CDHydro - CDTECH PDF
CDHydro - CDTECH PDF
CDHydro - CDTECH PDF
12000 40
10000
30
Sulfur, ppm
Olefins, %
8000
6000 20
4000
10
2000
0 0
50 100 150 200 250
Temperature, C
Sulfur Olefins
Optimized FCC Gasoline HDS
Mild HDS
LCN
Medium
MCN
HDS
FCC C5+
GASOLINE
MCN/HCN
HCN
Severe
HDS
Conventional FCC LCN Treating
FCC C5+
Hydrogen • Selective hydrogenation of
GASOLINE
Compression
HYDROGEN dienes for alky/ethers
SPENT CAUSTIC
• Compression of makeup
MCN/HCN
hydrogen
Hydrogenation/Distillation
CDHydro® Process
• Replace trays with CW
Vent
structured distillation Gas
packing containing
catalyst
• Add Hydrogen Feed Hydrogen Treated
Distillate
Bottoms
Catalytic Distillation
Catalyst Section
Drawing
Reflux LCN
Catalyst
Wire
Mesh
LCN
RSH
Sulfides
Dienes
Hydrogen
• Eliminate separate
FCC C5+
hydrogenation unit GASOLINE
Hydrogen
Compression
HYDROGEN
• Eliminate hydrogen SPENT CAUSTIC
compression MCN/HCN
Mild HDS
LCN
Medium
MCN
HDS
FCC C5+
GASOLINE
MCN/HCN
HCN
Severe
HDS
Optimized FCC Gasoline HDS
LCN
CDHydro® Medium
Hydrogen
MCN
HDS
FCC C5+
GASOLINE
MCN/HCN
HCN
Severe
HDS
MCN/HCN Desulfurization
CDHDS®
Conditions milder than conventional fixed
CW Off Gas
bed (17 barg vs 28+)
> 99.5% HDS
Heavy sulfur to bottom
Light olefins to top FCC C7+
Gasoline
Min octane loss
Low H2 consumption
Low sulfur bottoms product good for
gasoline or diesel Hydrogen
LCN
CDHydro®
Hydrogen
MCN
FCC C5+
GASOLINE
MCN/HCN
CDHDS®
Hydrogen
HCN
CDTECH FCC Gasoline Desulfurization Operating Experience
1
Conversion, Fraction
0.8
0.6
0.4
0.2
0
200 250 300 350 400 450 500
Temperature, F
100.00%
Conversion, Fraction
80.00%
60.00%
40.00%
20.00%
0.00%
200 250 300 350 400 450 500
Temperature, F
120
100
80
RON
60
40
20
0
5 6 7 8 9 10 11
Carbon Number
Why is CDTECH’s octane loss lower?
Answer:
Conventional
Fixed Bed
Technology
SOR
Days on Oil
Fixed Bed HDS
Catalyst Activity Tracker for the Motiva, Port Arthur CDHDS Units
CD TECH - Confidential
1.8
1.6 ate !!
Observed Rate Const.
1.4 Upd
1.2
1
0.8
0.6
0.4
0.2
0
3/15/00 10/1/00 4/19/01 11/5/01 5/24/02 12/10/02 6/28/03 1/14/04 8/1/04
Date
K pod CDHDS1 K pod CDHDS2
An approach used by others
Wet
treatment
LCN
FCC
FCC
• Pembroke, UK
• 50,000 BPD full range
FCC gasoline
• 1st CDHydro/CDHDS
in Europe
• 1Q02 start up
- UK ULSG supported
by tax incentive
Equilon/Motiva/Deer Park Refining
• 7 refineries
• 275,000 bpd FCC gasoline capacity
• CDHydro and/or CDHDS
• Start-up 2002 - 2004
Valero Refining
• 5(+2) refineries
• World Fuels Today statement by Valero V.P.
- For grassroots units, CDTECH has:
- Lowest capital cost
- Lowest octane loss
- Lowest hydrogen consumption
PetroChina Announcement – 05/03/2003