The document lists electrical equipment for a power plant organized into columns labeled U8 through U10. It includes equipment such as transformers, switchgears, motor control centers, and boards for lighting, welding, and other uses. Page 2 continues listing additional equipment in the same format as Page 1.

Uploaded by

rohan kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views4 pages

TEST REPORT - Ods

The document lists electrical equipment for a power plant organized into columns labeled U8 through U10. It includes equipment such as transformers, switchgears, motor control centers, and boards for lighting, welding, and other uses. Page 2 continues listing additional equipment in the same format as Page 1.

Uploaded by

rohan kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Sheet1

U8 U9 U 10
415 TMCC (2) STATION TRANSFORMER 2 11 KV SWGR – 2/1
11 KV US -1 (2) UAT- 1 & 2 (2) 3.3 KV S.S – 2
UPCC 1&2 (2) ESP TRM. 1 & 2 (2) 415 V TURBINE MCC
415 ESP HUAC (2) GEN. TRANSFORMER 415 V UPCC- 1
415 BMCC (2) EXCITATION TRANSFORMER (2) 3.3 KV UAS
3.3 KU SAS – 1 (2) GEN. CT, UGT, NGR, SAUT, IPDB 415 V ESP HU AC MCC
11 KV US -2 (2) UT 1 & 2 11 KV SS- 5 & 6
415 Welding Board (2) 415 SP MCC – 2 415 V SPMCC – 3
415 Lightubg Board (2) SST 3 & 4 415 V BMCC
ECP (2) 11 KV US – 2 (2) 415 V HU AC MCC
415 HU AC MCC (2) 11 KV SS-3 (2) 415 EM. MCC
GT (2) IDBD, CT (Gen) NGR, NGT, SAUT. GTRP 415 V UPCC- 2 (2) ESP 1 -11 TRF
NGR ST-1 SAT 1&2 UT (1,2), UAT 1&2 (2) 11 KV US – 1 (2) UAT- 5/6
STATION TRANSFORMER (2) 415 TMCC (2) UT 5/6
SPMCC – 1 (2) ECP, UST 1- 4, SST 1-3 (2) GTRP, UTRP
UT 1&2, UTRP (2) ESP HU AC MCC (2) STRP, GT
(2) SERVICE BUILDING 11 KV SS-4 (2) ST – 3
FOPH MCC (2) SPMCC- 2
EM MCC (2) HU AC MCC- 2 (2)
415 CW MCC 1 & 2
415 V FW PMCC
UST- 1-4, SST 1-2
WST 1,2
LST 1,2
FOPH SERUIC TRM 1,2
S.B ST- 1,2 WT

Page 1
Sheet1

Page 2
Sheet2

U8 U9 U
415 TMCC (2) STATION TRANSFORMER 2 11 KV SWGR – 2/1
11 KV US -1 (2) UAT- 1 & 2 (2) 3.3 KV S.S – 2
UPCC 1&2 (2) ESP TRM. 1 & 2 (2) 415 V TURBINE MCC
415 ESP HUAC (2) GEN. TRANSFORMER 415 V UPCC- 1
415 BMCC (2) EXCITATION TRANSFORMER (2) 3.3 KV UAS
3.3 KU SAS – 1 (2) GEN. CT, UGT, NGR, SAUT, IPDB 415 V ESP HU AC MCC
11 KV US -2 (2) UT 1 & 2 11 KV SS- 5 & 6
415 Welding Board (2) 415 SP MCC – 2 415 V SPMCC – 3
415 Lightubg Board (2) SST 3 & 4 415 V BMCC
ECP (2) 11 KV US – 2 (2) 415 V HU AC MCC
415
GT (2) IDBD, CT (Gen) NGR, NGT, SAUT. 11 KV SS-3 (2)
HU AC MCC (2) 415 EM. MCC
GTRP 415 V UPCC- 2 (2) ESP 1 -11 TRF
NGR ST-1 SAT 1&2 UT (1,2), UAT 1&2 (2) 11 KV US – 1 (2) UAT- 5/6
STATION TRANSFORMER (2) 415 TMCC (2) UT 5/6
SPMCC – 1 (2) ECP, UST 1- 4, SST 1-3 (2) GTRP, UTRP
UT 1&2, UTRP (2) ESP HU AC MCC (2) STRP, GT
(2) SERVICE BUILDING 11 KV SS-4 (2) ST – 3
FOPH MCC (2) SPMCC- 2
EM MCC (2) HU AC MCC- 2 (2)
415 CW MCC 1 & 2
415 V FW PMCC
UST- 1-4, SST 1-2
WST 1,2
LST 1,2
FOPH SERUIC TRM 1,2
S.B ST- 1,2 WT

Page 1
Sheet2

U 10

Page 2