GENERAL Monitoring Checklist 1
GENERAL Monitoring Checklist 1
GENERAL Monitoring Checklist 1
MEDICINES/CHEMICALS
1 No Exposed Chemicals and Liquids
2 Labeled Chemicals
3 With Medical Kits in Every Section
GENERAL OBSERVATION
5 – Excellent 2 – Fair
4 – Very Good 1 - Poor
3 - Good
OFFICE CORRIDORS, PATHWAYS, HALLS
LOBBY AND CEILINGS
1 No slippery pathways
2 No blocked corridors
3 No unmounted cabinets/shelves
4 With Warning signs
5 With posted Emergency Hotlines
6 No Plants placed on the building
railing
7 With ramps for elevated school
buildings
8 With labeled garbage cans in proper
place
9 No Detached or peeled off GI Sheet
10 No Broken Toilet bowl and/ or sinks
11 No blocked emergency exit
12 With evacuation/emergency exit
plans
14 Functional firefighting equipment
GENERAL OBSERVATION
COMFORT ROOM
1 With available water supply
2 Clean and orderly
3 With available trash bins
4 With cleaning materials
GENERAL OBSERVATION
OFFICE SURROUNDINGS
1 No Flooded areas
2 With open pit
3 No stagnant water
4 No Unpruned trees/bushes/shrubs
5 No open/Incomplete perimeter fence
6 No spray animals inside the office
campus
7 No Electrical post/transformer near
the office perimeter
8 With emergency hotlines posted at
the Gate
9 Area maintained regularly by
assigned personnel
10 With designated evacuation area
GENERAL OBSERVATION
WASTE MANAGEMENT
1 Well-maintained garbage area
2 With Material Recovery Facility
3 Proper waste disposal and
segregation
4 Practice of 3Rs (reduce, recycle,
reuse)
5 With accessible cleaning materials
GENERAL OBSERVATION
COMPUTERS
1 Proper cabling of computer unit
2 Computer units with uniforms size of
DepEd Logo
3 With proper wiring installation
5 – Excellent 2 – Fair
4 – Very Good 1 - Poor
3 - Good
GENERAL OBSERVATION
SCHOOL SECURITY
1 With updated log book of visitors
2 With updated log book for SDO
Personnel
3 With records of spot reports on
significant incidents
4 Computer units and printed in
designated area
GENERAL OBSERVATION
5 – Excellent 2 – Fair
4 – Very Good 1 - Poor
3 - Good
General Findings as of March 5, 2018
1. All identified offices during the first visit started to clean up all the old files.
2. Special mention to the office of the COA that after the first monitoring has complied immediately to
all the suggestions
3. Everybody showed commitment to implement the 5 S in all offices.
1. There was a huge transformation in all offices as regards compliance to the 5 S principles.
2. General clean- up was done and everyone showed commitment. Congratulations to everyone who
participated.
3. Maintenance of cleanliness is observed.
4. There are still offices which need bulb replacement like Accounting, Administrative SGOD, Planning
& Research as well as the hall way upstairs. Only CID office
Prepared by :
Continuous Improvement Group
5 – Excellent 2 – Fair
4 – Very Good 1 - Poor
3 - Good