Comment: Also - Please Note That The Enterprise Projects Typically Present The Tie Spacing at The Top of The

The document requests that future projects present the tie spacing at the top of piers as 3 inches to the top tie and 2 inches to the next tie below. Ties or transverse reinforcement act as shear reinforcement when anchor bolts are subjected to shear, and closely spaced ties help prevent cracking and its propagation.

Uploaded by

HIMAKSHI BHATIA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views2 pages

Comment: Also - Please Note That The Enterprise Projects Typically Present The Tie Spacing at The Top of The

The document requests that future projects present the tie spacing at the top of piers as 3 inches to the top tie and 2 inches to the next tie below. Ties or transverse reinforcement act as shear reinforcement when anchor bolts are subjected to shear, and closely spaced ties help prevent cracking and its propagation.

Uploaded by

HIMAKSHI BHATIA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Comment: Also – please note that the Enterprise projects typically present the tie spacing at the top

of the
pier as 3” to the top tie and 2” to the next tie as shown. Please present the ties with these dimensions
going forward.

Reason:

This (tie or transverse reinforcement) acts as a shear reinforcement. When anchor bolts are subjected to
shear , then these closely spaced ties act as shear reinforcement in preventing cracks & and its
propagation.