AQT-56 Manual PDF
AQT-56 Manual PDF
AQT-56 Manual PDF
POWERFLO SERIES
CON T RO L VA LVES
SERVICE MANUAL
Table of Contents
CO N T R O L VA LV E S
Electric motor
110V/60Hz 220V/50Hz 220V/60Hz
Flow Meter
2100 Gallon/Plastic (8T) 120v/60Hz 220v/60z
Yoke
3/4" NPT Plastic 1" NPT plastic
Injector nozzle/throat
#0 Red #1 Natural #2 Blue
#3 Yellow
B.L.F.C
0.125 GPM 0.25 GPM 0.5 GPM
D.L.F.C
1.2 GPM 1.5 GPM 2.0 GPM
EU JP Other: _______________________
Page 3
General Residential
Installation Check List CO N T R O L VA LV E S
CAUTION
Page 4
MODEL AQT-56ST
CO N T R O L VA LV E S Installation & Start-Up Procedure
BLUE TIME
Model: AQT-56ST
1. Manually index the softener control into the In Service position and let water flow into the resin tank. When the water flow stops,
open a softened water tap until all air is released from the lines. Then close tap.
Note: Manually dial the various regeneration positions by turning the knob on the front of the control until the indicator shows that
the softener is in the desired position.
2. Manually index the control to the Backwash position and allow water to flow at the drain for 3 or 4 minutes.
3. Remove back cover plate.
4. Make sure that the salt dosage is set as recommended by the manufacturer. If necessary, set salt according to the setting instruction
sheet. Manually index the control to the Brine Fill position and allow the brine tank to fill to the top of the air check.
5. Manually index the control to the Brine Draw position and allow the control to draw water from the brine tank until it stops.
6. Plug in the electrical cord and look in the sight hole in the back of the motor to see that it is running. Set the days that regeneration is
to occur by sliding tabs on skipper wheel upward .
• Each tab is one day.
• Finger at red pointer is tonight.
• Moving clockwise from red pointer, pull or push fingers to obtain the desired regeneration schedule.
7. Manually advance the control to the beginning of the Brine Fill position and allow the control to return to the In Service position
automatically.
8. Fill the brine tank with salt.
9. Replace back cover on the control.
10. Make sure that any bypass valving is left in the normal In Service position.
Page 5
AQT-56FT Meter Filter Valve
Start-up Procedures CO N T R O L VA LV E S
BLUE TIME
Model: AQT-56FT
Before Plugging in the Unit
1. Open a treated water tap down stream of the filter.
2. Manually index the filter to the In Service position and allow the mineral tank to fill by slowly opening the main water supply valve.
Any bypass should be in the In Service position.
Note: The water flowing from the downstream tap is cloudy and/or contains media fines as well as air. Allow the water to run until it
appears clean and free of air.
3. When a steady clean flow appears at the tap, close the tap and the main water supply valve and allow the filter media bed to settle for
15–20 minutes.
4. Manually index the filter to the Backwash position.
5. To prevent a sudden surge of water and air, partially open the main water supply valve so that the flow at the drain of the filter is
approximately 1 gpm (3.7 Lpm). The water at the drain is cloudy again and/or contains media fines as well as air. Allow water to flow at
the drain until it appears clean and free of air.
6. Continue to open the water supply valve until it is completely open. Allow water to flow at the drain until all media fines are washed
out of the filter.
7. Manually index the filter to the In Service position, and again open the downstream tap. Check to be sure that the water flows clear.
If necessary, allow water to flow until all media fines are gone. If the tap is equipped with an aerator check that is not plugged with
media fines and pipe scale.
8. Plug in the electrical cord and look in the sight hole in the back of the motor to see that it is running. Set the days that regeneration is
to occur by sliding tabs on skipper wheel upward .
• Each tab is one day.
• Finger at red pointer is tonight.
• Moving clockwise from red pointer, pull or push fingers to obtain the desired regeneration schedule.
9. Set time of day by pushing blue button and spin the 24-hour gear until the present time of day is visible above the time of day arrow
Page 6
AQT-56SM Meter Control Valve
CO N T R O L VA LV E S Start-Up Procedure
BLUE TIME
Model: AQT-56SM
1. Manually index the softener control to the In Service position and let water flow into the resin tank. When the water flow stops, open a
softened water tap until all air is released from the lines. Then close tap.
Note: The various regeneration positions may be dialed manually by turning the knob on the front of the control until the indicator
shows that the softener is in the desired position.
2. Set water usage program wheel :Calculate the gallon capacity of the system by dividing the system capacity by the raw water
hardness. Next subtract the necessary reserve requirement by multiplying the number of people in the house by 75 gallons (1
US gallon=3.785 L) per day. Set the gallons available at the small white dot on program wheel gear. The capacity arrow denotes
remaining gallons exclusive of fixed reserve. The table below is also a quick reference to determine the gallons used before each
regeneration.
3. Rotate program wheel counterclockwise until it stops at Regeneration position.
4. Manually index the control to the Backwash position and allow water to flow at the drain for 3 or 4 minutes.
5. Remove back cover plate.
6. Make sure than the salt dosage is set as recommended by the manufacturer. Manually index the control to the Brine Fill position and
allow the brine tank to fill to the top of the air check.
7. Manually index the control to the Brine Rinse position and allow the control to draw water from the brine tank until it stops.
8. Plug in the electrical cord and look in the sight hole in the back of the motor to see that it is running.
9. Manually advance the control to the beginning of the Brine Fill position and allow the control to return to the In Service position
automatically.
10. Fill the brine tank with salt.
11. Replace back cover on
the control. Be sure
cable is not pinched
between cover and
housing.
12. Make sure that any
bypass valving is left in
the normal In Service
position.
(Liters)
Page 7
Water Conditioner
Flow Diagrams CO N T R O L VA LV E S
1) Service Position
Flow Control Hard water enters unit at valve inlet and flows down
Flow Control through the mineral in the mineral tank. Conditioned water
Enjector
Inlet
enters center tube through the bottom distributor, then
Outlet flows up through the center tube, around the piston, and
Piston Resin Tank
out the outlet of the valve.
Salt Level
Resin Level
Brine Tank
Brine Level
Air Check
Salt Level
Resin Level
Brine Tank
Brine Level
Air Check
Page 8
Water Conditioner
CO N T R O L VA LV E S Flow Diagrams
3) Backwash Position
Flow Control Hard water enters unit at valve inlet, flows through piston,
Drain
Flow Control
down center tube, through bottom distributor, up the
Enjector
Inlet through the mineral, around the piston and out the drain
Outlet line. Water is passed through the resin bed in the opposite
Piston Resin Tank
direction of normal flow, which flushes suspended matter
Salt Level Resin Level
out of the resin tank. Backwashing also loosens the resin
Brine Tank
bed which becomes compacted during the softening (in
service) cycle.
Brine Level
Air Check
Air Check
Brine Level
Page 9
Water Conditioner
Flow Diagrams CO N T R O L VA LV E S
Air Check
Brine Level
Air Check
Brine Level
Page 10
Water Conditioner
CO N T R O L VA LV E S Flow Diagrams
Salt Level
Resin Level
Brine Tank
Air Check
Brine Level
Brine Level
Air Check
Page 11
AQT-56ST Time Control
Valve Drive Assembly CO N T R O L VA LV E S
Page 12
Time Control
CO N T R O L VA LV E S Valve Drive Assembly Parts List
* 12 1 Motor
13 3 A-11384 Screw, Motor mtg. and Ground wire
14 1 A-15614 Back Cover
15 1 A-12037 Washer
16 1 A-60514-01 Brine Cam Assembly, 7-30 lbs
1 A-66114 Brine Cam Assembly, 4-6 kg
1 A-60514 Brine Cam Assembly, 3.5-15 lbs
* 17 1 Electrical Cord
18 1 A-13547 Strain Relief
19 1 A-15678 Front Label
20 1 A-13011 Cycle Actuator Gear
21 1 A-19205 24-hour Gear Assembly, Silver
22 1 A-16715 Vale Position Dial, Filter
1 A-14176 Vale Position Dial, Standard
23 1 A-13864 Skipper Wheel Ring
24 2 A-13311 Spring, Detent, Skipper Wheel
25 1 A-14381 Skipper Wheel Assembly, 12-Day
26 1 A-13014 Regeneration Pointer
27 1 A-02107 Screw, Skipper Wheel Assembly
28 1 A-14177 Knob, Manual Regeneration
29 1 A-15151 Screw
30 1 A-15677 Knob Label
Page 13
AQT-56SM Meter Control
Valve Drive Assembly CO N T R O L VA LV E S
Page 14
Meter Control
CO N T R O L VA LV E S Valve Drive Assembly Parts List
* 12 1 Motor
13 3 A-11384 Screw, Motor mtg. and Ground Wire
14 1 A-15614 Back Cover
15 1 A-14043 Cable Assembly
16 1 A-14253 Spring Retainer
17 1 A-14276 Spring
18 1 A-13831 Clutch, Drive Pinion
19 1 A-56206 Drive Pinion, Program Wheel
20 1 A-12037 Washer
21 1 A-60514-01 Brine Cam Assembly, 7-30lbs
1 A-66114 Brine Cam Assembly, 4-6kg
1 A-60514 Brine Cam Assembly, 3.5-15lbs
* 22 1 Electrical Cord
23 1 A-13547 Strain Relief
24 1 A-15679 Front Label
25 1 A-13802 Cycle Actuator Gear
26 1 A-19205 24-hour Gear Assembly, Silver
27 1 A-15478 Valve Position Dial, Filter
1 A-14176 Valve Position Dial, Standard
28 1 A-A0007 Program Skipper Wheel Assembly, 10600gal
1 A-A0006 Program Skipper Wheel Assembly, 2100gal
29 1 A-13806 Program Wheel Retainer
30 1 A-13953 Cover Label
31 1 A-14177 Knob, Manual Regeneration
32 1 A-15151 Screw, Knob
33 1 A-15677 Knob Label
Page 15
Control Valve
Assembly CO N T R O L VA LV E S
Page 16
Control Valve
CO N T R O L VA LV E S Assembly Parts List
Page 18
CO N T R O L VA LV E S
NOTES:
Page 19
www.aquatroltech.com
CO N T R O L VA LV E S