As 3
As 3
As 3
Headquarter Office,
Churchgate, Mumbai-20
The Amendment Slip No. 3, January 2009 to the G&SR- 2008 edition, is given
below :
SR 3.70(1) On single line section, provided with Tokenless Block Instruments the
failure of the last Stop signal is to be considered as failure of the
Tokenless Block Instruments. In such cases, the Loco Pilot shall be
given 'authority' on Form T/C 1425 or T/D 1425 (Paper Line Clear
Ticket, for Up and Down direction respectively) as the case may be, to
pass the last Stop signal in 'ON' position .
For COM-CCG
WESTERN RAILWAY
Headquarter Office,
Churchgate, Mumbai-20
For COM-CCG
(II) Taking and making over time : Taking and making over time should count as duty as
under :-
(ii) Electric –
(a) Where the charge of locomotive is taken over in a shed equipped with
servicing facilities 30 mts. before departure of locomotive from shed and 15
mts. after arrival of locomotive in shed.
(b) Where the charge of locomotive is taken over from an intermediary at loco
siding or any other similar place without servicing facilities – 40 mts. before
departure of the locomotive from loco siding/any other similar place and 15mts.
after arrival.
Note:- Where locomotive is taken over in shed, the time taken for movement of
engine from shed to the yard will be over and above 45”/30"/40", as the case
may be, and the same should be laid down for each shed by DRM concerned
taking in account the local conditions.
A. Goods trains –
(i) At train originating and train examination stations – 45 mts. for taking over and
30 mts. for making over charge.
(ii) Other than train originating and train examination stations – 15 mts. for taking
over and 15 mts. for handing over charge.
B. Passenger trains –
(i) At train originating and train terminating stations – 30 mts. for taking over
and 30 mts. for handing over charge.
(ii) Other than train originating and train terminating stations – 30 mts. or
less according to halt of the train subject to a minimum
of 15 mts.
(a) Time for taking or making over specified in para II above shall be counted as time
on duty.
(b) Running duty in the case of running staff should not ordinarily exceed 10 hours at
a stretch and such staff are entitled to claim relief after 12 hrs. of duty at a stretch
provided they have given 2 hrs. notice for relief to the section controller.
Note: - For the purpose of computing duty at a stretch, time shall be calculated from the
actual departure of the train from the starting station.
(c) Running staff traveling as passenger on duty before or after working the train -
(i) will not count as duty if the journey does not exceed 4 hrs.
(ii) Staff classified as” Continuous” will be counted as ON duty for 2/3 of the
traveling time in excess of 4 hrs.
(iii) Staff classified as” Essentially Intermittent “ will be counted as ON duty for full
traveling time in excess of 4 hrs.
(d) Waiting at the place of duty and not resting will count as duty during which an
employee can be given other suitable work, before he actually starts on running
duty
IV. Traveling spare - No rest should be allowed if the journey as spare does not exceed
4 hrs.
the scales of rest to be allowed are as under :-
(a) At outstations – 1 hr. rest if the journey as spare exceeds 4 hrs.
2 hrs rest if the journey as spare exceeds 7 hrs.
3hr. rest if the journey as spare exceeds 10 hrs.
(b) At Hqrs. station -2 hrs. rest if the journey as spare exceeds 4 hrs.
3 hrs rest if the journey as spare exceeds 7 hrs.
5 hrs. rest if the journey as spare exceeds 10 hrs.
Note:- Those who are in scheduled links will pick up their schedules.
(c) Time spent by running staff in crew vans, rest vans or rest rooms, running rooms
or compartments provided for their use will count as rest and not as duty.
V. Periodic Rest – Running staff and “Other Running Staff” shall get the following
periodic rest–
(a) Continuous- 4 periods of not less than 30 consecutive hours each or 5 periods of
not less than 22 consecutive hours each in a month. Periodic rest given at Hqrs.
should always include a night in bed.