Untitled - Complete
Untitled - Complete
Untitled - Complete
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Short-Circuit Analysis
ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
30-Cycle Network
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
23 Buses Total
Ohms or Siemens per 1000 ft per Conductor (Cable) or per Phase (Line)
Line/Cable Length
Grounding
Branch Connections
U1 Bus_1 2572.748 150.000 0.00 3.88685 0.01794 Wye - Solid 0.04 0.839315 0.03601
Bus3 Total 0.00 2.971 0.00 137.51 129.56 1.451 1.451 3.12E+001 9.20E+001 5.69E+001 4.01E+002
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 9
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Bus11 Total 0.00 1.623 0.00 139.14 131.36 0.756 0.756 5.81E+001 1.68E+002 1.13E+002 7.85E+002
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 10
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Bus17 Total 0.00 1.116 0.00 139.72 131.99 0.511 0.511 8.50E+001 2.44E+002 1.70E+002 1.17E+003
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 11
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Bus23 Total 0.00 0.850 0.00 140.02 132.32 0.386 0.386 1.12E+002 3.20E+002 2.26E+002 1.55E+003
Bus20 Bus23 11.90 0.850 12.23 134.44 127.40 0.386 0.386 1.12E+002 3.20E+002 2.26E+002 1.55E+003
Bus26 Bus23 0.00 0.000 0.00 140.02 132.32 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 12
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Bus26 Total 0.00 0.760 0.00 140.12 132.43 0.344 0.344 1.25E+002 3.59E+002 2.55E+002 1.75E+003
Bus23 Bus26 10.63 0.760 10.90 135.14 128.04 0.344 0.344 1.25E+002 3.59E+002 2.55E+002 1.75E+003
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 13
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Bus3 20.00 0.955 -2.814 2.971 0.290 -1.422 1.451 2.437 0.827 2.573 2.360 1.300 2.694
Bus11 20.00 0.530 -1.534 1.623 0.152 -0.741 0.756 1.328 0.459 1.405 1.288 0.701 1.467
Bus17 20.00 0.367 -1.054 1.116 0.103 -0.501 0.511 0.913 0.318 0.967 0.886 0.481 1.008
Bus23 20.00 0.280 -0.803 0.850 0.078 -0.378 0.386 0.695 0.243 0.737 0.675 0.366 0.768
Bus26 20.00 0.251 -0.718 0.760 0.069 -0.337 0.344 0.621 0.217 0.658 0.603 0.327 0.686
All fault currents are symmetrical momentary (30 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents
Project: ETAP Page: 14
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal
Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus3 20.000 1.24924 3.67986 3.88612 1.24924 3.67986 3.88612 2.27776 16.02474 16.18581
Bus11 20.000 2.32444 6.72594 7.11627 2.32444 6.72594 7.11627 4.53697 31.41642 31.74233
Bus17 20.000 3.39964 9.77202 10.34649 3.39964 9.77202 10.34649 6.79616 46.80810 47.29890
Bus23 20.000 4.47484 12.81810 13.57674 4.47484 12.81810 13.57674 9.05537 62.19978 62.85549
Bus26 20.000 5.01244 14.34114 15.19187 5.01244 14.34114 15.19187 10.18497 69.89562 70.63378