DETECTIVE EYE
PROJECT REPORT
“DETECTIVE EYE”
BHUBATIA CHOWK
05-05-2019
Executive Summary
This “Detective Eye” is designed to help the people so they could drive smoothly
without any hesitation.This device will enable them to avoid a diverse variety of
obstacles like walls, speed bumps, cars, other human beings or animals in some cases,
list does not end here rather it is so smartly designed that it can also detect pit-holes,
main holes, and diggings so the user could save his life.
One of the main problems observed in Pakistan is, under age driving, where children
drive bikes or cars at high speed and cause potential threat to the person in dark
climate or weather conditions. So our team came with an innovative idea to illuminate
the “Detective Eye” with LEDs using a technological solution that continuously scans
and when dark is detected, precautionary measures are automatically adopted.
We believe, there is always scope for improvement and our product can also be made
better as it offers a wide room for future enhancements and updates.
Problem
Solution
This DE primarily utilizes Ultrasonic and I/R OD sensors to detect obstacles while a
secondary LDR sensor is used to light up “night time warning lights”. The ultrasonic
sensor is purposed to detect standing/moving obstacles like cars and walls at longer
distances and when any object is detected a warning sound is played at buzzer, while
I/R OD is meant to detect holes and diggings right in front of user’s feet and uses
vibration motor along buzzer sound to aware its operator about obstacle.
While LDR that is a light detection sensor, detects dark and used to glow up LEDs so
that a message could be notified to surrounding human beings about presence of user.
This is an Arduino based circuit where code is burnet over Arduino UNO circuit board
that processes inputs and displays output accordingly using output channels those are
interlinked via a solderless breadboard using jumper wires where entire circuit is
located.
Sponsors
Muhammad Umar
Farooq Ather
Hassan
Muhammad Wasif
The DEP roject directly supports several of the corporate goals and objectives
established by the organization.The following table lists the business goals and
objectives that the DE Project supports and how it supports them:
Improve product efficiency This project will improve the efficiency of product
Reduce accident ratio This will save human lives by decreasing accidental ratio
Scope
The following individuals comprise the business case analysis team. They are
responsible for the analysis and creation of the DE Project business case.
Phase I: All components will be purchased for DE system that is require for
vehicle and tested by the IT development group.
Phase III: IT group members will put the DE device into the car.
Phase IV: IT group will check its performance whether it is working well or
not.
Project Description
The DE Project will facilitate the vehicle manufacturing organizations that will install
detective eye (device) into vehciles so that not only they could save human lives but
also may increase its goodwill in the market and this feature will secure the product of
the organization. The DE eye is consisit of ultrasonic sensor, infrared radiation sensor
and LDR.These features are described below;
Ultrasonic Sensor:
I/R Sensor:
LDR:
Schedule/ Time
Project Schedule
The following are the major project milestones identified at this time. As the project
planning moves forward and the schedule is developed, the milestones and their target
completion dates will be modified, adjusted, and finalized as necessary to establish
the baseline schedule.
Closeout/Project 12/05/2019
Cost Occured
The following table captures the cost associated with the DE Project.
ACTIONS DESCRIPTIONS COSTS
Total Rs.113,800
Based on the cost mentioned above we see that by authorizing the DE Project,
organization will bear cost once and get benifit more times.This represents a
significant improvement in our operating costs and is a clear indicator of the benefit
this project will have on the company.
Quality
The following constraints apply to the DE Project. As project planning begins and
more constraints are identified, they will be added accordingly.
Conclusion
Refrence