This weekly journal entry from Week Seven discusses the student's filming preparation and experience. They learned from planning that unexpected issues can arise and thorough preparation is important. Issues encountered included actors cancelling last minute, which was difficult to overcome. To prepare, they booked equipment in advance, packed bags early, and communicated clearly with actors. Locations were organized through walking, trains, and public transport. While on track, they need to complete broll filming over the weekend to stay on schedule.

Uploaded by

api-429877210
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views2 pages

Week 7 Blog

This weekly journal entry from Week Seven discusses the student's filming preparation and experience. They learned from planning that unexpected issues can arise and thorough preparation is important. Issues encountered included actors cancelling last minute, which was difficult to overcome. To prepare, they booked equipment in advance, packed bags early, and communicated clearly with actors. Locations were organized through walking, trains, and public transport. While on track, they need to complete broll filming over the weekend to stay on schedule.

Uploaded by

api-429877210
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

WEEKLY JOURNALS

This is where you think about your FMP learning journey and development.
Don’t simply describe what you did - consider what you have learnt and how this has benefitted
your project. What do you need to improve?

THIS IS JUST GUIDANCE THAT YOU NEED TO ADAPT TO YOUR OWN PROJECT. YOU HAVE CREATED YOUR
OWN PRODUCTION SCHEDULES AND YOUR WEEKLY BLOGS SHOULD REFELCT THAT.

THESE QUESTIONS SHOULD BE ADDRESSED IN THE WEEKS YOU COMPLETED THEM. DO NOT JUST SUBMIT THIS
FORM FILLED IN FOR YOUR WEEKLY BLOGS. THERE SHOULD BE 11 WEEKLY BLOG ENTRIES (INCLUDING
EASTER).

Week Seven–Filming

PLANNING

What did you learn from your planning I was able to learn from planning this week that there is a lot
this week? needed to insure that I am 100% prepared and set for filming
as I could possibly encounter different problems during that
time therefore by having thorough planning completed I am
organised and not worrying as much as I could be if I hadn’t of
planned ahead.
I also learnt that even with planning things might not go straight
according to how you want them to go

What issues did you encounter and The issues I ha e encountered are things such as actors not
how did you overcome them? turning up or cancelling. This was big for me as they were
really important actors and it was difficult for me to find backup
actors who fit the criteria that I was looking for which made it
twice as stressful however I was able to sort out more dates
the following week so I could film them in time to complete my
draft I also encountered problems with things like trains and
transport, because I was filming on a back holiday weekend it
meant that the trains and certain lines in London weren’t
running which was unfortunate however, I was able to
reschedule more dates for filming broll.

I also was able to make more dates for filming actors which i
filmed on the Tuesday of this week

How did you ensure that you are


prepared for filming? To ensure I was prepared for filming I made sure I booked all
the equipment I needed says in advanced and also packed my
bags prior so I wasn’t forgetting anything and not rushing on
the days of filming. I also made my actors aware again of
filming dates however still they still managed to forget
How did you ensure that your I didnt have much equipment overall i am using a c mount and
equipment lists were completed to a a camera which i am borrowing from the henley college whichi
high standard? filled a form for and i also used a tripod which was my own.

How have you ensured your actors . I made my actors aware again of filming dates at the begining
and crew will be available? of the week via email and text making sure they understood
where and when we were filming however still they still
managed to forget

How well have you been able to It was extremely fortunate and two of my filming locations were
organise locations and transport? in Henley therefore I was access to walk and trains as I go to
college every day and so did my crew, I also had public
transport options for London like trains and also the
underground taxis and also buses

Are you on track for the week? If not, Behind, still need to film broll on the weekend
how far behind are you?

What work do you need to complete Broll


outside of lessons to stay on track?

High Grade Tips

Planning & Production


● ‘effective planning, organisation’ – your FMP Workbook will explain what you need to do in the
next few weeks to make sure all of your planning is completed, and also how this will help you
● ‘efficient production against timescales’ – your FMP Proposal will clearly identify how you intend
to create your project before the deadline in May
● ‘commitment & subject engagement’ – all of the above referred to in your daily/weekly
reflections

You might also like