CSHP Template For Residential Project/S (2 Storey and Below) or Minor Repair Works Having Less Than 10 Workers
CSHP Template For Residential Project/S (2 Storey and Below) or Minor Repair Works Having Less Than 10 Workers
CSHP Template For Residential Project/S (2 Storey and Below) or Minor Repair Works Having Less Than 10 Workers
Project description:
_______________________________________________________
b. Address/location: ___________________________________________
c. classification of the project: (2 storey residential or minor repair works with less
than 10 workers) _________________________________________
e. name of main contractor and list of sub-contractors (if any) and PCAB License,
______________________________________________________________
______________________________________________________________
________________________________________________________________
________________________________________________________________
o Chairman – ________________________________________________
Members : __________________________
__________________________
__________________________
__________________________
Secretary – ____________________________________________
3.2 Functions of CSH Committee shall include but are not limited to the following:
Plans, develops and oversees the accident prevention programs for the
construction project;
a. Owner
Responsible in operation, safety and health of the entire project.
Delegate personnel for the implementation of safety
Chairman of the safety and health committee. Arranges schedule and place of
meeting and notifies members.
b. Project Coordinator
Ensures that all workers under his supervision understand safety responsibility.
Ensures that proper use of PPE
Acts without delay in addressing all hazards and unsafe conditions or actions
within the scope of their area of responsibility.
Holds toolbox safety meeting with the workers.
c. Worker
Consistently observes work conditions, operation, equipment and tools for the
purpose of accident prevention.
Complies with all the regulations as well as safe work practices and safety rules.
Uses all necessary personal protective safety equipment and other safe working
practices.
Corrects any unsafe practices within the scope of work operations and reports
any unsafe conditions.
Attend all committee/toolbox meetings.
To hold a daily safety toolbox meeting every morning before the start of work to attain
the following objectives:
The company will provide the following basic PPEs and enforce the use of the
adequate and approved type of personal protective clothing and equipment suited to the risk
inherent in the work and operations performed:
4
Safety shoes - will be used for general works and to be worn at all times on the
site.
Safety helmet – all workers must wear an approved safety helmet while on the
construction site.
Safety goggles/Face shield – protection against flying objects from doing work
such as chipping, grinding, cutting, drilling works and alike.
The following welfare facilities will be provided in the site to ensure humane working
conditions:
a. Adequate supply of safe drinking water
b. Adequate sanitary, washing and sleeping facilities separate for men and
women workers
c. Adequate facilities for changing and for the storage and drying of work clothes.
d. Adequate accommodation for taking meals.
10.0 Working Hour & Break Time (Indicate the maximum number of work hours per day).
______________________________________________________________
______________________________________________________________
______________________________________________________________
5
1. Ensure that the construction wastes are segregated from that of domestic
waste.
2. All domestic wastes are to be collected on a daily basis.
3. Construction debris (broken hollow blocks, spoiled concrete, loose
concrete, etc) should be taken out on the staging area.
4. Oil spills and spoiled greases should be wrapping in the black garbage bag
and will be properly disposed.
5. Application of good housekeeping.
12.0 Safety Work Practices - (indicate safety work practices based on the scope of work to be undertaken.
Use additional sheet if necessary)
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
_________________________________________________________________________
14.0 Penalties/Sanctions – as a matter of policy and to ensure that the safety and health rules
specified herein are complied with, the owner recommended the following sanctions/penalties for any
violations of CSH program(Please attach company policy on penalties, if there are any). :
__________________________ ___________________
Name of Project Owner Date
Signature over Printed Name