
Student’s Signature____________ Marks Obtained____________
Superintendent _____________________
Time: 15 min SECTION A Marks: 15
1. Choose the correct option. Each carries 1 mark’s. Cutting, erasure not allowed
I. ___________________deals with properly planning and controlling the engineering activities to meet
project goals for cost, schedule, and quality.

A. Engineering B. Project Management


C. Process Management D. None of these
II. If requirements are well understood and project scope is restrict, the _____________ process model enables
development teams to create a “full functional system” within 60 to 90 days.
A. Spiral Model B. Software Prototyping Model
C. Rapid Application Development D. V process model
III. __________________couples the iterative nature of prototyping model with the controlled and systematic
aspects of linear sequential model.

A. Spiral Model B. Software Prototyping Model


C. Waterfall Model D. V process model
IV. __________________ is the conversation between the requestor and the provider to clear the
understanding of the request.

A. Request B. Clarification
C. Response D. Agreement
V. ________________ is allocating the overall cost estimate to individual work items to establish a baseline for
measuring performance.
A. Cost Estimating B. Cost controlling
C. Cost Budgeting D. None of these
2. Fill in the blanks
I. ________________ deals with building the system and focuses on issues such as how to design, test, code
and deploy.
II. __________________ is developing an approximation or estimate of the costs of the resources needed to
complete a project.
III. __________________ follows the fact that the output from one activity is input to another.
IV. _______________________ in software engineering is a one which combines the elements of waterfall
model which are then applied in an iterative manner.
V. A ___________________________________ is a document that describes how the organization will
manage cost variances on the project.
3. Write (T) for true and (F) for false.
a. Rapid Application Development (RAD) is a high-speed adaptation that emphasizes on short development time. (
)
b. The activities that comprise the project are relatively connected. That is, they are not simple, repetitive acts. ( )
c. If a business application can be modularized in a way that enables each major function (component, module) to
be completed is less than three months is called as scalable project.( )
d. Project may be self-specified or customer implemented specified. ( )
e. Intangible costs or benefits are costs or benefits that are difficult to measure in monetary terms.( )

`
BS (CS) 7th Semester (Fall 2016)
Final Term Examination
Software Project Management
Time: 1:15hrs SECTION B Marks: 35

Attempt any three questions with needed diagrams, each carries 5 marks.

1. Discuss briefly Water-fall and V-Process model.


2. Define cost, project cost management and basic principles of cost management.
3. Discuss briefly Project characteristic, kinds of project and project classification.
4. Define a Project, Condition of Satisfaction and Project Overview Statement.

BS (CS) 7th Semester (Fall 2016)


Final Term Examination
Software Project Management
Time: 1:45hrs SECTION B Marks: 35

Attempt any three questions with needed diagrams, each carries 5 marks.

1. Discuss briefly Water-fall and V-Process model.


2. Define cost, project cost management and basic principles of cost management.
3. Discuss briefly Project characteristic, kinds of project and project classification.
4. Define a Project, Condition of Satisfaction and Project Overview Statement