GTG MR Specs
GTG MR Specs
GTG MR Specs
MATERIAL REQUISITION
DOCUMENTATION LIST
Item Document No. Document Name Rev/Issue Date Status
A)
B) DATASHEETS
D) DRAWINGS
1 39-91-PR-DR-PI-0003 P&ID - Gas Turbine Generator F Yes
2 30-91-EL-DR-SD-0002 Overall One Line Diagram - QG NFB, PRQ1, WHPQ10 & WHPQ11 A Yes
3 DW-C005-PU-U-50-60-46-0001 One Line Synchronozation Diagram GTG A Yes
4 30-91-EL-DR-BD-0002 PDCS - System Block diagram F Yes
Unrestricted Page 1 of 4
MR No
MATERIAL REQUISITION FOR GAS TURBINE GENERATOR PACKAGE #REF!
D6897-MR-ME-MMP41-04
MATERIAL REQUISITION
DOCUMENTATION LIST
Item Document No. Document Name Rev/Issue Date Status
3 30-91-EL-SP-NA-0011 Electrical Specification – Distribution Board
4 39-91-EL-DR-HC-0001 Area Classification Plan PRQ1
5 30-42-HV-DB-NA-001 HVAC Basis of Design
6 30-20-SA-DB-NA-0001 Technical safety Basis of Design
Unrestricted Page 2 of 4
1 30-91-EL-DB-NA-0001
2 39-91-EL-DR-PL-0004
3 30-91-EL-SP-NA-0011
4 39-91-EL-DR-HC-0001
5 30-42-HV-DB-NA-001
6 30-20-SA-DB-NA-0001
7 30-20-PM-SP-NA-0001
8 30-20-PM-SP-NA-0004
9 30-20-PM-SP-NA-0014
10 30-20-ST-SP-NA-0016
Electrical Design Basis
Electrical Lighting Plan PRQ1(Lighting type / description)
Electrical Specification – Distribution Board
Area Classification Plan PRQ1
HVAC Basis of Design
Technical safety Basis of Design
Noise Control
Material Criticality Rating – Engineering & Procurement
Instructions for Recommended Spare Parts and Operating Supplies Recommendation
Design of Deck Structures for Offshore Platforms