0% found this document useful (0 votes)
108 views17 pages

Transformer Capacity Demand

The document contains calculations of electrical load for different classes of buildings (A, B, C, D) based on their lot area and appliances. It then sizes transformers needed to supply the calculated maximum demand for each class. Class A has the largest load of 68,890VA. Class D has the smallest load of 23,500VA. Twenty-eight 333KVA transformers would be required to supply the maximum demand.

Uploaded by

Boboako Napoles
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views17 pages

Transformer Capacity Demand

The document contains calculations of electrical load for different classes of buildings (A, B, C, D) based on their lot area and appliances. It then sizes transformers needed to supply the calculated maximum demand for each class. Class A has the largest load of 68,890VA. Class D has the smallest load of 23,500VA. Twenty-eight 333KVA transformers would be required to supply the maximum demand.

Uploaded by

Boboako Napoles
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 17

ARC WILSON M.

RIEGO October 1, 2013


BSEE/ 5TH YEAR ENGR. DEL ROSARIO

CLASS A (LOT AREA 350m)


COMPUTATION OF LOADS:

A) COOKING LOADS

1-10KW RANGE
2-12KW RANGE 17,000 VA = 17000 VA
1-11KW RANGE
2-8KW RANGE
1-5KW RANGE (16+5KW)0.55 = 11550 VA
2-3KW OVEN (2X3KW) 0.75 = 4500 VA

B) AIRCONDITIONING UNITS

7-2HP ACU 7x12x230 = 19320 VA

C) LIGHTING LOADS

350m 350x24 = 8400VA

D) OTHER LOADS

5-3KW WATER HEATER 5x3KW = 1500VA


1-1.5 WATER PUMP 1x230x10 = 2300VA
LAUNDRY CIRCUIT = 1500VA
SMALL APLLIANCES = 1500VA
20,300VA

DEMAND FACTOR (40%) = 20300VAX0.40 = 8120VA

TOTAL COMPUTED LOAD = 17000+11550+4500+19320+8400+8120


= 68,890VA

IFL = 68890+(.25x12x230)
230
= 302.52 A
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

CLASS C (LOT AREA 150m)


COMPUTATION OF LOADS:

A) LIGHTING LOADS

149m x24 = 3576VA


LAUNDRY CIRCUIT = 1500VA
SMALL APPLIANCES = 1500VA
6576VA

DEMAND FACTOR (35%)

@ 1ST 3000VA @(100%) 3000x1 = 3000VA


Remainder @ 35% (6576-3000)0.35 =1252 VA

B) OTHER LOADS

2-2HP ACU = 2x12x230 =5520VA


3-3KW WATER HEATER = 3x3000VA =9000VA
2-8KW RANGE =
2-5KW RANGE = (16+10+4).45 =13500VA
1-4KW OVEN =
1-1HP WATER PUMP = 1x8x230 =1840VA
1-10KW OVEN =
2-12KW RANGE = =14000VA

TOTAL COMPUTED LOAD = 3000+1252+5520+9000+13500+1840+14000

= 48,112 VA

IFL = 48112+(.25x12x230)
230
= 121.18A
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

CLASS B (LOT AREA 250m)


COMPUTATION OF LOADS:

A) COOKING LOADS

2-2.5KW OVEN (2X2.5KW).75 =3750VA


2-8KW W.M. COOKING
1-5KW RANGE (16+5KW).55 =11550VA
2-12KW RANGES =1100VA

B) AIR-CONDITIONING UNITS

3-2HP ACU 3x12x230 =8280VA


2-1.5HP ACU 2x10x230 =4600VA

C) LIGHTING LOAD

250m 250x24 =6000VA

D) OTHER LOADS

5-5KW WATER HEATER 5x5KW =25000VA


1-1.5HP WATER PUMP 1x10x230 =2300VA
1-5KW CLOTHS DRIER 1X5KW =5000VA
SMALL APPLIANCES LOAD =1500VA
LAUNDRY CIRCUITS =1500VA
35,300VA

DEMAND FACTOR (40%) = 35,300x0.4 =14120VA

TOTAL COMPUTED LOAD = 14120+6000+4600+8280+1100+11550+3750


= 59,300 VA

IFL = 59300+(.25x12x230)
230
= 260.82 A

CLASS D (LOT AREA 100m)


ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

COMPUTATION OF LOADS:

A) LIGHTING LOADS

100m x24 = 2400VA


LAUNDRY CIRCUIT = 1500VA
SMALL APPLIANCES = 1500VA
5400VA

DEMAND FACTOR (35%)

@ 1ST 3000VA @(100%) 3000x1 = 3000VA


Remainder @ 35% (5400-3000)0.35 =840 VA

B) OTHER LOADS

2-2HP ACU = 2x12x230 =5520VA


2-3KW WATER HEATER = 2x3000VA =6000VA
2-5KW RANGE = (10+4).45 =6300VA
1-4KW OVEN =
1-1HP WATER PUMP = 1x8x230 =1840VA

TOTAL COMPUTED LOAD = 3000+840+5520+6000+6300+1840

= 23500VA

IFL = 23500+(.25x12x230)
230
= 105.17 A
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

TRANSFORMER CAPACITY DEMAND

TRANSFORMER 1
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER2
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER3
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 4
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 5
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 6
Max. Demand = (23.5 x 10) / 1.45 = 162.07 KVA
Use: 167 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER7
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

TRANSFORMER8
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER9
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 10
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER11
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER12
Max. Demand = (23.5 x 10) / 1.45 = 162.07 KVA
Use: 167 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER13
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER14
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER15
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER16
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Use: 333 KVA, 1Ø Transformer


Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER17
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER18
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER19
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER20
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER21
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA

Use: 333 KVA, 1Ø Transformer


Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER22
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER23
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Supplies: Block 1 (1-6), Block 5 (23-28)


TRANSFORMER24
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER25
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER26
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER27
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER28
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER29
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER30
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER31
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER32
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA


Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER33
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER34
Max. Demand = (59.3 x 6) / 1.45 = 245.38KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER35
Max. Demand = (59.3 x 6) / 1.45 = 245.38KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER36
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER37
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER38
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER39
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER40
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Supplies: Block 1 (1-6), Block 5 (23-28)


TRANSFORMER41
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER42
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER43
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER44
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER45
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER36
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER46
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER47
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:

A5
Php Php
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' dia. Hole 2
6.85 13.70
Php Php
insulator, suspension, 6'', clevis type 2
90.75 181.50
Php Php
clamp, deadend loop, #6 to #2/0 ACSR 1
33.00 33.00
Php Php
Bolt, Oval Eye, 5/8" X 12" 2
59.45 118.90
7.62/13.2 KV. PRIMARY, 1-
Php Php
PHASE Anchor tape 1
14.31 14.31
DEADEND (SINGLE)
Php Php
Clevis, Secondary Swinging Without Spool 1
61.35 61.35
Php Php
Clamp, Loop Deadend, #6 to #2/0 ACSR 2
36.36 72.72
Php Php
Insulator, Spool, 1-3/4", ANSI Class 53 - 2 1
16.21 16.21
Php Php
Nut, Lock, Mf Type, 5/8" 2
7.08 14.16
Sub Php
Total 525.85
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:

G9
Php Php
Bolt, Machine, 5/8" X 10" 2
28.81 57.62
Php Php
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' dia. Hole 2
6.85 13.70
Php Php
Connector, Compression, 4
32.88 131.52
Php Php
Cutout And Arrester Combination 1
4,700.00 4,700.00
Php Php
Cutout Fuse 1
500 500
7.62/13.2 KV SINGLE Php Php
Connector, Split Bolt 1
PHASE TRANSFORMER 100.60 100.60
AT 1- PHASE TANGENT Php Php
Wire, Grounding, Aluminum Alloy, 3 Strand, #4 AWG (Ft.) 6
5.99 35.94
Php Php
Transformer, Pole Type, CSP, 10 KVA 25, 1
152.75 152.75
Php Php
Clamp, Hot Line, #2 - #4/0 ACSR Main to #2 - #4/0 1
259.15 259.15
Lead , Duples Poly. 4 A C S R for 10 KVA, 2 A C SR for 15 Php Php
4
and 25 KVA 500 2000
Php Php
Nut, Lock, Mf Type, 5/8" 2
7.08 14.16
Php Php
Armor Rod, Tapping 1
28.35 28.35
Php
Sub Total
5,493.79
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:

C22X
Php Php
Insulator, Pin Type, Porcelain, ANSI Class 55 - 3 8
87.75 702.00
Php Php
Pin, Pole Top, Channel, 1" Thread, 20" Long 12
109.94 1,319.28
Php Php
Bolt, Machine, 5/8" X 12" 8
33.69 269.52
Php Php
Bolt, Machine, 5/8" X 16" 1
35.75 35.75
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' dia. Php Php
8
Hole 6.85 54.80
Php Php
Bolt, Oval Eye, 5/8" X 12" 1
59.76 59.76
Php Php
7.62/13.2 KV 3-PHASE Armor Tape 3.936
14.31 56.32
CROSSARM
Php Php
CONSTRUCTION Clamp, Hot Line, #2 - #4/0 ACSR Main to #2 - #4/0 3
259.15 777.45
SINGLE PHASE JUCTION
Php Php
AT 0 - 5 ANGLE Jumpers , 4 AWG, 3 Strand Aluminum Alloy 1
5.99 5.99
Php Php
Shackle, Anchor, Forged Steel, Galvanized 4
80.19 320.76
Php Php
Insulator, Spool, 3", ANSI Class 53 - 4 2
31.27 62.54
Php Php
Nut, Eye, 5/8" Conventional 4
59.58 238.32
Php Php
clamp, deadend loop, #6 to #2/0 ACSR 4
33.00 132.00
Php Php
Armor Rod, Tapping 3
28.35 85.05
Php Php
Clevis, Secondary Swinging Without Spool 2
200.00 400.00
Php
Sub Total
4,519.54
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:


C1-1
Php
Insulator, Pin Type, Porcelain, ANSI Class 55 - 3 6 Php 526.50
87.75
Php
Pin, Pole Top, Channel, 1" Thread, 20" Long 2 Php 219.88
109.94
Php
Bolt, Machine, 5/8" X 12" 2 Php 67.38
33.69
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' Php
11 Php 75.35
dia. Hole 6.85
Php
Pin, Crossarm, Steel, 5/8" X 10-3/4" 4 Php 375.84
93.96
Php
Crossarm, Wood, 3-1/2" X 4-1/2" X 8' 2 Php 2,800.00
1,400.00
Php
Bolt, Carriage 3/8" X 4-1/2" 4 Php 29.64
7.41
Php
Lag, Screw, 1/2" X 4" 2 Php 22.66
7.62/13.2 KV THREE 11.33
PHASE CROSSARM Php
Bolt, Double Arming, 5/8" X 18" 3 Php 150.90
CONSTRUCTION 50.30
DOUBLE PRIMARY Php
Bolt, Single Upset, 5/8" X 14" 1 Php 55.17
SUPPORT AT 0° TO 5° 55.17
ANGLE Php
Rod, Armor, Preformed For #2 ACSR, Single Set 1 Php 182.38
182.38
Rod, Armor, Preformed For #2 ACSR, Double Php
3 Php 888.90
Set 296.30
Php
Nut, Lock, Mf Type, 3/8" 13 Php 77.74
5.98
Php
Nut, Lock, Mf Type, 5/8" 4 Php 28.32
7.08
Php
Brace, Wood 38" 4 Php 294.40
73.60
Php
Insulator, Spool, 1-3/4", ANSI Class 53 - 2 1 Php 16.21
16.21
Php
Spacer, Pipe, 3/4" X 1-1/2" 2 Php 25.62
12.81
Php
Wire, Tie, Aluminum Alloy, Soft, #4 AWG (Ft.) 55.77 Php 330.18
5.92
Sub Total Php 6,167.07
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:


E3-2
Php Php
Bolt, Machine, 1/2" X 10" 1
18.50 18.50
Php Php
Connector, Compression, 2
32.88 65.76
Php Php
Clamp, Guy Straight, 3 Bolt Heavy Duty 2
107.10 214.20
Php Php
Wire, Guy, Steel, 3/8", 7 Strand 50
17.74 887.00
Php Php
Jumpers , 4 AWG, 3 Strand Aluminum Alloy 5
5.99 29.95
7.62/13.2 KV
Php Php
SINGLE DOWN GUY Guy Guard, 8' min. length 1
17.74 17.74
WRAPPED TYPE
Php Php
Hook, Guy 34.33 2
34.33 68.66
Php Php
Guy Plate, 4" x 8" 2
41.03 82.06
Php Php
Nail, 8 penny, Galvanized 8
6.62 52.96
Php Php
Clamp, Rod Bonding, Single Eye 1
30.14 30.14
Php Php
Nut, Lock, Mf Type, 5/8" 1
7.08 7.08
Php
SUb Total
1,474.05
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Estimated Total Cost:

Transformer Type No. of Transformer Cost Total Cost/Transformer


Php Php
Capacity 167 kVA 2
200,856.85 401,713.69
Php Php
Capacity 250 kVA 12
411,106.85 4,933,282.17
Php Php
Capacity 333 kVA 34
659,106.85 22,409,632.80
Post Type No. of post Cost Total Cost/Post
Php Php
C22X 7
4,519.54 31,636.81
Php Php
C1-1 3
6,167.07 18,501.22
Php Php
E3-2 14
1,474.05 20,636.70
Php Php
A5 7
525.85 3,680.95
Php Php
G9 47
7,993.79 375,708.13
Php
Total1
28,194,792.47

NO. OF UNIT or
Items Cost/Unit TOTAL (Php)
meter

PHP
Pole, Concrete 35’ 9464.25 10
96,640
PHP
Pole, Concrete 30' 6982.63 46
321,172
PHP
Transformer Bracket 352.77 76
26,810.52
Conductor, Bare,
PHP
ACSR #2 AWG. 6/1 20.25 12000
243,000.00
704.82m,
PHP
Total2
671,347.80

Total1+Total2
OVERALL TOTAL COST
PHP 28,866,140.27
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO