100% found this document useful (1 vote)
1K views3 pages

EEEPL - JSA Unloading Materials

This document provides a job safety and environment analysis for unloading materials from a vehicle. The key risks identified include injuries from the vehicle while unloading, muscle strains from lifting materials, and dust or sharp edges from the materials. Precautions recommended handling materials safely, using lifting assistance, and wearing protective equipment like masks and gloves. The responsibilities are assigned to site engineers and safety officers to oversee safe unloading practices.

Uploaded by

nishanth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views3 pages

EEEPL - JSA Unloading Materials

This document provides a job safety and environment analysis for unloading materials from a vehicle. The key risks identified include injuries from the vehicle while unloading, muscle strains from lifting materials, and dust or sharp edges from the materials. Precautions recommended handling materials safely, using lifting assistance, and wearing protective equipment like masks and gloves. The responsibilities are assigned to site engineers and safety officers to oversee safe unloading practices.

Uploaded by

nishanth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Ref.

No:
Revision No. JOB SAFETY &
Date ENVIRONMENT ANALYSIS

Job Title: Un loading of material’s Date of Job


Analysis:

Projects: BSH HOUSE HOLD APPLIANCES Reference No:

Analyst/ Reviewer: PTK Safety department

Description of Job:
Unloading of materials from vehicle to store area.

Sequence of job steps Risks identified Precautions advised Responsible person


Vehicle may hit someone Make sure the drive way is safe
Park the vehicle where material while moving in. and clear for truck to drive
has to be unloaded through. Site Engineer & Safety
Obstructing other vehicle officer
human movement Identify/demark the parking area
where vehicle has to be unloaded
Muscle or tendon strain
getting on and off the vehicle. Do not jump off the truck, use the
provided “steps” or use a ladder
Use cut/abrasive resistant gloves,
pad up the uneven surface.
Handle these types of materials
Handling of the material to be Material may have glass, sharp with packing.
lifted edges and splinters.
Ensure that the hand/fingers do Site Engineer & Safety
Material does not have not get jammed in between officer
adequate side clearance for material and vehicle sides while
lifting. carrying material with hands
inside the maximum width of the
Material in odd shape to carry. item carried.

Dust inhalation and entry to Ensure that you get additional


the eye support of personal before lifting.
Discuss with him and then lift the
material. Use the material trolley
whenever possible.
Where face mask and goggles
whilst handling the materials.

Unloading of material from


vehicle to ground Muscle strain Site Engineer & Safety
Take proper and safe body officer
Pinch points between material positioning before handling
and vehicle. materials.

Check the vehicle for any falling


Injury to foot t inhalation and or loose material that may fall on
entry to the eye you and hard hat should be worn
Ref. No:
Revision No. JOB SAFETY &
Date ENVIRONMENT ANALYSIS

at all times.
Preparation of work Tripping due to obstruction in Wear the appropriate gloves. Site Engineer & Safety
environment. your path. Wear safety Shoes. officer
Housekeeping
Inspect work / walk area for
potential slip trip fall obstructions
prior to start of work and remove,
if not possible mark with visible
tape / flags.
Keep work area organized and
free of surface obstructions
during task.
Inform operator in area of
ongoing works.
Close work area to prevent Site Engineer & Safety
entrance of others. officer
General clean of the area prior to
starting activity.

Deploy two persons to unload


material
Weight limit for male<25kgs
Don’t shift the material
through stair case without
approval from PTK & BSH
Labor should be ensure proper
induction and job specific
training
Area should be barricaded
Access should be free from
unwanted materials and debris
Basic PPE’S (Safety Helmets,
Reflective jacket, , Hand
gloves, Safety shoe, Safety
Harness, Safety Goggles –
Drilling)(Task Specific)

Suggested safe system of work:


Ref. No:
Revision No. JOB SAFETY &
Date ENVIRONMENT ANALYSIS

Suggested Review date: (if required)

Suggested further job safety instructions: (if required)

Suggested training programs: (Tool Box Talks)

Signed By: Approved By:

You might also like