0% found this document useful (0 votes)
23 views2 pages

Cost Centre Procurement (04.01.2018)

The document discusses issues with a procurement process that allows the selection of different plants than previously entered, including the creation of a purchase requisition where a warning showed the selected plant was irrelevant. It also notes a return purchase order process that should validate the previously selected plant.

Uploaded by

Ajay Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

Cost Centre Procurement (04.01.2018)

The document discusses issues with a procurement process that allows the selection of different plants than previously entered, including the creation of a purchase requisition where a warning showed the selected plant was irrelevant. It also notes a return purchase order process that should validate the previously selected plant.

Uploaded by

Ajay Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Test observations:

Cost Centre Procurement (04.01.2018)


Creation of PR: 2401 was selected as plant but warning shows irrelevant and process allows selection of different plant Cost
center ex. 2101201 selected for plant 2401

Print out: Alignment needs to be checked


Return PO:
Validation required: Return PO Process allows different plant selection process should validate plant
from previous entry.