Standard Work Chart: (NVA) (NVA) (NVA)

This document contains a standard work chart that outlines the cyclic work elements for an assembly process. The chart includes 31 process steps with descriptions of operator work activities, whether they are value-added or non-value added, and estimated time durations. It also provides information like annual volume, takt time, and identifies machine and walking times.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
331 views2 pages

Standard Work Chart: (NVA) (NVA) (NVA)

This document contains a standard work chart that outlines the cyclic work elements for an assembly process. The chart includes 31 process steps with descriptions of operator work activities, whether they are value-added or non-value added, and estimated time durations. It also provides information like annual volume, takt time, and identifies machine and walking times.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

STANDARD WORK CHART

Analyst(s):
O
PROJECT: Product: p Date: VA Manual Time
e NVA Manual Time
r
Process Name: a Machine Time
Annual Volume: t NVA Walking
Takt Time: 4,000.0 secs/pc Minutes/Shift o NVA Wait for Cycle
r

CSeconds
l
o
ELEMENT TIME c
CYCLIC WORK ELEMENTS VA = Value Added, NVA = Non-Value Added
k Seconds
(VA) (NVA) (NVA) T
i
ID DESCRIPTION OF OPERATOR WORK Manual Manual Machine (NVA) Wait for m
Operation Operation Time Walking Cycle e 0 1000 2000 3000 4000 5000 6000 7000
1 ATP ###
2 Gather paperwork - Travelers 15 ###
3 Scan into job 45 ###
4 Gather paperwork -ATP 15 ###
5 Bring Units to test bench 5 ###
6 Gather Test Equipment 120 ###
7 Set up Test equipment/Review ATP 360 ###
8 Test Unit(s) 760 ###
9 Get stamps/Stamp off traveler 45 10 ###
10 Get hardware (screws) 5 ###
11 Install screws 195 ###
12 Stamp off traveler 45 ###
13 Move unit to leak check 15 ###
14 Scan out 15 ###
15 ###
16 Leak Check/Bake ###
17 Scan into job/Stamp traveler 60 ###
18 Retrieve tools 20 ###
19 Walk to chamber 5 ###
20 Remove Screw 15 ###
21 Fill unit w/Helium 15 ###
22 Re-install screw 15 ###
23 Test unit (Leak check) 120 120 ###
24 Remove unit from chamber 10 ###
25 Remove Screw 15 ###
26 Get Stamps 5 ###
27 Stamp off traveler 10 ###
28 Retrieve unit 5 ###
29 Attach Safety wire 180 ###
30 Walk to oven 5 ###
31 Load unit into oven 25 ###
32 Set up bake cycle 30 ###
33 Bake Unit for 24 Hrs. 86400 ###
34 ###
35 ###
36 Final Leak Check ###
37 Scan in 45 ###
38 Retrieve tools 20 ###
39 Walk to chamber 5 ###
40 Remove unit from oven 30 ###
41 Fill unit w/Helium 15 ###
42 Install screws 20 ###
43 Walk to bench 5 ###
44 Blow off unit 15 ###
45 Walk back to room 5 ###
46 Trest Unit (Final leak check) 120 120 ###
47 Remove unit from chamber 10 ###
48 Walk to bench 5 ###
49 Stamp off traveler 15 ###
50 Scan out 15 ###
51 ###
52 ESS - Vibration ###
53 Retrieve units from shelf 10 ###
54 Walk to ESS area 10 ###
55 Gather test equipment 75 ###
56 Scan into job 45 ###
57 Walk to VIB table 5 ###
58 Retrieve VIB fixtures 30 5 ###
59 Retrieve hardware (VIB fixture) 10 5 ###
60 Mount VIB fixture to table 180 ###
61 Place units on table 10 ###
62 Get masking tape 60 ###
63 Tape units 70 ###
64 Mount units to fixture 25 ###
65 Attach cables to units 100 ###
66 Test units 900 900
###
67 Walk to VIBtable from control room 5 ###
68 Disconnect units & cables 50 ###
69 Remove units from fixture 20 ###
70 Remove tape 50 ###
71 Remove fixture from VIB plate 130 ###
72 Return screws 5 ###
73 Return fixture 5 ###
74 Walk to Chamber 15 ###
75 ###
76 ESS - Chamber ###
77 Attach test equipment 150 ###
78 Load units 120 ###
79 Turn units on 60 ###
80 Test units - Burn-in 172800 ###
81 Walk to bench 10 ###
82 Stamp traveler 60 ###
83 Scan out 60 ###
84 Walk to ESS area 5 ###
85 Enter data into ESS log 60 ###
86 Place travelers in ESS rack 15 ###
87 Update ESS WIP board 15 ###
88 Walk to Chamber 10 ###
89 Unload units 120 ###
90 Detach test equipment 150 ###
91 Enter data into ESS log 60 ###
92 Take travelers from ESS rack 10 ###
93 Update ESS WIP board 15 ###
94 Walk to bench 10 ###
95 ###
96 ###
97 Final ATP (Estimate) ###
98 Scan into job 45 ###
99 Gather paperwork -ATP 15 ###
100 Bring Units to test bench 5 ###
101 Gather Test Equipment 120 ###
102 Set up Test equipment/Review ATP 360 ###
103 Test Unit(s) 760 ###
104 Get stamps/Stamp off traveler 45 10 ###
105 Move units to next operation 15 ###
106 ###
107 ###
108 ###
109 ###
110 ###
111 ###
112 ###
113 ###
114 ###
115 ###
116 ###
117 ###
TOTAL TIME BY CATEGORY==> 2210.0 2950.0 575.0 900.0
% OPERATOR TIME BY CATEGORY==> 33% 44% 9% 14% TOTAL OP TIME = CYCLICAL + NON-CYCLICAL TIME 6,635 secs
TOTAL CYCLICAL TIME==> 6635.0 THROUGHPUT/SHIFT= AVAILABLE MINS PER SHIFT/TOTAL OP TIME 0 pcs
NON-CYCLICAL WORK ELEMENTS Seconds WORK FLOW DIAGRAM
TIME PCS RATE
1 0.0
2 0.0
3 0.0
4 0.0
5 0.0
6 0.0###
7 0.0
TOTAL NON-CYCLICAL TIME==> 0.0
Operator Balance Chart

Project: Date:

Number of Total Manual Wait for Mach.


Op # Operator Work Description Walk Time
Operators Work (sec/cycle) Cycle
(sec/cycle) (sec/cycle)

TOTALS sec/cycle sec/cycle sec/cycle

Design Cycle Time:

Operator Balance Chart

30

25
S e c o n d s /C y c le

20

15

Wait for
10 Mach.
Cycle
(sec/cycle
)
5
Walk Time
(sec/cycle
)
0
Total
Manual
Work
(sec/cycle
)

Capacity
Cycle
Time

Design
Cycle
Time