Project Procurement Management Plan
The project procurement management plan is a component of the project management plan that
describes how the project team will acquire goods and services from outside the organization.
It describes how the procurement processes will be managed from developing procurement
documents through contract closure.
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
REVISIONS AND DISTRIBUTION
Distributed to*
All project mgmt. dept.
JV Main office(s)
Sub-contractors
Consultant
Revision Release date
Suppliers
Client
Rev. 0 (draft) 29/10/2013
*) Detailed distribution lists shall be prepared for each distribution event. Further details as per the project
communication plan
Amendments
The Project Procurement Management Plan from time to time may require updates. Any
amendment to this plan shall be informed to the change control board by use of the change
request form and approved by the project change control board prior to distribution. Only revised
parts of the plan will be distributed along with the approval and shall be accompanied by
instructions how to implement the changes.
The initial page numbering system (to be added upon initial approval) will be a normal continuous
numbering displayed in the lower right corner of each page. In the event that pages have to be
added, characters shall be added to the number. In case entire pages are deleted, the
corresponding page shall be replaced by a blank page stating “page removed”.
Each added/changed page shall have the revision number and date of approval displayed on the
bottom of the page.
Marc Arnecke, PMP [Ref. number] II
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
PROJECT SPONSOR APPROVAL
Prepared by: Reviewed by: Approved by Proj. Sponsor:
Place, dd/mm/yyyy Place, dd/mm/yyyy Place, dd/mm/yyyy
Marc Arnecke, PMP Name Name
Designation Designation Designation
Marc Arnecke, PMP [Ref. number] III
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
TABLE OF CONTENTS
Revisions and Distribution ...............................................................................................................2
Amendments ............................................................................................................................... 2
Project Sponsor Approval ................................................................................................................3
Procurement Management Approach ............................................................................................. 1
Contract Types ................................................................................................................................ 2
Procurement Constraints .................................................................................................................3
Scope ..............................................................................................................................................4
Responsibilities and Authorities .......................................................................................................5
Decision Criteria .............................................................................................................................. 6
Procurement Documentation ..........................................................................................................7
Procurement Risk ............................................................................................................................ 8
Reporting Formats ........................................................................................................................... 9
Supplier Performance Measurement ............................................................................................. 10
Attachments: .................................................................................................................................11
Marc Arnecke, PMP [Ref. number] IV
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
PROCUREMENT MANAGEMENT APPROACH
Explain the processes how project procurement decision will be documented, how potential
sellers will be identified, and how procurement will be conducted.
Marc Arnecke, PMP [Ref. number] P a g e |1
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
CONTRACT TYPES
Define the types of contracts and the terms and conditions to be used for the project.
1) Fixed price contracts
a. ...
b. ...
2) Cost-reimbursable contracts
a. ...
b. ...
3) T&M
Marc Arnecke, PMP [Ref. number] P a g e |2
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
PROCUREMENT CONSTRAINTS
Describe constraints to be considered as part of the procurement process (time, cost, scope etc.)
Marc Arnecke, PMP [Ref. number] P a g e |3
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
SCOPE
Define what goods and/or services will be procured and under what conditions.
SN Name Description Constraints Constraints Contract type
(item or service) (short description and justification) (time) (requirements)
01
Marc Arnecke, PMP [Ref. number] P a g e |4
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
RESPONSIBILITIES AND AUTHORITIES
SN Name & role Responsibilities Limitation
01 Mustermann, Max (Proj. Mngr.) - Request goods or service through standardized
documentation, allowing sufficient time
- Sign purchase orders up to limit 50,000 EUR
- Co-sign purchase orders above 50,000 EUR
Marc Arnecke, PMP [Ref. number] P a g e |5
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
DECISION CRITERIA
Explain the criteria according to which suppliers will be selected and contracts awarded.
Marc Arnecke, PMP [Ref. number] P a g e |6
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
PROCUREMENT DOCUMENTATION
Describe the documents and forms with their contents to be used for material and/or service
procurement.
E.g.:
1) Site requisition order form with
a. Full material specification and requirements.
b. Expectations (delivery time, place of delivery etc.).
c. Control account.
d. ...
2) Request for quotation
a. ...
3) Purchase order/contract (see above)
4) Procurement evaluation form
Marc Arnecke, PMP [Ref. number] P a g e |7
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
PROCUREMENT RISK
Each project has (should have) an overall risk management plan. However since there might be
risks specifically associated with procurement, those risks should be identified and planned here.
Marc Arnecke, PMP [Ref. number] P a g e |8
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
REPORTING FORMATS
Reporting formats define how the outcomes of the risk management process will be documented,
analysed, and communicated.
Marc Arnecke, PMP [Ref. number] P a g e |9
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
SUPPLIER PERFORMANCE MEASUREMENT
All suppliers should be evaluated during and after delivery. Explain how (e.g. by using supplier
evaluation forms ...).
Describe the measures to be taken in case a supplier fails to fulfil his contractual obligations.
Marc Arnecke, PMP [Ref. number] P a g e | 10
This template is downloaded from project-management.magt.biz
[Project Name]
Project Procurement Management Plan
ATTACHMENTS:
Attachment 1
Attachment 2
Marc Arnecke, PMP [Ref. number] P a g e | 11