Enmas Techno-Commercial Offer For 132kV Lukeoil Project (REV 01)
Enmas Techno-Commercial Offer For 132kV Lukeoil Project (REV 01)
Enmas Techno-Commercial Offer For 132kV Lukeoil Project (REV 01)
FOR
Submitted to
INDEX
1.INTRODUCTION
2.SCOPE MATRIX FOR EPC OF
PRODUCTION WELL PADS 11/1A &
ASSOCIATED GATHERING STATION
EXPANSION AT WEST QURNA
CONTRACT AREA
3.CUSTOMER SCOPE OF WORKS
4.TIME SCHEDULE
5.COMMERCIAL OFFER
5.1 Price
5.2 Payment Terms
6.EXCLUSIONS
7. INSPECTION OF MATERIALS
1.0Introduction
This proposal is being prepared for the Design and Supply of materials for EPC of 132 KV
Transmission line 1.25 KM Length, at the production well pads 11/1a & associated gathering station
expansion at West Qurna contract area; based on the mail enquiry and inputs received. The techno
commercial details are based on the certain assumption and any variation required during the
detailed assessment at the time of site visit prior to award shall be quantified; the Purchase order
will be amended accordingly. The brief scope and responsibility is given under.
• All activities related to site installation, site supervision, testing and commissioning.
• Clearance of shipped materials from Umm Qasr Port and delivery to site.
4.0Time Schedule
✓ Proposed time schedule for completion of Design, Engineering and Procurement Supplies
shall be completed in 5 Months.
5.1 Price
S# Description Price in USD
1 Supply of materials as per Annexure B (original quoted price) 440,000.00
2 Design & Detailed Engineering 90,000.00
3 Price for Additional Items as per EPPM email dt: 30.08.2018 66,000.00
(Details see Annex A)
TOTAL AMOUNT (USD) 596,000.00
Special Discount (7%) 41,720.00
TOTAL AMOUNT (USD) AFTER DISCOUNT FOB BASIS 554,280.00
• The prices are based on CIF Umm Qasr, Iraq basis excluding applicable duty, taxes, etc.
prevailing at IRAQ.
• The bills for Supplies shall be submitted once the materials are ready for dispatch. The bill
for Services shall be raised upon completion of each calendar month and submit to MSK
Group by or before 5th of following month.
7. Inspection of Materials
to reduce the levels of inspections to 2 levels i.e. combine inspection 1&2 to Level A and
inspection 3&4 to Level B. This will help to reduce the production and shipping time and
completion of project activities within due time frame with quality products and services as
per project requirements.
We hope to have offered a comprehensive proposal and look forward to receive your valuable
order.
Thanking you;
Description of Country of
S# Manufacturer
Item Origin
1. JAYAM GALVANIZERS PVT LTD
2. SHRI HARI KRISHNA IDNUSTRIES
Tower Steel
1 3. TOWER INDIA ENGINEERS INDIA
Plates
4. SUPREME AND CO PVT LTD
5. ATMASTCO, BHILAI
1.JSK INDUSTRIES PVT LTD INDIA
2.MIDAL CABLES BAHRAIN
2 Conductor
3. HASCELIK KABLO TURKEY
4. EMTA CONDUCTOR TURKEY
1. PRYSMIAN AVL
3 OPGW 2. OMAN CABLE AVL
3. STERLITE TECH INDIA
1. ADINATH INDUSTRIES
4 Insulators 2. PHOENIX ELECTRICAL INDIA
MATERIALS CO. PVT LTD
1. LEGION ENERGY
INDIA
5 Hard ware 2. KRSNA TRANSMISSION
HARDWARE MFG. CO
6 Earth wires AS PER APPROVED VENDORS -
ANNEXURE A
(Additional Items)
OPGW WIRE
Earth PIT
2 DRIVING HEAD ea 27
4 1Cx6 mm² m 68
EARTH BAR
5 BUSBAR INSULATOR ea 51
7 Cable lug ea 60
Lightning
21 Flat saddle ea 25
26 Isolating link ea 7
ANNEXURE B
SUPPLIES
2.1 Tension 20
2.2 Suspension 6
Accessories suitable for 176.9 sq mm ACSR conductor
3
(ostrich)
3.1 Mid Span Joints 6
5 Composite insulator alternates 132kv -Length 1600mm -Creepage distance (min 4526mm) 100
6 Composite insulator alternates 132kv -Length 2300mm -Creepage distance (min 7840mm) 14
13 Earthing Pipes 19