Engineering Daily Report: Activity For Today Are: Today Yesterday

The daily engineering report summarizes construction activities at the Masinloc 300MW x 2 Units CFPP offshore works project. Key activities for the day included repairing and cleaning hand tools in the laydown area, painting and grinding the deck room at SPB-1, and welding works on SPB-2 studs. Weather was fair with a high of 32°C and low of 26°C. A total of 466 workers were on site, with 58 additional workers arriving. Tomorrow's scheduled activities include continued painting and grinding at SPB-1 and cleaning and painting of steel forms.

Uploaded by

Marlorn Odoño
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views1 page

Engineering Daily Report: Activity For Today Are: Today Yesterday

The daily engineering report summarizes construction activities at the Masinloc 300MW x 2 Units CFPP offshore works project. Key activities for the day included repairing and cleaning hand tools in the laydown area, painting and grinding the deck room at SPB-1, and welding works on SPB-2 studs. Weather was fair with a high of 32°C and low of 26°C. A total of 466 workers were on site, with 58 additional workers arriving. Tomorrow's scheduled activities include continued painting and grinding at SPB-1 and cleaning and painting of steel forms.

Uploaded by

Marlorn Odoño
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ENGINEERING DAILY REPORT

Project : Masinloc 300MW X 2Units CFPP / Offshore Works Signatories

2019 . 05 . 21 Tuesday Prepared By: Checked By: Noted By: Approved By:

Max. 32ᵒC
Weather Condition Fair
Min. 26ᵒC

Contents Available Hands


By Occupation
Today Yesterday Yes. Tod. Sum

Activity for today are: Korean Manager 16 2 18

QA/QC Engr. 7 1 8
Laydown Area Repair and cleaning of hand tools at
laydown warehouse Safety Supvr. 7 1 8

A P.C.O./Inspector 9 2 11
Cleaning and painting of steel forms
d Warehouseman 19 2 21
m
Utility 6 1 7
Painting and grinding of deck room at i
SPB-1 n First Aider 7 1 8

Guard 50 5 55

Housekeeping Admin 34 4 38

Househelper 20 2 22
Welding works of SPB-2 stud
Surveyor 6 1 7

Matalviz Port Foreman 40 7 47

Tomorrow Carpenter 7 1 8

Steelman 5 1 6
Painting and grinding of deck room at SPB-1
Welder 6 1 7
F
Helper 7 1 8
i
Cleaning and painting of steel forms. e Electrician 14 2 16
l
Equip.Operator 25 3 28
Welding works of SPB-2 stud d
Fire Watcher 7 1 8

Crew 103 10 113

Des. Time Current status Driver 26 3 29

7:30 - 8:00 Toolbox meeting Safety Aide 7 1 8


W 8:00 - 9:00 Diver 38 5 43
o
r 9:00 - 10:00 Sum 466 58 524
k Cleaning and painting of steel forms
10:00 - 11:00 Remarks:

p 11:00 - 12:00
r
12:00 - 1:00 Lunch time
o
g 1:00 - 2:00
r
e 2:00 - 3:00
s Cleaning and painting of steel forms
3:00 - 4:00
s
4:00 - 5:00