0% found this document useful (0 votes)
31 views1 page

Rua São Damião

The document contains a diagram of an area with dimensions. There is an area labeled A with a radius of 3 meters and perimeter of 25 meters. The area is a circle with a radius of 3 meters and circumference of 25 meters. There is also text showing the radius, circumference, and area calculations for the circular region.

Uploaded by

itallo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Rua São Damião

The document contains a diagram of an area with dimensions. There is an area labeled A with a radius of 3 meters and perimeter of 25 meters. The area is a circle with a radius of 3 meters and circumference of 25 meters. There is also text showing the radius, circumference, and area calculations for the circular region.

Uploaded by

itallo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ÁR

EA
VE A.
RD A VE
E P= =25 25
70 0m
.00 ² .00
RD
E R=3.00
m
A
P= =25 25
70 0m
.00 14

0
.00 ²

3.0
A
m
.00 N

R=
P= =25 25
70 0m
.00 ² .00 13 10 .20 A
m 22 P= =37
75 7,4
A
P= =25
25 .00 .00 0m
70 0m .00 12 10
m ²
13
Q-01
.00 ²
m
.00 17 A
P= =25
A 0 10 .00
P= =25
70 0m 25 11 10.0 .20
70 0m
.00 ²
.00 ² .00 12 22 m
.00
m

14 0
A A
P= =25 25 .0 10 25 P= =25
14
70 0m
.00 ² .00 10 10 11 .00 70 0m
.00 ²
10
.00 .2 0 A
m 0 m 22 P= =37
ÁR A 0 0.0 A 75 7,4
0.0
P= =25 .00 0m
EA 25 1 25 P= =25
IN
70 0m
.00 ² .00 09 1 10 .00 70 0m
.00 ²
m ²
ST m 0 m A
P= =25
17
0.0 R=3.00 m
I .00
79.04
TU
.00
A A 70 0m
CI P= =25 25 1 25 P= =25 15
ON
AL
70 0m
.00 ² .00 08 10 09 .00 70 0m
.00 ²
.00 ²
m
A 25
.00
m m P= =25 .00
.00
A
P= =25 25 O 10 25
A
P= =25
70 0m
16
70 0m
.00 ² .00 07 10 IÃ 08 .00 70 0m
.00 ²
.00 ²
m

50
A 25
AM 0 .00
m m P= =25
A
.00 0.0 .00
.00

.3 9
P= =25 25 D 1 25
A
P= =25
70 0m
17 10
70 0m 06 10 07 .00 70 0m
.00 ²
10
ÃO

m
.00 ² .00 .00 ² m
A 25
.00 .00
m
A
.00
S 10 A
m P= =25 .00 10 .00 14
P= =25 25 05 10 A 25 P= =25
70 0m
.00 ² 18 10
10
RU
70 0m
06 .00 70 0m
R=3.00

.00 .00 ² .0 0 .00 ² m


0 A 25
.00
m m P= =25 13
0.0 .00

A= 70.0
A
.00 .00 10

25

P=
P= =25 70 0m
25 1 25 19 10

25 0 m
04 10 .00 ²

0
10 70 0m
05 .00

.00

3.0
0m
.00 m

Q-06 25.00
.00 ²
.00 A 25
.00 .00

²
Q-03
m
.00 12

R=
P= =25

A= 70.0
A
.00 .00

25

P=
P= =25 10 70 0m 10 10 15

25 0m
A
P= =25 25 03 10 25 .00 ² 20

.00
70 0m
04

0m
10 .00 .00 m
10.00
75m
70 0m .00 ²

A= 80.0
²
.00 ² .00 m 0 25 0 .00 11 .

A= 70.0

P=
.00

0.0 0.0 100 10.00

25

P=
m .00
.00
01

37 0m
A
10

15
A

25 0m
P= =25 1 25 1
P= =25 21
30

5m
25

A 25 02 10 14

.0
10.00

0m

.00
P= =25 70 0m
.0 03 .00 70 0m m

²
10 89.38

0
.00 ²

²
70 0m 0 .00 ²
.00 10 13

A= 70.0
25

A= 70.0
.00 10.00
m
.00 .00

A= 447
P=
.00 ² m

25

P=
.00

01 10 25.00

P=
25 0m
.00 .00

25 0m
m
10 10

25

A= 70.0
A

84 .50
25 22 12

0m

P=
P= =25
10.00

.00
10

0m
01
25

75 m

25 0m
02

.00
P= =25 .00 70 0m
16

A= 70.0
²

25

A= 70.0
²
09 11

.92
.00

0m
A= 70.0
10

P=
P=
10.00
.00 ²

A= 70.0
70 0m 25

25
A

P=
.00

25 0m
0
R=3.00

25

25 0m
P=
10

m
.00

.00
.00 ² m P= =25

²
.0

25 0 m

10
.00

25

A= 70.0
25 0 m
02 0 .00 10

0m
10 O

0m
²
.0 A
10

.00

P=
m
10.00
70 0m

0m
.00
25 23

0m
10 P= =25 15

25 0m

.00
SM

²
.00
.00 ²

²
25

A
01

25

A= 70.0
.00

²
70 0m
09 25.00

0m
²
P= =25 0 08

A= 70.0
m

P=
10.00

A= 70.0
.00 ² .0

25
10 O

P=

25 0m
R=3.00

25
25

P=
A

.00
70 0m

²
0 10

25 0m

25

A= 70.0
m P= =25 C

25 0m
.00 .0 08

0m
.00 ²

P=
.00 10.00 17

.0
.00

A= 70.0
0m
03 10

.00
A

0m
70 0m
O 16

25 0m
0.0
m 25

P=
24

.00
P= =25

²
0

25

A= 70.0
.00 ²

²
07

25 0m

0m
.00

²
25

P=
A 0 07 10.00

A= 70.0
70 0m

10
m
P= =25 .0

0m
25

25 0m
P=

.00
25
.00 ²

²
10 25 10

25
25 0m
A
30 .00 A 06

20

0m
70 0m

.00

²
m P= =25
10.00

.00
A .00 .00

0m
.00
RU

.00
.00 ²
P= =32 10 17 25.00
.00

.00

²
70 0m
04

.35

25

A= 70.0
m
25

A= 70.0
10 05

²
R=3.00

P=
72 6.7 .00 ² 0 06 10.00

P=
A= 70.0
.0

25 0m
25

25
A .70 8m

25 0m
m

P=

.00
25
18

25

A= 70.0
P= =25 10
Q-04 Q-07

A= 70.0
25 0m
04

25
0m
m ² A 25

P=

0m
10 .00 10.00

P=
.00
P= =25
.00
70 0m
87m

0m
.00

25 0m
.00
17

25 0m
18

.00
.00

A= 80.0
.

²
.00 10

25

A= 70.0
.00 ²

A= 70.0
60. 03

00
25
70 0m

15
.00

0m
10

P=
05 .00 20 A 26

0m
²

P=

P=
m
29 0 05

A= 70.0

37 0 m
.00 ²

25 0m
A= 70.0
0.0

25 0m
.00
25

²
P=
25.00

.00
25

25

A= 70.0
P=
m
.00
25

5m
A= 70.0
02 R=3.00

00
A

25
0m
25 0 m

P=

0m
25 0m
P= =25 1 19

P=
P= =25 25
.00

.00

25 0m
.00 10

0m

²
.00

25 0m
.00
10

²
0m
19

.
1

²
70 0m

25

A= 70.0
70 0m .00

A= 70.0
01

00
25
0m
10 11
28 10

0m
P=
.0 0 OM

34

²
20

P=
.00 ² .00 ²
27

²
0 04 R=3.00
.00

0.0

25 0m
06 .00

A= 70.0
ZO

25 0m
.00
0 0.0

²
m 10 m

25

²
25

A= 70.0
25

P=

A= 70.0

00
25
0m
2

0m
10

P=
21

P=
25 0m
.00 1
25

A= 80.0
A

25 0m
.00
.00

25 0m
10.00

.00
P= =25

P=

²
.00
.00

.0
0m

²
20

15

25
37 0m

0m
10

0m
70 0m
10 10 10 22

0
²
A
.00 03

5m
.00 28 .00 10.00
.00 ²

A= 70.0

²
P= =32

.00

²
.00

25
07

A= 70.0

00
25

25
P=

3.0
m
10

25.
10

²
23

P=
72 6.7
00

25 0m

25 0m
15. 10.00

.00
0
25

A .70 8m

.00
.00

R=
47.58

0m
21 .0

A= 70.0

A= 70.0
25.00

25
P= =25

0m
00
m ²
24

P=
09

P=
10 10 m

²
0 02

25 0m
0 10.00
70 0m

25 0m
A= 70.0
17

²
A= 70.0

.00
0.0 0.0

25

A= 70.0
P=
04

25
.00 ² .00

25

0m
P=
0

0m
25.
34
.00

25

A= 70.0

P=
.00

25 0m
08 0.0 .00

25 0m
m 1 1

P=
10.00

25 0m
.00
.00

²
0m
10

.00

25 0m
0m
R=3.00

A= 70.0

A= 70.0
22

00
25
2
25

0m
A

00
26

RU

P=
10
P=
P= =25 10 08

0m
²
10.00

25 0m
25 0m
01 0

A= 70.0

.0

²
10

A= 70.0
.0

A= 70.0

25
25
70 0m

25
P=

.00

²
5.0

0m
25

0m
.00 03

P=

25.
10 27

P=

0
25 0m
.00 ² .00
25.00

25 0m
10.00
.00

25 0m
10

A
09

.00
.00

²
²

.00
.00

0m
m

.00
RU

A= 70.0
A= 70.0

25
GE

0m
23 70

A= 80.0

0m
00
28

P=
P=
10 07 18.
25

P=
A

²
R=3.00 10.00

25 0m
25 0m
0

ES
²
33

A= 70.0

.
37 0m
A= 70.0

²
P= =25
TO

25
R 0.0

A= 70.0

00
25
A 0

P=
25
I 02

P=

0m
0m
10 25 5.0 29

25.
P=

5m
70 0m

25 0m
25 0m
1
DV 10.00
2

25 0m

.00
BR PIN
1

.
.00

10

²
²
.00 ²
I

.00

TR
0

0m
M

00
0m
.00

.00

A= 70.0
10 RAN
0m

A= 72.6
O
24 .0 30

A==70.
00
m

P=

P=
ZO E
10 06

.00
P

²
10.00

25 0m
AS 0 UA

25
R=3.00

31 0m
A= 70.0
25

DO

25 00m
A
0.0 25.00

14.60
R=3.00
TA 01 UA G

25
P= =25

0m
P=
31

EL
25.

8.4

0m
.00
25 0m
1

10
70 0m 10 IL N 10.00 R

²
.00

3m
.00 N

25.
0m

²
.00 ² .00 25 32

00
U

.00
00
.00

11 AN SA

A
05 10.00

²
m
10 25.

A==70.
²
.00
DM

0
A= 70.0

P
00
05

25
25

3.0
25

25.
P=

A= 80.0
A
10

25 00m
DI A

15
P= =25
10.00

25 0m

P=
.00

A= 70.0
E

0m
RU R=3.00

37 0m
10

.00
R=
.00

P=
A= 70.0
.00

0m
70 0m
A 15

.00
26

00
12

A==70.
A.
R

25 0m
P=

5m
Q-05

²
.00

A= 80.0
.00 ²

P
VE
10 04

25 0m
.00
.00

25.
12 DO

10
0m

P=

25 00m
A= 70.0

R=3.00
m

²
RD

0m

37 0m
25.
25
P= 10 04

0m
²
25

.00
0
25 0m
A E
00

A= 70.0
NA

5m
0
²
P= =25

.0
25.

P=
A= 70.0
.00

.00
.00

²
0m

0
00
10 27

RU
25 0m

²
P=
06

13
70 0m
13

A==70.
03 R 10 0

25 0m
10 .00

25.
² 0

0m
.00

P
25.
.00 ²
13 VE
.00

0m

25 00m
25.
10
25

25
²

A==70.
21

A= 70.0

0m
A
00
²

P
GO
25

P=

A= 80.0
A

A= 70.0
.00

10
.00 0

.00

25 00m
0
P= =25 0 03

25 0m
28

P=
P=

²
.0 0.0

37 0m
10

25 0m
.00 02

FR
25.

0m
10

0m
70 0m

.00
14 10 A 1 00

5m
30

0m
.00 25.

25.
.00 ²
10

10

²
.00

RU

²
14 m
07

00

²
²

A==70.
0

25
.00

AN
A= 70.0

.00
02 0

P
A= 70.0
0 25.

00
25

P=
0.0

P=

25 00m
P= =25 15

25 0m

.00
01

25.
0

25 0m
R=3.00

A==70.
10 15

0m
1 .0

P
70 0m

0m
25.

0m

10

10
10

CI

25 00m
.00 ² .00

A= 70.0

²
0
.00

25
²
15

P=

²
A= 70.0

0m
m R=3.00 01

.0

.00
00

00

25 0m

A= 70.0
P=
.00 29

SC
.00
25.

10
P=
Q-02
25

25 0m

²
A

25.

0
0m
P= =25 16 .00 25

25 0m
05 08

A==70.
0m
0

25.
10

.00
10 0

P
²

0m
25.
70 0m

A= 70.0

00

25 00m
²
.00 ² .00

P=
.00

A==70.
25
16

00

25 0m

0m
m

P
10

10
25.

MO
.00

0m

25 00m
17

²
.00
25

A= 80.0
A

A==70.
P= =25

0m
P=
10

.00
²

.00
P
00

A= 70.0
.00

37 0m
10

00
28
22 25.

25 00m
0

10
70 0m

P=

²
3.0

5m
.00 25 06 09

25 0m
.00 ²

0m

NT

A==70.
.00

17 R=3.00 0

.00
0

25.

P
m 0 25.

0m

²
R=
18

²
0.0

25 00m
0
25

A==70.
A==70.
.0

0m
A= 70.0
P= =25 1

P
P

IL
25

10
P=

10
10

25 00m
0

25 00m
70 0m

²
25 0m

A==70.
.00

0m
0m
.00 ²

25.

.00

HA

.00
P
0m
.00
.00

18 A.
19 .00 27 00
25.

25 00m
m

10

²
²
VE
10

²
25 07 10

A= 70.0

0m
25

00

A==70.
A RD 0
38

.00
P=
P= =25 0

P
25.

²
25 0m
E

25 00m
70 0m 10 0

25.

A==70.

A==70.
0

0m
.0

0m
.00 20

10
.00 ²
0.0

P
.00

25

10
19

10
25 00m

25 00m
²
m

²
1

00

.00

A==70.
0m

0m
.00
25

.00
A
P= =25 .00 26 00

25 00m
25. 11

10
²

²
RU
0 25 08

0m
70 0m
21 0.0

A==70.
37 0

.00
0

P
.00 ²
25.
.00

²
20 1

25 00m
m
.00

A==70.
A

0m
10

P
25

A
25

10

10
25 00m
P= =25
.00
Q-08

²
.00

A==70.
M

0m

.00
70 0m

.00
10 .00 25 00

25 00m
25.
.00 ²

10
²
.00

IR
21 25 09 12

0m
m
36 0

.00
0
25.
25

²
AS
0

A==70.
.0

10

P
A.
25

10

10
30

25 00m
VE R=3.00

A==70.
.00
22

0m
RD
24

.00
P

.00
00

OL
.00

25 00m
E
25.

10
²
25 10 13

0m
35 0
R=3.00

.00
0
25.

²
0

A==70.

A==70.
.0

10

P
25

10

10
0

25 00m

25 00m
3.0
.80

A==70.
.00
R=3.00

0m

0m
.00
P

.00
12 .00 23 00

25 00m
R= 25.

10
²

²
25 11

0m
14

A==70.
03 34 00

.00

P
25.

25 00m
0

A==70.

A==70.
.50 .0

10

0m
P

P
25

10
A

10
25 00m

25 00m
10

²
P= =25

.00
25

0m

0m
.0

.00
.00 70 0m
.00 22 00
25.

10
²

0
.00 ²

²
02 m 25 12 15

A==70.
33 00

.00

P
0
0.6
Q-09 25.

25 00m
10 0

A==70.
.0

10

0m
1 25 .00

P
25

10
A

10
25 00m
.00 P= =26

²
.00

.00

0m

.00
71 2.5
R=3.00 .00 0m 04 .00 21 25.
00

10

²
01 m ² 10 25 13 16

A==70.
32 00
38

.00

P
.00 25.

25 00m
.00

A==70.
A A.

A==70.
.00
15.00

10

0m
P
A P= =25

P
VE
25

10
P= =31

10
25 00m
25 05

25 00m
70 0m
RU

²
RD

.0

0m
84 8.4

.00

0m
.00 ² E
10

.0
.82 3m
.00 00

0
m
20 25.

10
A

²
.00

0
m ²
25 14 17 R=3.00

A==70.
A 0 BR 31 00

.00

P
P= =25
5.0 25.

25 00m
A
0 06 .00

A==70.
P= =25 70 0m

A==70.
.3 2

10

0m
P
R=3.00 AS

P
.00 ²
25

10
23 70 0m 10

25 00m

25 00m
m

²
.00 ²

A==70.
.00
.00

0m
11 IL

.00

0m
P
m
.00

25 00m
A
.60 .00 19

10
P= =25 AN

²
25 15

0m
A
.00 25 07

A==70.
P= =25 70 0m
30 00

.00

P
47 25.

²
.00 ²
25 70 0m 10 DI

25 00m
.00

A==70.
.00 ² m

10

0m
P
10 .00 25

10
m
A

25 00m
.00 A
.00

²
.00
PLANTA GEOMÉTRICA

A==70.
P= =25

0m

.0
P
A
.00 P= =25 25 08 .00

25 00m
70 0m
18

10
46 25
.00 ²
25 16

0m
70 0m
.00 ² m 10 29

.00
10 .00

R=3.00
²
m
.00

A==70.
.00 A
.00

10
P= =25

P
25

10
A

25 00m
.00 P= =25 70 0m 25 09

.00

A==70.
45
ESC 1/700

0m
.00 ²

.0
P
25 70 0m 10 .00

25 00m
.00 ² m

0
10 .00 25 17

0m
m
.00 A
P= =25
5.0
0 28

²
A
0 P= =25 10 0

A==70.
70 0m 2
.0 .0

10
44

P
.00 ²
25

10
25 70 0m 10

25 00m
.00 ² m

A==70.
.00
RU 10 .00

0m

.00
P
m
.00 A
.00

25 00m
.00

²
P= =25
A
25 18

0m
A 43 5.0
0 P= =25 70 0m 25 11 27 ÁREA DAS QUADRAS

²
.00 ²
PA 2 70 0m 10 0

A==70.
.00 ² m
.0

10
10 .00

P
25

10
m
DR

25 00m
.00 A 0

A==70.
.00
P= =25 .0

0m

.00
P
A
E .00 P= =25 70 0m 25 12 .00

25 00m
²
42 25 70 0m .00 ²
10 25 19 QD QD QD AREA

0m
PA 10 .00 ² m
.00 26 AREA AREA

²
m
UL .00 A 0

A==70.
0 .0

10
P= =25
5.0 A=

P
25

10
A
.00 13

25 00m
P= =25 70 0m
I 2
01 05 09 8.628,02

.00

A==70.
NO 41

0m
.00 ² P= 25
3.275,13 5.510,11

.00
25

P
70 0m 10
m 70 0m
.00

25 00m
.00 ²

²
10 m .00 ² .00 25 20

0m
.00 m 0 25
5.0 A=
Q-10

²
A
.00 P= =25 14 0
02 06 10 4.037,01

A==70.
40 2 .0

10
5.970,17 8.475,92

P
P= 25
25 10 25

10
70 0m

25 00m
.00 ² 70 0m

.00

A==70.
10 .00

0m
.00 ²

.00
P
m
.00 m
.00 .00

25 00m
²
25 21

0m
.00 25 15 24 03 07 11 10.581,55
39 7.120,78 8.244,20
47

²
25 10 0 R=3.00

A==70.
10 .00 .0

10

P
A
P= =25 25

25 00m
.00 A 0

A==70.
.00
70 0m P= =25 .0

0m

P
04 08

0
.00 ²
.00 70 0m 25 16 6.585,80 6.876,56

25 00m
3.0
38

²
m .00 ²
25 10

0m
m
23

R=
10 A .00

²
P= =25
.00 .00
A 0

A==70.
P= =25
5.0

10

P
70 0m A
0 17 25

25 00m
.00 ² P= =25 70 0m 2
37 5.0

.00
m .00 ²

0m
2 70 0m
.00 ² m 10
10 .00

²
m
.00 A
A
P= =25 .00 22
0 P= =25 70 0m 25 18
36 5.0 QUADRO DE ÁREA

10
.00 ²
2 70 0m
.00 ² m 10
10 .00

.00

R=3.00
m
.00 A
P= =25 0
.00
A
P= =25 70 0m 2 5.0 19 QUADRA Área m² Porcentagem %
35 25 70 0m
.00 ²
.00 ²
m 10
10 m .00
.00
0 A
P= =25
A
P= =25
70 0m 25.0
0
20 Área de Lotes (277) 71.268,24m² 63,56 %
34 25.0 70 0m
.00 ²
.00 ²
m 10
10 .00
.00
m
A
A
P= =25 .0 0 Área Verde 11.516,32m² 10,72 %
33 .00 P= =25 70 0m
.00 ² 25 21
10 25 70 0m
.00 ²
m
m 10
.00 Área Institucional 3.510,76m² 5,96%
.00 A
P= =25 0
0 A
P= =25 70 0m 5.0 22
10
32 2 5.0 70 0m
.00 ²
m
.00 ²
m
2 10
.00 Área de Ruas 7.695,23 19,76%
.00 A
P= =25 0
0 A
P= =25 70 0m 2 5.0 23 SOMA TOTAL 118.461,97 100%
31 25.0 70 0m
.00 ²
.00 ²
m 10
10 m .00
.00 A
P= =25 0
.00
A
P= =25 70 0m 2 5.0 24 10
10
30 25 70 0m
.00 ²
.00 ²
m .00
m
.00 A
P= =25 0
.00
A
P= =25 70 0m 2 5.0 25 R=3.00
10
29 25 70 0m
.00 ²
.00 ²
m UNIÃO EDUCACIONAL DO NORTE
.00
m
.00 A
P= =25
A 25 UNINORTE
28 .00 P= =25 70 0m
.00 ²
10 25 70 0m
.00 ² m
.00
m
A ARQUITETURA E URBANISMO
27 .00 P= =25
10 25 70 0m
.00 ²
m
.00 DISCIPLINA:
.0 0
26 25 DESENHO URBANO
10
R=3.00

.00 PROJETO: ESCALA(S):


PROPOSTA DE LOTEAMENTO PARA O BAIRRO RUI LINO I
ESCALA:
PROFESSORES:
INDICADA
EMERSON SIMPLÍCIO E GIRLENE ARAÚJO
ALUNOS: DATA:

IRLANE LEÃO, MARINA VIEIRA, DIULIANE SOUZA E RAIZZA CARDOSO 27/11/2018


CONTEÚDO: FOLHA:

PLANTA GEOMÉTRICA
01/05

You might also like