Calculation Reference PDF
Calculation Reference PDF
FUSION
CAPACITY 100.000 MTPY
O
OWNER : PT PUPUK S
SRIWIDJAJA PALEMBANG
G
PROJECT NO : 14-0602/SP038
DOCUMENT NO : NPK-05-A1-CS-401-T
TS‐ENG‐CAL‐CIV‐14‐001‐0030
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
PAGE
1. GENERAL ………..…………………….……………………………………………………………… 1
1.1 OUTLINE OF STRUCTURE …………………………….…………………………………… 1
1.2 DESIGN PHILOSOPHY …………………………….………………………………………… 1
1.2.1 Unit Measurement …………………………….……………………………………… 1
1.2.2 Computer Software Used …………………………….……………………………… 1
1.3 CODE AND STANDARD …………………………….……………………………………… 1
1.4 REFERENCE DOCUMENT …………………………….……………………………………… 1
1.5 MATERIAL PROPERTIES …………………………….……………………………………… 1
1.5.1 CONCRETE MATERIAL …………………………….………………………………… 1
1.5.2 STEEL MATERIAL …………………………….……………………………………… 1
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 1 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
1. GENERAL
This document only covered calculation of pipe rack and pipe stanchion. Upper Structure Calculated by
STAAD Pro, foundation design by AFES. Support reaction take from output STAAD Pro analysis.
ASCE 7-10 Minimum Design Load for Buildings and Others Structures
ASCE 7-05 Ch.6 Requirements Design for Wind Load
AISC 360-10 Spesification for Structural Steel Buildings
ACI 318-08 Building Code Structural Concrete
SNI 1726-2012 Tata cara perencanaan ketahanan gempa untuk struktur bangunan
dan non gedung
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 2 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
2. STRUCTURE LAYOUT
2.1 PIPERACK 1 AND PIPE STANCHION
2.30m
2.20m
6.00m
2.30m
2.50m
1.00m
30.00m
Dimension Layout 6
Y 37 8
X 38
Z 35
29 36
25
27 30 26
21 28
22 47
19 50
33 4546
17 20 34
15 18 43
48
16 3941
13
14 5
11 7
9 12
2 10
4
23
24
31
32
1
3
Y
X Node Number
Z
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 3 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Member WF 400x200x8x13
Member WF 200x100x5.5x8
Member C 100x50x5
Member L 75x75x6
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 4 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Member L80x80x6
Member C 150x75x6.5
67 6
7168
64 69 40
70 46
51 66 65 41
55
48 53 52 43
5449
27 50
31 59
47
24 29 28 60
35 82
25 79
78
21 26 61
7322
18 23
72 463 80
15 20 19 5 75
74
36
12 17 16
3213
934 14
730 11 10
3 8
38
4439
42
56
4557
58
1
62
2
Member Number
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 5 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
2.2 PIPERACK 2
2.90m
2.90m
2.50m
20.00m
1.00m
Dimension Layout
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 6 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
6
8
21
22
19
20
17
18
15 25
16 26
13
14
11
12
9
10
2 5
4 7
23
24
1
3 Node number
Member WF 300x150x6.5x9
Member WF 200x100x5.5x8
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 7 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Member C 100x50x5
Member L 75x75x6
Member L 80x80x6
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 8 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
27 8
47
29 28
24
46 33
26 25 39
21 34
45
23 22
18
44
20 19 35
15
43
17 16
12
42 3
14 13 38
9 4
41
11 10
5
40
7 6
30
37
31
32
1
36
2
Member Number
3. DESIGN LOAD
Pipe Schedule 40
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 9 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
-4.500 kN
-0.600 kN
-0.300 kN
-0.600 kN
-0.300 kN
-4.500 kN
-0.600 kN
-0.300 kN
-0.600 kN
-0.300 kN
-0.600 kN
kN -1.440 kN
-0.300
-0.600 kN
-0.300 kN -0.720
-0.720kN
kN
-0.600 kN
-0.300 kN -1.440 kN
-0.600 kN
-0.300 kN -0.720
-0.600 kN -0.720kN
kN
-0.300 kN
-0.600 kN
-0.300 kN
-0.600
-0
-0.300 kN
300 kN
-0.600 kN
-0.300 kN
-0.600 kN
-0.300 kN
Input Pipe Operating Load P(O) on Piperack 1 and Pipe Stanchion -1.750
1 750 kN
-1.750 kN
-1.750 kN -0.600 kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750
1 750 kN -0.600 kN -0.300
0-0.300
300 kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-0.600 kN -0.300
-0.300kN
kN
-0.600 kN -0.300
-0.300kN
kN
-0.300
-0.300kN
kN
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 10 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
0.090kN
0.180 kN
0.090kN
0.180 kN
0.090 kN
0.180 kN
0.090kN
0.180 kN
0.090kN
0.180 kN
0.090kN
0.180 kN
0.216
0.432 kN kN
0.216 kN
0.090kN
0.180 kN
0.090 kN
0.180 kN 1.260 kN
0.090kN
0.180 kN 0.216
0.432 kN kN
0.216 kN
0.090kN
0.180 kN
0.090 kN 1.260 kN
0.180 kN
0.090kN
0.180 kN
0.090kN
0.180 kN
0.090
0.180 kN kN
0.090 kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525 kN
0.090 kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525 kN
0.090 kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.525 kN
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 11 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Wind load calculation refers to ASCE 7-05, American Society of Civil Engineers.
Calculate Wind pressure, F, on each structure surface :
F = qz.G.Cf.Af
Where:
qz = the velocity pressure evaluated at height z (defined in sect. 29-3) of the centroid
of area Af.
G = gust effect factor from ASCE-7-05 Section 26.9
Cf = force coefficient from Fig. 29.5-1 through 29.5-3
Af = projected area normal to the wind except where Cf is specified for the actual
surface area, (m2)
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 12 of 23 '
0.065
0.163 kN/m
kN/m
0.062
0.163 kN/mkN/m
0.163 kN/m
0.055
0.156 kN/m
kN/m
0.1470.059
kN/mkN/m
0.156
0.147 kN/m
kN/m
0.055
0.059 kN/m 0.110 kN/m
0.110kN/m
0.110 kN/m
0.147 kN/m
0.147 kN/m
0.110 kN/m
0.110kN/m
0.110 kN/m
0.147 kN/m
0.147 kN/m
0.065
0.163 kN/m
kN/m
0.062
0.163 kN/mkN/m
0.163 kN/m
0.055
0.156 kN/m
kN/m
0.1470.059
kN/mkN/m
0.156
0.147 kN/m
kN/m
0.055
0.059
0.147 kN/m
kN/m
0.147 kN/m
0.147 kN/m
0.147 kN/m
0.294 kN/m
0.294 kN/m
0.294 kN/m
0.294 kN/m
0.117 kN/mkN/m
0.062
0.117 kN/m
0.055
0.110 kN/m
kN/m
0.059
0.110 kN/m
kN/m
0.059
0.110 kN/m
kN/m
0.156 kN/m
0.110 kN/m
0.1170.062
kN/mkN/m
0.117 kN/m
0.055 kN/m
Input Wind Load dir-X (WX) on Piperack 2
0.110 kN/m 0.234 kN/m
0.059
0.110 kN/m
kN/m 0.234 kN/m
0.234 kN/m
0.234
0 234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m 0.220 kN/m
0.059 kN/m 0.234 kN/m 0.220 kN/m
0.110 kN/m 0.234 kN/m
0.110 kN/m 0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m 0.220 kN/m
0.234 kN/m 0.220 kN/m
0.234 kN/m
0 234 kN/m
0.234
0.220 kN/m
0.220 kN/m
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 13 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Seismic load this structure is calculated based on SNI 1726-2012 and "Peta Hazard Gempa
Indonesia 2011" Ministry of Public Work.
Location : Palembang
Latitude : -2.97270894229815
Longitude : 104.809367716661
V = Cs . W
SDS . I
Cs =
R
Cs Max = SD1 . I
T.R
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 14 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 15 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
0.970 kN
1.150 kN
0.980 kN
0.980 kN
0.970 kN
1.150 kN
Y
X
Z
Input Seismic Load dir-X (VX) on Piperack 1 and Pipe Stanchion
0.970
1.150 kN
kN
0.980 kN
0.980 kN
0.970
1.150 kN
kN
Y
X
Z Input Seismic Load dir-Z (VZ) on Piperack 1 and Pipe Stanchion
-0.970 kNkN
-1.150
-0.980 kN
-0.980 kN
-0.970 kNkN
-1.150
Y
X
Z Input Seismic Load dir-Y (VY) on Piperack 1 and Pipe Stanchion
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 16 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 17 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
0.800 kN
0.820 kN
0.800 kN
0.820 kN
0.800
0 800 kN
0.820 kN
Input Seismic Load dir-X (VX) on Piperack 2
0.800 kN
0.820 kN
-0.800 kN
-0.820 kN
Input Seismic Load dir-Z (VZ) on Piperack 2
-0.800 kN
-0.820 kN
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 18 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
LOAD COMB 111 1.4 (D + P(O) + TF)
LOAD COMB 112 1.2 (D + P(O) + TF)+ 1.6 L
LOAD COMB 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L
LOAD COMB 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L
LOAD COMB 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L
LOAD COMB 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L
LOAD COMB 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L
LOAD COMB 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L
LOAD COMB 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L
LOAD COMB 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L
LOAD COMB 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L
LOAD COMB 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L
LOAD COMB 123 0.9 (D + P(O) + TF)+ 1.6 WX
LOAD COMB 124 0.9 (D + P(O) + TF)+ 1.6 WZ
LOAD COMB 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ
LOAD COMB 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ
LOAD COMB 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ
LOAD COMB 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ
LOAD COMB 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX
LOAD COMB 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX
LOAD COMB 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX
LOAD COMB 132 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX
LOAD COMB 211 (D + P(O) + TF)
LOAD COMB 212 (D + P(O) + TF)+ L
LOAD COMB 213 (D + P(O) + TF)+ WX
LOAD COMB 214 (D + P(O) + TF)+ WZ
LOAD COMB 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
LOAD COMB 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
LOAD COMB 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
LOAD COMB 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
LOAD COMB 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
LOAD COMB 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
LOAD COMB 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
LOAD COMB 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
LOAD COMB 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L
LOAD COMB 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L
LOAD COMB 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 L
LOAD COMB 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 L
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 19 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
LOAD COMB 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 L
LOAD COMB 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75 L
LOAD COMB 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 L
LOAD COMB 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 L
LOAD COMB 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 L
LOAD COMB 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75 L
LOAD COMB 233 0.6 (D + P(O) + TF)+ WX
LOAD COMB 234 0.6 (D + P(O) + TF)+ WZ
LOAD COMB 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
LOAD COMB 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
LOAD COMB 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
LOAD COMB 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
LOAD COMB 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
LOAD COMB 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
LOAD COMB 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
LOAD COMB 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
Notes :
D = Dead Load
L = Live Load
WX = Wind Load Dir-X
WZ = Wind Load Dir-Z
VX = Horizontal Seismic Load Dir-X
VY = Vertical Seismic Load Dir-Y
VZ = Horizontal Seismic Load Dir-Z
P(O) = Pipe Operating Load
TF = Thermal Friction Load
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 20 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
4. ANALYSIS RESULT
Di
joint-i
H / D ≥ 200, so :
D2
joint-2
● Hi / Di ≥ 200
D1
joint-1 ● H2 / D2 ≥ 200
Hi
● H1 / D1 ≥ 200
H2
H1
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 21 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Di
joint-i
H / D ≥ 200, so :
D2
joint-2
● Hi / Di ≥ 200
D1
joint-1 ● H2 / D2 ≥ 200
Hi
● H1 / D1 ≥ 200
H2
H1
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 22 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
5. DESIGN FOUNDATION
Soil bearing capacity calculated based on laboratory test table soil Bore Hole 3 (B-3)
Where :
2 2
C = Soil Cohesion = 0.27 kg/cm = 2.7 ton/m
3
ɣb = Specific Grafity of Soil = 1.62 t/m
Df = Depth of Foundation = 2m
B = Width of Foundation = 1m = 1m
φ = Shear Internal Degree = 1.7 o
Nc, Nq, Nɣ = Terzaghi factor based on Shear Internal Degree
2
Use qult minimum = 20.04 ton/m
qult 20.04
qa = = = 6.68 ton/m2
SF 3
TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 23 of 23 '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP
Calculation of foundation will be provide by AFES. For Further detail calculation please see attachment 3
TS‐ENG‐CAL‐CIV‐14‐001‐0030
ATTACHMENT - 1
INPUT STAAD PRO
Input Staad Pro Piperack 1 and Pipe Stanchion Input Staad Pro Piperack 1 and Pipe Stanchion
STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
ENGINEER DATE 24‐Nov‐14 74 75 78 TO 80 82 TABLE ST C150X75X6.5
END JOB INFORMATION CONSTANTS
INPUT WIDTH 79 BETA 90 MEMB 74 78
UNIT METER KN MATERIAL STEEL ALL
JOINT COORDINATES DEFINE WIND LOAD
1 0 0 0; 2 0 6.8 0; 3 0 0 1; 4 0 6.8 1; 5 30 0 0; 6 30 6.8 0; 7 30 0 1; TYPE 1
8 30 6.8 1; 9 2.5 6.8 0; 10 2.5 6.8 1; 11 5 6.8 0; 12 5 6.8 1; 13 7.5 6.8 0; INT 0.734 0.78 0.817 0.849 0.902 0.946 0.983 1.015 1.044 1.07 HEIG 4.6 6.1 ‐
14 7.5 6.8 1; 15 10 6.8 0; 16 10 6.8 1; 17 12.5 6.8 0; 18 12.5 6.8 1; 7.6 9.1 12.2 15.2 18 21.3 24.4 27.4
19 15 6.8 0; 20 15 6.8 1; 21 17.5 6.8 0; 22 17.5 6.8 1; 23 0 4.5 0; 24 0 4.5 1; EXP 1 JOINT 1 TO 26 31 TO 34 39 41 43 45 TO 47
25 30 4.5 0; 26 30 4.5 1; 27 20 6.8 0; 28 20 6.8 1; 29 22.5 6.8 0; LOAD 1 DEAD LOAD (D)
30 22.5 6.8 1; 31 0 2.3 0; 32 0 2.3 1; 33 30 2.3 0; 34 30 2.3 1; 35 25 6.8 0; SELFWEIGHT Y ‐1 LIST 1 TO 32 34 TO 36 38 TO 75 78 79
36 25 6.8 1; 37 27.5 6.8 0; 38 27.5 6.8 1; 39 33 0 0.5; 41 33 0.3 1; LOAD 2 LIVE LOAD (L)
43 33 0.3 0; 45 39 0 0.5; 46 39 0.3 1; 47 39 0.3 0; 48 33 0.3 0.5; LOAD 3 WIND LOAD (WX)
50 39 0.3 0.5; WIND LOAD X 1 TYPE 1 XR 0 0 YR 0 6.8 ZR 0 1 OPEN
MEMBER INCIDENCES WIND LOAD X 1 TYPE 1 XR 30 30 YR 0 6.8 ZR 0 1 OPEN
1 1 31; 2 3 32; 3 2 4; 4 5 33; 5 7 34; 6 6 8; 7 2 9; 8 4 10; 9 9 11; 10 10 12; WIND LOAD X 1 TYPE 1 XR 33 33 YR 0 0.3 ZR 0 1 OPEN
11 9 10; 12 11 13; 13 12 14; 14 11 12; 15 13 15; 16 14 16; 17 13 14; 18 15 17; WIND LOAD X 1 TYPE 1 XR 39 39 YR 0 0.3 ZR 0 1 OPEN
19 16 18; 20 15 16; 21 17 19; 22 18 20; 23 17 18; 24 19 21; 25 20 22; 26 19 20; LOAD 4 WIND LOAD (WZ)
27 21 27; 28 22 28; 29 21 22; 30 2 10; 31 27 22; 32 11 14; 34 9 12; 35 21 20; WIND LOAD Z 1 TYPE 1 XR 0 30 YR 0 6.8 ZR 0 0 OPEN
36 13 16; 38 23 2; 39 24 4; 40 25 6; 41 26 8; 42 23 24; 43 25 26; 44 2 24; WIND LOAD Z 1 TYPE 1 XR 0 30 YR 0 6.8 ZR 1 1 OPEN
45 24 31; 46 6 26; 47 26 33; 48 27 29; 49 28 30; 50 27 28; 51 29 35; 52 30 36; WIND LOAD Z 1 TYPE 1 XR 30 39 YR 0 0.5 ZR 0.5 0.5 OPEN
53 29 30; 54 29 28; 55 35 30; 56 31 23; 57 32 24; 58 31 32; 59 33 25; 60 34 26; LOAD 5 SEISMIC LOAD (VX)
61 33 34; 62 31 3; 63 33 7; 64 35 37; 65 36 38; 66 35 36; 67 37 6; 68 38 8; JOINT LOAD
69 37 38; 70 37 36; 71 6 38; 72 15 18; 73 17 20; 74 39 48; 75 41 48; 78 45 50; *100% X‐Dir
79 46 50; 80 48 43; 82 50 47; *EL + 7.000
SUPPORTS 2 FX 0.97
1 3 5 7 PINNED 4 FX 1.15
39 45 FIXED 6 FX 0.97
MEMBER RELEASE 8 FX 1.15
3 6 11 14 17 20 23 26 29 42 43 50 53 58 61 66 69 START MY MZ 48 50 FX 0.98
3 6 11 14 17 20 23 26 29 42 43 50 53 58 61 66 69 END MY MZ LOAD 6 SEISMIC LOAD (VZ)
MEMBER TRUSS JOINT LOAD
30 TO 32 34 TO 36 44 TO 47 54 55 62 63 70 TO 73 *100% Z‐Dir
DEFINE MATERIAL START *EL + 7.000
ISOTROPIC STEEL 2 FZ 0.97
E 2.05e+008 4 FZ 1.15
POISSON 0.3 6 FZ 0.97
DENSITY 76.8195 8 FZ 1.15
ALPHA 1.2e‐005 48 50 FZ 0.98
DAMP 0.03 LOAD 7 SEISMIC LOAD (VY)
END DEFINE MATERIAL JOINT LOAD
MEMBER PROPERTY JAPANESE *100% Y‐Dir
11 14 17 20 23 26 29 50 53 66 69 TABLE ST C100X50X5 *EL + 7.000
3 6 TABLE ST H200X100X5.5 2 FY ‐0.97
30 TO 32 34 TO 36 42 43 54 55 58 61 70 TO 73 TABLE ST L75X75X6 4 FY ‐1.15
7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 67 ‐ 6 FY ‐0.97
68 TABLE ST H400X200X8 8 FY ‐1.15
1 2 4 5 38 TO 41 56 57 59 60 TABLE ST H400X200X8 48 50 FY ‐0.98
44 TO 47 62 63 TABLE ST L80X80X6 LOAD 8 PIPING OPERATING P(O)
Input Staad Pro Piperack 1 and Pipe Stanchion Input Staad Pro Piperack 1 and Pipe Stanchion
STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
MEMBER LOAD 1 0.9 8 0.9 9 0.9 3 1.6
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GY ‐0.3 0.6 LOAD COMB 124 0.9 (D + P(O) + TF)+ 1.6 WZ
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GY ‐0.6 0.8 1 0.9 8 0.9 9 0.9 4 1.6
75 79 CON GY ‐0.72 0.2 LOAD COMB 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ
75 79 CON GY ‐4.5 0.4 1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 0.3
82 CON GY ‐0.72 0.1 LOAD COMB 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ
80 CON GY ‐0.72 0.1 1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 ‐0.3
82 CON GY ‐1.44 0.3 LOAD COMB 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ
80 CON GY ‐1.44 0.3 1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 0.3
LOAD 9 THERMAL LOAD (TF) LOAD COMB 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ
MEMBER LOAD 1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 ‐0.3
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GX 0.09 0.6 LOAD COMB 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GX 0.18 0.8 1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 0.3
75 79 CON GX 0.216 0.2 LOAD COMB 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX
75 79 CON GX 1.26 0.4 1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 ‐0.3
82 CON GX 0.216 0.1 LOAD COMB 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX
80 CON GX 0.216 0.1 1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 0.3
82 CON GX 0.432 0.3 LOAD COMB 132 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX
80 CON GX 0.432 0.3 1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 ‐0.3
******************** ********************
**LOAD COMBINATION** *UNFACTORED LOAD COMBINATION*
******************** ********************
*FACTORED LOAD COMBINATION* LOAD COMB 211 (D + P(O) + TF)
******************** 1 1.0 8 1.0 9 1.0
LOAD COMB 111 1.4 (D + P(O) + TF) LOAD COMB 212 (D + P(O) + TF)+ L
1 1.4 8 1.4 9 1.4 1 1.0 8 1.0 9 1.0 2 1.0
LOAD COMB 112 1.2 (D + P(O) + TF)+ 1.6 L LOAD COMB 213 (D + P(O) + TF)+ WX
1 1.2 8 1.2 9 1.2 2 1.6 1 1.0 8 1.0 9 1.0 3 1.0
LOAD COMB 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L LOAD COMB 214 (D + P(O) + TF)+ WZ
1 1.2 8 1.2 9 1.2 3 1.6 2 1.0 1 1.0 8 1.0 9 1.0 4 1.0
LOAD COMB 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L LOAD COMB 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 4 1.6 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 0.21
LOAD COMB 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 ‐0.21
LOAD COMB 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 0.21
LOAD COMB 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 ‐0.21
LOAD COMB 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 0.21
LOAD COMB 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 ‐0.21
LOAD COMB 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 0.21
LOAD COMB 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 ‐0.21
LOAD COMB 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 3 0.75 2 0.75
LOAD COMB 123 0.9 (D + P(O) + TF)+ 1.6 WX LOAD COMB 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L
Input Staad Pro Piperack 1 and Pipe Stanchion Input Staad Pro Piperack 1 and Pipe Stanchion
STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
1 1.0 8 1.0 9 1.0 4 0.75 2 0.75 KZ 2 MEMB 1 2 4 5 38 TO 41 56 57 59 60
LOAD COMB 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 L LOAD LIST 111 TO 132
1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 0.1575 2 0.75 CHECK CODE ALL
LOAD COMB 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 L STEEL MEMBER TAKE OFF LIST 1 TO 32 34 TO 36 38 TO 75 78 TO 80 82
1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 ‐0.1575 2 0.75 PARAMETER 2
LOAD COMB 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 L CODE AISC UNIFIED
1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 0.1575 2 0.75 DJ1 2 MEMB 7 9 12 15 18 21 24 27 48 51 64 67
LOAD COMB 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75 L DJ2 6 MEMB 7 9 12 15 18 21 24 27 48 51 64 67
1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 ‐0.1575 2 0.75 DJ1 4 MEMB 8 10 13 16 19 22 25 28 49 52 65 68
LOAD COMB 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 L DJ2 8 MEMB 8 10 13 16 19 22 25 28 49 52 65 68
1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 0.1575 2 0.75 CAN 0 MEMB 7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 67 68
LOAD COMB 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 L DFF 240 MEMB 7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 ‐
1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 ‐0.1575 2 0.75 67 68
LOAD COMB 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 L DJ1 1 MEMB 1 38 56
1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 0.1575 2 0.75 DJ1 2 MEMB 1 38 56
LOAD COMB 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75 L DJ2 3 MEMB 2 39 57
1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 ‐0.1575 2 0.75 DJ1 4 MEMB 2 39 57
LOAD COMB 233 0.6 (D + P(O) + TF)+ WX DJ2 5 MEMB 4 40 59
1 0.6 8 0.6 9 0.6 3 1.0 DJ1 6 MEMB 4 40 59
LOAD COMB 234 0.6 (D + P(O) + TF)+ WZ DJ2 7 MEMB 5 41 60
1 0.6 8 0.6 9 0.64 1 DJ1 8 MEMB 5 41 60
LOAD COMB 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ CAN 1 MEMB 1 2 4 5 38 TO 41 56 57 59 60
1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 0.21 DFF 200 MEMB 1 2 4 5 38 TO 41 56 57 59 60
LOAD COMB 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ LOAD LIST 211 TO 242
1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 ‐0.21 FINISH
LOAD COMB 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 0.21
LOAD COMB 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 ‐0.21
LOAD COMB 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 0.21
LOAD COMB 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 ‐0.21
LOAD COMB 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 0.21
LOAD COMB 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 ‐0.21
******* FOR SEISMIC ******
LOAD COMB 1000 (D + P(O) + TF)+ 0.25 L
1 1.0 8 1.0 9 1.0 2 0.25
PERFORM ANALYSIS
PARAMETER 1
CODE AISC UNIFIED
METHOD LRFD
FYLD 250000 ALL
FU 410000 ALL
RATIO 1 ALL
LZ 30 MEMB 7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 67 68
KY 2 MEMB 1 2 4 5 38 TO 41 56 57 59 60
Input Staad Pro Piperack 2 Input Staad Pro Piperack 2
STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
ENGINEER DATE 04‐Dec‐14 LOAD 3 WIND LOAD (WX)
END JOB INFORMATION WIND LOAD X 1 TYPE 1 XR 0 0 YR 0 5.8 ZR 0 1 OPEN
INPUT WIDTH 79 WIND LOAD X 1 TYPE 1 XR 20 20 YR 0 5.8 ZR 0 1 OPEN
UNIT METER KN LOAD 4 WIND LOAD (WZ)
JOINT COORDINATES WIND LOAD Z 1 TYPE 1 XR 0 20 YR 0 5.8 ZR 0 0 OPEN
1 0 0 0; 2 0 5.8 0; 3 0 0 1; 4 0 5.8 1; 5 20 0 0; 6 20 5.8 0; 7 20 0 1; WIND LOAD Z 1 TYPE 1 XR 0 20 YR 0 5.8 ZR 1 1 OPEN
8 20 5.8 1; 9 2.5 5.8 0; 10 2.5 5.8 1; 11 5 5.8 0; 12 5 5.8 1; 13 7.5 5.8 0; LOAD 5 SEISMIC LOAD (VX)
14 7.5 5.8 1; 15 10 5.8 0; 16 10 5.8 1; 17 12.5 5.8 0; 18 12.5 5.8 1; JOINT LOAD
19 15 5.8 0; 20 15 5.8 1; 21 17.5 5.8 0; 22 17.5 5.8 1; 23 0 2.9 0; 24 0 2.9 1; *100% X‐Dir
25 20 2.9 0; 26 20 2.9 1; *EL + 6.000
MEMBER INCIDENCES 2 FX 0.8
1 1 23; 2 3 24; 3 5 25; 4 7 26; 5 2 9; 6 4 10; 7 2 4; 8 6 8; 9 9 11; 10 10 12; 4 FX 0.82
11 9 10; 12 11 13; 13 12 14; 14 11 12; 15 13 15; 16 14 16; 17 13 14; 18 15 17; 6 FX 0.8
19 16 18; 20 15 16; 21 17 19; 22 18 20; 23 17 18; 24 19 21; 25 20 22; 26 19 20; 8 FX 0.82
27 21 6; 28 22 8; 29 21 22; 30 23 2; 31 24 4; 32 23 24; 33 25 6; 34 26 8; LOAD 6 SEISMIC LOAD (VZ)
35 25 26; 36 1 24; 37 24 2; 38 5 26; 39 26 6; 40 2 10; 41 9 12; 42 11 14; JOINT LOAD
43 13 16; 44 16 17; 45 18 19; 46 20 21; 47 22 6; *100% Z‐Dir
SUPPORTS *EL + 6.000
1 3 5 7 PINNED 2 FZ 0.8
MEMBER RELEASE 4 FZ 0.82
7 8 11 14 17 20 23 26 29 START MY MZ 6 FZ 0.8
7 8 11 14 17 20 23 26 29 END MY MZ 8 FZ 0.82
MEMBER TRUSS LOAD 7 SEISMIC LOAD (VY)
32 35 TO 47 JOINT LOAD
DEFINE MATERIAL START *100% Y‐Dir
ISOTROPIC STEEL *EL + 6.000
E 2.05e+008 2 FY ‐0.8
POISSON 0.3 4 FY ‐0.82
DENSITY 76.8195 6 FY ‐0.8
ALPHA 1.2e‐005 8 FY ‐0.82
DAMP 0.03 LOAD 8 PIPING OPERATING P(O)
END DEFINE MATERIAL MEMBER LOAD
MEMBER PROPERTY JAPANESE 7 8 11 14 17 20 23 26 29 CON GY ‐0.6 0.2
1 TO 4 30 31 33 34 TABLE ST H300X150X6.5 7 8 11 14 17 20 23 26 29 CON GY ‐0.3 0.4
5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28 TABLE ST H300X150X6.5 7 8 11 14 17 20 23 26 29 CON GY ‐1.75 0.6
7 8 TABLE ST H200X100X5.5 7 8 11 14 17 20 23 26 29 CON GY ‐0.3 0.8
11 14 17 20 23 26 29 TABLE ST C100X50X5 LOAD 9 THERMAL LOAD (TF)
32 35 40 TO 47 TABLE ST L75X75X6 MEMBER LOAD
36 TO 39 TABLE ST L80X80X6 7 8 11 14 17 20 23 26 29 CON GX 0.18 0.2
CONSTANTS 7 8 11 14 17 20 23 26 29 CON GX 0.09 0.4
MATERIAL STEEL ALL 7 8 11 14 17 20 23 26 29 CON GX 0.525 0.6
DEFINE WIND LOAD 7 8 11 14 17 20 23 26 29 CON GX 0.09 0.8
TYPE 1 ********************
INT 0.734 0.78 0.817 0.849 0.902 0.946 0.983 1.015 1.044 1.07 HEIG 4.6 6.1 ‐ **LOAD COMBINATION**
7.6 9.1 12.2 15.2 18 21.3 24.4 27.4 ********************
EXP 1 JOINT 1 TO 26 *FACTORED LOAD COMBINATION*
LOAD 1 DEAD LOAD (D) ********************
SELFWEIGHT Y ‐1 LIST 1 TO 47 LOAD COMB 111 1.4 (D + P(O) + TF)
LOAD 2 LIVE LOAD (L) 1 1.4 8 1.4 9 1.4
Input Staad Pro Piperack 2 Input Staad Pro Piperack 2
STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
LOAD COMB 112 1.2 (D + P(O) + TF)+ 1.6 L LOAD COMB 213 (D + P(O) + TF)+ WX
1 1.2 8 1.2 9 1.2 2 1.6 1 1.0 8 1.0 9 1.0 3 1.0
LOAD COMB 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L LOAD COMB 214 (D + P(O) + TF)+ WZ
1 1.2 8 1.2 9 1.2 3 1.6 2 1.0 1 1.0 8 1.0 9 1.0 4 1.0
LOAD COMB 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L LOAD COMB 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 4 1.6 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 0.21
LOAD COMB 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 ‐0.21
LOAD COMB 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 0.21
LOAD COMB 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 ‐0.21
LOAD COMB 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 0.21
LOAD COMB 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 ‐0.21
LOAD COMB 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 0.21
LOAD COMB 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 0.3 2 1.0 1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 ‐0.21
LOAD COMB 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 ‐0.3 2 1.0 1 1.0 8 1.0 9 1.0 3 0.75 2 0.75
LOAD COMB 123 0.9 (D + P(O) + TF)+ 1.6 WX LOAD COMB 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L
1 0.9 8 0.9 9 0.9 3 1.6 1 1.0 8 1.0 9 1.0 4 0.75 2 0.75
LOAD COMB 124 0.9 (D + P(O) + TF)+ 1.6 WZ LOAD COMB 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 4 1.6 1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 0.1575 2 0.75
LOAD COMB 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ LOAD COMB 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 0.3 1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 ‐0.1575 2 0.75
LOAD COMB 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ LOAD COMB 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 ‐0.3 1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 0.1575 2 0.75
LOAD COMB 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ LOAD COMB 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 0.3 1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 ‐0.1575 2 0.75
LOAD COMB 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ LOAD COMB 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 ‐0.3 1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 0.1575 2 0.75
LOAD COMB 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX LOAD COMB 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 0.3 1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 ‐0.1575 2 0.75
LOAD COMB 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX LOAD COMB 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 ‐0.3 1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 0.1575 2 0.75
LOAD COMB 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX LOAD COMB 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 0.3 1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 ‐0.1575 2 0.75
LOAD COMB 132 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX LOAD COMB 233 0.6 (D + P(O) + TF)+ WX
1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 ‐0.3 1 0.6 8 0.6 9 0.6 3 1.0
******************** LOAD COMB 234 0.6 (D + P(O) + TF)+ WZ
*UNFACTORED LOAD COMBINATION* 1 0.6 8 0.6 9 0.64 1
******************** LOAD COMB 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
LOAD COMB 211 (D + P(O) + TF) 1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 0.21
1 1.0 8 1.0 9 1.0 LOAD COMB 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
LOAD COMB 212 (D + P(O) + TF)+ L 1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 ‐0.21
1 1.0 8 1.0 9 1.0 2 1.0 LOAD COMB 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
Input Staad Pro Piperack 2
STAAD SPACE
START JOB INFORMATION
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 0.21
LOAD COMB 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 ‐0.21
LOAD COMB 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 0.21
LOAD COMB 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 ‐0.21
LOAD COMB 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 0.21
LOAD COMB 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 ‐0.21
******* FOR SEISMIC ******
LOAD COMB 1000 (D + P(O) + TF)+ 0.25 L
1 1.0 8 1.0 9 1.0 2 0.25
PERFORM ANALYSIS
PARAMETER 1
CODE AISC UNIFIED
METHOD LRFD
FYLD 250000 ALL
FU 410000 ALL
RATIO 1 ALL
LZ 20 MEMB 5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28
KY 2 MEMB 1 TO 4 30 31 33 34
KZ 2 MEMB 1 TO 4 30 31 33 34
LOAD LIST 111 TO 132
CHECK CODE ALL
STEEL MEMBER TAKE OFF LIST 1 TO 35
PARAMETER 2
CODE AISC UNIFIED
DJ1 2 MEMB 5 9 12 15 18 21 24 27
DJ2 6 MEMB 5 9 12 15 18 21 24 27
DJ1 4 MEMB 6 10 13 16 19 22 25 28
DJ2 8 MEMB 6 10 13 16 19 22 25 28
CAN 0 MEMB 5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28
DFF 240 MEMB 5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28
DJ1 1 MEMB 1 30
DJ1 2 MEMB 1 30
DJ2 3 MEMB 2 31
DJ1 4 MEMB 2 31
DJ2 5 MEMB 3 33
DJ1 6 MEMB 3 33
DJ2 7 MEMB 4 34
DJ1 8 MEMB 4 34
CAN 1 MEMB 1 TO 4 30 31 33 34
DFF 200 MEMB 1 TO 4 30 31 33 34
LOAD LIST 211 TO 242
FINISH
ATTACHMENT - 2
STEEL MEMBER OUTPUT
Steel Member Output Piperack 1 and Pipe Stanchion
Member
Member Name Ratio Clause LC
Number
1 H400X200X8 0.1 Clause H1/2 114
2 H400X200X8 0.133 Clause H1/2 114
3 H200X100X5.5 0.013 Clause H1/2 113
4 H400X200X8 0.117 Clause H1/2 114
5 H400X200X8 0.15 Clause H1/2 114
6 H200X100X5.5 0.013 Clause H1/2 113
7 H400X200X8 0.24 Clause H1/2 114
8 H400X200X8 0.288 Clause H1/2 111
9 H400X200X8 0.18 Clause E 114
10 H400X200X8 0.135 Clause H1/2 117
11 C100X50X5 0.068 Clause H1/2 114
12 H400X200X8 0.309 Clause H1/2 114
13 H400X200X8 0.12 Clause H1/2 111
14 C100X50X5 0.062 Clause H1/2 114
15 H400X200X8 0.391 Clause H1/2 114
16 H400X200X8 0.189 Clause H1/2 111
17 C100X50X5 0.055 Clause H1/2 114
18 H400X200X8 0.44 Clause H1/2 114
19 H400X200X8 0.228 Clause H1/2 111
20 C100X50X5 0.049 Clause H1/2 114
21 H400X200X8 0.459 Clause H1/2 114
22 H400X200X8 0.24 Clause H1/2 111
23 C100X50X5 0.043 Clause H1/2 114
24 H400X200X8 0.457 Clause H1/2 114
25 H400X200X8 0.24 Clause H1/2 111
26 C100X50X5 0.043 Clause H1/2 111
27 H400X200X8 0.433 Clause H1/2 114
28 H400X200X8 0.219 Clause H1/2 111
29 C100X50X5 0.043 Clause H1/2 111
30 L75X75X6 0.198 Clause D2 114
31 L75X75X6 0.053 Clause D2 124
32 L75X75X6 0.125 Clause D2 114
34 L75X75X6 0.16 Clause D2 114
35 L75X75X6 0.017 Clause D2 124
36 L75X75X6 0.089 Clause D2 114
38 H400X200X8 0.222 Clause H1/2 111
39 H400X200X8 0.278 Clause H1/2 111
40 H400X200X8 0.279 Clause H1/2 111
41 H400X200X8 0.336 Clause H1/2 111
42 L75X75X6 0.011 Clause H1/2 114
43 L75X75X6 0.011 Clause H1/2 114
44 L80X80X6 0.727 Clause E 114
45 L80X80X6 0.218 Clause D2 124
46 L80X80X6 0.725 Clause E 114
47 L80X80X6 0.217 Clause D2 124
48 H400X200X8 0.379 Clause H1/2 114
49 H400X200X8 0.171 Clause H1/2 111
50 C100X50X5 0.049 Clause H1/2 114
51 H400X200X8 0.289 Clause H1/2 114
52 H400X200X8 0.093 Clause H1/2 111
53 C100X50X5 0.055 Clause H1/2 114
Steel Member Output Piperack 1 and Pipe Stanchion
Member
Member Name Ratio Clause LC
Number
54 L75X75X6 0.089 Clause D2 124
55 L75X75X6 0.124 Clause D2 124
56 H400X200X8 0.152 Clause H1/2 111
57 H400X200X8 0.2 Clause H1/2 114
58 L75X75X6 0.012 Clause H1/2 114
59 H400X200X8 0.19 Clause H1/2 111
60 H400X200X8 0.233 Clause H1/2 114
61 L75X75X6 0.012 Clause H1/2 114
62 L80X80X6 0.943 Clause E 114
63 L80X80X6 0.94 Clause E 114
64 H400X200X8 0.211 Clause H1/2 114
65 H400X200X8 0.183 Clause H1/2 111
66 C100X50X5 0.061 Clause H1/2 114
67 H400X200X8 0.292 Clause H1/2 114
68 H400X200X8 0.348 Clause H1/2 111
69 C100X50X5 0.068 Clause H1/2 114
70 L75X75X6 0.159 Clause D2 124
71 L75X75X6 0.197 Clause D2 124
72 L75X75X6 0.054 Clause D2 114
73 L75X75X6 0.018 Clause D2 124
74 C150X75X6.5 0.146 Clause H1/2 115
78 C150X75X6.5 0.146 Clause H1/2 115
75 C150X75X6.5 0.064 Clause H1/2 111
79 C150X75X6.5 0.064 Clause H1/2 111
80 C150X75X6.5 0.049 Clause H1/2 111
82 C150X75X6.5 0.049 Clause H1/2 111
Steel Member Output Piperack 2
Member
Member Name Ratio Clause LC
Number
1 H350X175X7 0.092 Clause H1/2 118
2 H350X175X7 0.161 Clause E 114
3 H350X175X7 0.183 Clause H1/2 111
4 H350X175X7 0.234 Clause H1/2 114
5 H300X150X6.5 0.243 Clause H1/2 117
6 H300X150X6.5 0.262 Clause H1/2 117
7 H200X100X5.5 0.042 Clause H1/2 111
8 H200X100X5.5 0.042 Clause H1/2 111
9 H300X150X6.5 0.208 Clause H1/2 114
10 H300X150X6.5 0.185 Clause H1/2 111
11 C100X50X5 0.162 Clause H1/2 111
12 H300X150X6.5 0.29 Clause H1/2 114
13 H300X150X6.5 0.273 Clause H1/2 111
14 C100X50X5 0.162 Clause H1/2 111
15 H300X150X6.5 0.303 Clause H1/2 114
16 H300X150X6.5 0.282 Clause H1/2 111
17 C100X50X5 0.162 Clause H1/2 111
18 H300X150X6.5 0.295 Clause H1/2 114
19 H300X150X6.5 0.282 Clause H1/2 111
20 C100X50X5 0.162 Clause H1/2 111
21 H300X150X6.5 0.229 Clause H1/2 114
22 H300X150X6.5 0.203 Clause H1/2 111
23 C100X50X5 0.162 Clause H1/2 111
24 H300X150X6.5 0.249 Clause H1/2 114
25 H300X150X6.5 0.235 Clause H1/2 113
26 C100X50X5 0.162 Clause H1/2 111
27 H300X150X6.5 0.536 Clause H1/2 111
28 H300X150X6.5 0.558 Clause H1/2 111
29 C100X50X5 0.162 Clause H1/2 111
30 H350X175X7 0.161 Clause H1/2 118
31 H350X175X7 0.172 Clause H1/2 117
32 L75X75X6 0.009 Clause E 124
33 H350X175X7 0.34 Clause H1/2 111
34 H350X175X7 0.355 Clause H1/2 111
35 L75X75X6 0.009 Clause E 124
36 L80X80X6 0.167 Clause D2 114
37 L80X80X6 0.68 Clause E 114
38 L80X80X6 0.166 Clause D2 124
39 L80X80X6 0.68 Clause E 114
40 L75X75X6 0.092 Clause D2 114
41 L75X75X6 0.063 Clause D2 114
42 L75X75X6 0.039 Clause D2 114
43 L75X75X6 0.013 Clause D2 124
44 L75X75X6 0.012 Clause D2 124
45 L75X75X6 0.038 Clause D2 124
46 L75X75X6 0.063 Clause D2 124
47 L75X75X6 0.092 Clause D2 124
ATTACHMENT - 3
SUPPORT REACTION
Output Support reaction
Piperack 1 and Pipe Stanchion
FOUNDATION LISTS
One-Stop Solution for Foundation Group Name No. Description No. Description
F1 1 F1
F2 2 F2
F3 3 F3 4 F4
TITLE DESCRIPTION
PROJECT/JOB NO. 14-0602
PROJECT/JOB NAME NPK Fusion Plan
CLIENT NAME PT. Pupuk Sriwidjaja
SITE NAME Palembang
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Piperack 1 12-12-14 span 30m + pipe stanchion 6m b
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D
Copyright (c) GSE&C. All RightsReserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 2 Foundation Client : PT. Pupuk Sriwidj... Page 3
CONTENTS 1. GENERAL
1.1 CODE & STANDARD
1. GENERAL Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
1.1 CODE & STANDARD
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
1.2 MATERIALS & UNIT WEIGHT
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
1.3 SUBSOIL CONDITION & SAFETY FACTORS Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
1.4 LOAD COMBINATION
1.2 MATERIALS & UNIT WEIGHT
2. DRAWING Items Value
2.1 LOCATION PLAN Concrete (fck : compressive strength) 250.000 kgf/cm2
Lean Concrete (Lfck : compressive strength) 0.000 kgf/cm2
2.2 DETAIL SKETCH
Reinforcement (D10 ~ D16 , yield strength) 4000.000 kgf/cm2
Reinforcement (D19 ~ , yield strength) 4000.000 kgf/cm2
3. FOUNDATION DATA
Rs (Soil unit weight) 1.800 ton/m3
3.1 FOOTING DATA Rc (Concrete unit weight) 2.400 ton/m3
3.2 PIER DATA Es (Steel Modulus of Elasticity) 2.000 106 kgf/cm2
5.1 DESIGN MOMENT AND SHEAR FORCE Cu (Undrained cohesion) Clay , 0 tonf/m2
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 4 Foundation Client : PT. Pupuk Sriwidj... Page 5
Safety factor against sliding for the SL2(FS2) 2 234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
Friction factor () 0.5 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
235
Thermal Load (tf)
.6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
1.4 LOAD COMBINATION 236
Thermal Load (tf)
1.4.1 Group - F1 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F1 Thermal Load (tf)
Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
232 127
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf) .9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
128
Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 6 Foundation Client : PT. Pupuk Sriwidj... Page 7
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
129 232
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
130
Thermal Load (tf)
234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 235
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132 .6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 236
Thermal Load (tf)
1.4.2 Group - F2 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F2 Thermal Load (tf)
Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 8 Foundation Client : PT. Pupuk Sriwidj... Page 9
.9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
127 230
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
128 231
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
129 232
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
130
Thermal Load (tf)
234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 235
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132 .6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 236
Thermal Load (tf)
1.4.3 Group - F3 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F3, F4 Thermal Load (tf)
Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 10 Foundation Client : PT. Pupuk Sriwidj... Page 11
125
.9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
Thermal Load (tf)
2. DRAWING
.9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 2.1 LOCATION PLAN
126
Thermal Load (tf)
2.2 DETAIL SKETCH
.9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
127
Thermal Load (tf)
.9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
128
Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
129
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
130
Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132
Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 Page 12
REFERENCE DWGS
NO. DWG NO. DWG TITLE
NOTES
* OUTPUT UNIT : mm
30000 6000
3000
01 1 5
39
F3 45
F4
3 7
F1 F2 NPK Fusion Plan PROJECT
AS SHOWN 14-0602
12/15/2014 Page 13
OUTPUT UNIT : mm
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
2000
1000x2
1500
NOTES
* OUTPUT UNIT : mm
CL FOOTING
4000
1000
3
NPK Fusion Plan PROJECT
1500
FOUNDATION DETAIL FOR
F1
FOUNDATION PLAN
SQUAD CHECK
12/15/2014 Page 15
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
TOP BOTTOM
50
TYP.
NOTES
* OUTPUT UNIT : mm
D19@200
D19@200
REINFORCEMENT PLAN
SQUAD CHECK
1600
1
400
3
ELEVATION S1 - X
OUTPUT UNIT : mm
1 3
550 550
50 212.5 212.5 50 212.5 212.5
TYP. 125 TYP. 125
500
125
500
125
D16 D16
187.5 187.5
187.5 187.5
8-D19 8-D19
75 PR.
75 PR.
30 GR.
30 GR.
50
50
50
50
D19 D19
1800
1800
D16
D16
@200
@200
100
100
OUTPUT UNIT : mm
12/15/2014 Page 19
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
2000
1000x2
1500
NOTES
* OUTPUT UNIT : mm
5
CL FOOTING
4000
1000
7
NPK Fusion Plan PROJECT
1500
FOUNDATION PLAN
SQUAD CHECK
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
TOP BOTTOM
50
TYP.
NOTES
* OUTPUT UNIT : mm
D19@200
D19@200
NPK Fusion Plan PROJECT
REINFORCEMENT PLAN
SQUAD CHECK
12/15/2014 Page 21
7
1600
5
400
ELEVATION S1 - X
OUTPUT UNIT : mm
5 7
550 550
50 212.5 212.5 50 212.5 212.5
TYP. 125 TYP. 125
500
125
500
125
D16 D16
187.5 187.5
187.5 187.5
8-D19 8-D19
75 PR.
75 PR.
30 GR.
30 GR.
50
50
50
50
D19 D19
1800
1800
D16
D16
@200
@200
100
100
12/15/2014 Page 23
OUTPUT UNIT : mm
INST.
MICROFILM NO.
12/15/2014
ELEC.
Project Na. : NPK Fusion Plan
REFERENCE DWGS
Calculation Sheet
NOTES
Foundation
F3 ~ F4
Client : PT. Pupuk Sriwidj... Page 25
14-0602
* OUTPUT UNIT : mm
JOB NO.
3. FOUNDATION DATA
* ANCHOR BOLT
DWG NO.
AS SHOWN
Unit : mmFt. Name F1
SCALE
Ft. Type MAT
NO.
SQUAD CHECK
DRWNCHKDAPPDAPPDAPPD
Ft. Thickness 400.00 mm
Ft. Volume 3.200 m3
TYP. D19@200 Ft. Weight 7.680 tonf
50
Soil Height 1600.00 mm
Soil Volume 11.920 m3
D16
TYP.
Soil Weight 21.456 tonf
D19@200
FOOTING REINF. PLAN
BOTTOM
50
1
4000
CL FOOTING
DESCRIPTION
137.5 Buoyancy Not Consider
PEDESTAL
Self Weight (except Pr.SW) 29.136 tonf
8-D19
3
400
125
TOP
137.5
D19@200
REV. DATE
1800
1600
125
137.5 137.5
400 The Origin coordinate
400
The Center of gravity (0,0) mm
D19@200
4000
(2 EA)
800
1800
1600
400 75 PROJ.
800 700 The Origin coordinate
400
900 300 The Center of gravity (0,0) mm
TOC EL. + 200
12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 26 Foundation Client : PT. Pupuk Sriwidj... Page 27
Soil Weight 0.605 tonf 5 Rectangle 550.000 500.000 1800.000 0.275 1.188 0.000 500.000
F2
800
Unit : mm Unit : mm
The Origin coordinate 2000 2000
300
4000
4000
Ft. Type ISO
800 Area 0.640 m2
Ft. Thickness 300.00 mm
Ft. Volume 0.192 m3
Direction All Direct Section Area m2
Direction
8.000 All Direct Section Area 8.000 m2
Ft. Weight 0.461 tonf
F.Volume F.Weight 3.200
7.680 m3
F.Volume
tonf 3.200 m3 F.Weight 7.680 tonf
Soil Height 700.00 mm
S.Volume S.Weight 11.920
21.456 m3
S.Volume
tonf 11.920 m3 S.Weight 21.456 tonf
Soil Volume 0.336 m3
Pier Wt Total Weight Pier Wt
2.376
31.512tonf
tonf 2.376 tonf Total Weight 31.512 tonf
Soil Weight 0.605 tonf
800
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 28 Foundation Client : PT. Pupuk Sriwidj... Page 29
800
7 0.000 -0.218 -1.470 0.000 0.000
8 0.000 0.000 -0.117 0.000 0.000
9 -0.256 -0.001 -0.437 0.000 0.000
10 0.089 -0.003 0.022 0.000 0.000
Footing SW 0.000 0.000 -29.136 0.000 0.000
Direction All Direct Section Area 0.640 m 2
Direction All Direct Section Area 0.640 m 2 1 0.000 0.000 -1.188 0.000 0.000
2 0.673 0.004 -1.549 0.000 0.000
F.Volume 0.192 m3 F.Weight 0.461 tonf F.Volume 0.192 m3 F.Weight 0.461 tonf
3 0.000 0.000 0.000 0.000 0.000
S.Volume 0.336 m3 S.Weight 0.605 tonf S.Volume 0.336 m3 S.Weight 0.605 tonf
4 0.140 0.000 -0.034 0.000 0.000
Pier Wt 0.346 tonf Total Weight 1.411 tonf Pier Wt 0.346 tonf Total Weight 1.411 tonf 5 -0.003 -0.023 8.243 0.000 0.000
5
6 0.108 0.000 -0.053 0.000 0.000
3.4 LOAD CASE 7 0.000 0.002 1.470 0.000 0.000
8 0.000 0.000 -0.099 0.000 0.000
Fz
9 0.093 0.001 -0.159 0.000 0.000
Fy
Mz 10 0.089 0.000 -0.059 0.000 0.000
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are based on
My the right hand rule. F2 1 0.000 0.000 -1.188 0.000 0.000
Fx 2 0.681 -0.004 -1.549 0.000 0.000
Mx
3 0.000 0.000 0.000 0.000 0.000
4 0.142 0.000 -0.035 0.000 0.000
Index Load Case Name
5 0.002 -1.394 -8.243 0.000 0.000
1 SW 7
6 0.108 0.000 -0.045 0.000 0.000
2 DL 7 0.000 -0.218 -1.470 0.000 0.000
3 Live Load (l) 8 0.000 0.000 -0.117 0.000 0.000
4 Wind Load (wx) 9 0.256 -0.001 -0.437 0.000 0.000
10 0.089 0.003 -0.022 0.000 0.000
5 Wind Load (wz)
Footing SW 0.000 0.000 -29.136 0.000 0.000
6 Seismic Load (vx)
1 0.000 0.000 -0.346 0.000 0.000
7 Seismic Load (vz) 2 0.000 0.000 -0.024 0.000 0.000
8 Seismic Load (vy) 3 0.000 0.000 0.000 0.000 0.000
9 Piping Operating P(o) 4 0.015 0.000 0.000 0.000 0.004
5 0.000 0.000 0.000 0.000 0.000
10 Thermal Load (tf) 39
F3 6 0.100 0.000 0.000 0.000 0.030
Unit( tonf , tonf-m ) 7 0.000 -0.100 0.000 0.030 0.000
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My 8 0.000 0.000 -0.100 0.000 0.000
1 0.000 0.000 -1.188 0.000 0.000 9 0.000 0.000 -0.602 0.011 0.000
2 -0.673 0.004 -1.549 0.000 0.000 10 0.180 0.000 0.000 0.000 0.054
3 0.000 0.000 0.000 0.000 0.000 Footing SW 0.000 0.000 -1.066 0.000 0.000
4 0.140 0.000 0.034 0.000 0.000 1 0.000 0.000 -0.346 0.000 0.000
F1 1 5 0.003 -0.023 8.243 0.000 0.000 2 0.000 0.000 -0.024 0.000 0.000
6 0.108 0.000 0.053 0.000 0.000 3 0.000 0.000 0.000 0.000 0.000
F4 45
7 0.000 0.002 1.470 0.000 0.000 4 0.015 0.000 0.000 0.000 0.004
8 0.000 0.000 -0.099 0.000 0.000 5 0.000 0.000 0.000 0.000 0.000
9 -0.093 0.001 -0.159 0.000 0.000 6 0.100 0.000 0.000 0.000 0.030
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 30 Foundation Client : PT. Pupuk Sriwidj... Page 31
7 0.000 -0.100 0.000 0.030 0.000 237 -0.482 0.003 -0.787 0.000 0.000
8 0.000 0.000 -0.100 0.000 0.000 238 -0.482 0.003 -1.405 0.000 0.000
9 0.000 0.000 -0.602 0.011 0.000 239 -0.384 0.004 -0.019 0.000 0.000
10 0.180 0.000 0.000 0.000 0.054 240 -0.429 0.004 -0.041 0.000 0.000
Footing SW 0.000 0.000 -1.066 0.000 0.000 241 -0.384 0.002 -2.077 0.000 0.000
242 -0.429 0.002 -2.099 0.000 0.000
111 -0.679 0.005 -1.689 0.000 0.000
3.5 LOAD COMBINATION
112 -0.812 0.006 -1.979 0.000 0.000
In Pier Top In Footing Bottom In Footing Bottom Center 113 -0.588 0.006 -1.924 0.000 0.000
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight, 114 -0.808 -0.031 11.210 0.000 0.000
But without Footing Self Weight, Case PileType 115 -0.704 0.007 -1.584 0.000 0.000
in centroid of Pile Group 116 -0.704 0.005 -2.466 0.000 0.000
Case NonPileType 117 -0.920 0.007 -1.690 0.000 0.000
in centroid of Footing 118 -0.920 0.005 -2.572 0.000 0.000
119 -0.780 0.008 -0.592 0.000 0.000
120 -0.845 0.008 -0.624 0.000 0.000
121 -0.780 0.004 -3.532 0.000 0.000
122 -0.845 0.004 -3.564 0.000 0.000
123 -0.385 0.005 -1.430 0.000 0.000
124 -0.604 -0.032 11.705 0.000 0.000
3.5.1 Load Combination in Pier Top (Without SW) 125 -0.501 0.005 -1.089 0.000 0.000
126 -0.501 0.004 -1.971 0.000 0.000
Group 1 - F1 Unit( tonf , tonf-m ) 127 -0.717 0.005 -1.195 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 -0.717 0.004 -2.077 0.000 0.000
F1 211 -0.677 0.005 -1.649 0.000 0.000 129 -0.577 0.007 -0.097 0.000 0.000
212 -0.677 0.005 -1.649 0.000 0.000 130 -0.642 0.007 -0.129 0.000 0.000
213 -0.537 0.005 -1.615 0.000 0.000 131 -0.577 0.003 -3.037 0.000 0.000
214 -0.674 -0.018 6.594 0.000 0.000 132 -0.642 0.003 -3.069 0.000 0.000
215 -0.601 0.005 -1.373 0.000 0.000 211 -0.848 -0.008 -1.964 0.000 0.000
216 -0.601 0.005 -1.990 0.000 0.000 212 -0.848 -0.008 -1.964 0.000 0.000
217 -0.753 0.005 -1.447 0.000 0.000 213 -0.706 -0.008 -1.929 0.000 0.000
218 -0.753 0.005 -2.064 0.000 0.000 214 -0.850 -1.402 -10.207 0.000 0.000
219 -0.654 0.006 -0.678 0.000 0.000 215 -0.772 -0.054 -2.323 0.000 0.000
220 -0.700 0.006 -0.700 0.000 0.000 216 -0.772 0.038 -1.706 0.000 0.000
221 -0.654 0.004 -2.736 0.000 0.000 217 -0.924 -0.054 -2.386 0.000 0.000
222 -0.700 0.004 -2.758 0.000 0.000 218 -0.924 0.038 -1.769 0.000 0.000
223 -0.572 0.005 -1.623 0.000 0.000 219 -0.825 -0.161 -3.065 0.000 0.000
1
224 -0.675 -0.012 4.533 0.000 0.000 220 -0.871 -0.161 -3.084 0.000 0.000
225 -0.620 0.005 -1.442 0.000 0.000 221 -0.825 0.145 -1.007 0.000 0.000
226 -0.620 0.005 -1.905 0.000 0.000 3
222 -0.871 0.145 -1.026 0.000 0.000
227 -0.734 0.005 -1.497 0.000 0.000 223 -0.742 -0.008 -1.938 0.000 0.000
228 -0.734 0.005 -1.960 0.000 0.000 224 -0.850 -1.054 -8.146 0.000 0.000
229 -0.660 0.006 -0.921 0.000 0.000 225 -0.791 -0.042 -2.233 0.000 0.000
230 -0.694 0.006 -0.938 0.000 0.000 226 -0.791 0.026 -1.770 0.000 0.000
231 -0.660 0.004 -2.464 0.000 0.000 227 -0.905 -0.042 -2.281 0.000 0.000
232 -0.694 0.004 -2.481 0.000 0.000 228 -0.905 0.026 -1.818 0.000 0.000
233 -0.266 0.003 -0.955 0.000 0.000 229 -0.831 -0.122 -2.790 0.000 0.000
234 -0.403 -0.020 7.254 0.000 0.000 230 -0.865 -0.122 -2.804 0.000 0.000
235 -0.331 0.003 -0.713 0.000 0.000 231 -0.831 0.106 -1.247 0.000 0.000
236 -0.331 0.003 -1.330 0.000 0.000 232 -0.865 0.106 -1.261 0.000 0.000
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 32 Foundation Client : PT. Pupuk Sriwidj... Page 33
233 -0.367 -0.005 -1.143 0.000 0.000 226 0.912 0.005 -2.078 0.000 0.000
234 -0.511 -1.399 -9.421 0.000 0.000 227 0.798 0.005 -1.560 0.000 0.000
235 -0.433 -0.051 -1.538 0.000 0.000 228 0.798 0.005 -2.023 0.000 0.000
236 -0.433 0.041 -0.920 0.000 0.000 229 0.872 0.006 -1.056 0.000 0.000
237 -0.584 -0.051 -1.600 0.000 0.000 230 0.838 0.006 -1.039 0.000 0.000
238 -0.584 0.041 -0.983 0.000 0.000 231 0.872 0.004 -2.599 0.000 0.000
239 -0.486 -0.157 -2.280 0.000 0.000 232 0.838 0.004 -2.582 0.000 0.000
240 -0.531 -0.157 -2.299 0.000 0.000 233 0.653 0.003 -1.094 0.000 0.000
241 -0.486 0.148 -0.222 0.000 0.000 234 0.510 -0.020 7.183 0.000 0.000
242 -0.531 0.148 -0.241 0.000 0.000 235 0.589 0.003 -0.858 0.000 0.000
111 -0.915 -0.010 -2.130 0.000 0.000 236 0.589 0.003 -1.475 0.000 0.000
112 -1.018 -0.010 -2.357 0.000 0.000 237 0.437 0.003 -0.784 0.000 0.000
113 -0.790 -0.010 -2.301 0.000 0.000 238 0.437 0.003 -1.401 0.000 0.000
114 -1.021 -2.240 -15.546 0.000 0.000 239 0.536 0.004 -0.112 0.000 0.000
115 -0.910 -0.075 -2.870 0.000 0.000 240 0.490 0.004 -0.089 0.000 0.000
116 -0.910 0.056 -1.988 0.000 0.000 241 0.536 0.002 -2.170 0.000 0.000
117 -1.126 -0.075 -2.960 0.000 0.000 242 0.490 0.002 -2.147 0.000 0.000
118 -1.126 0.056 -2.078 0.000 0.000 111 0.928 0.005 -1.854 0.000 0.000
119 -0.985 -0.228 -3.930 0.000 0.000 112 1.026 0.006 -2.120 0.000 0.000
120 -1.050 -0.228 -3.957 0.000 0.000 113 1.250 0.006 -2.175 0.000 0.000
121 -0.985 0.208 -0.990 0.000 0.000 114 1.021 -0.031 11.068 0.000 0.000
122 -1.050 0.208 -1.017 0.000 0.000 115 1.134 0.007 -1.831 0.000 0.000
123 -0.536 -0.007 -1.712 0.000 0.000 116 1.134 0.005 -2.713 0.000 0.000
124 -0.766 -2.238 -14.956 0.000 0.000 117 0.918 0.007 -1.725 0.000 0.000
125 -0.655 -0.073 -2.281 0.000 0.000 118 0.918 0.005 -2.607 0.000 0.000
126 -0.655 0.058 -1.399 0.000 0.000 119 1.058 0.008 -0.765 0.000 0.000
127 -0.871 -0.073 -2.371 0.000 0.000 120 0.994 0.008 -0.734 0.000 0.000
128 -0.871 0.058 -1.489 0.000 0.000 121 1.058 0.004 -3.705 0.000 0.000
129 -0.731 -0.225 -3.341 0.000 0.000 122 0.994 0.004 -3.674 0.000 0.000
130 -0.796 -0.225 -3.368 0.000 0.000 123 0.993 0.005 -1.645 0.000 0.000
131 -0.731 0.211 -0.401 0.000 0.000 124 0.765 -0.032 11.599 0.000 0.000
132 -0.796 0.211 -0.428 0.000 0.000 125 0.877 0.005 -1.301 0.000 0.000
126 0.877 0.004 -2.183 0.000 0.000
Group 2 - F2 Unit( tonf , tonf-m ) 127 0.661 0.005 -1.195 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 0.661 0.004 -2.077 0.000 0.000
F2 211 0.855 0.005 -1.767 0.000 0.000 129 0.802 0.007 -0.235 0.000 0.000
212 0.855 0.005 -1.767 0.000 0.000 130 0.737 0.007 -0.203 0.000 0.000
213 0.995 0.005 -1.801 0.000 0.000 131 0.802 0.003 -3.175 0.000 0.000
214 0.852 -0.018 6.476 0.000 0.000 132 0.737 0.003 -3.143 0.000 0.000
215 0.931 0.005 -1.565 0.000 0.000 211 1.026 -0.002 -2.008 0.000 0.000
216 0.931 0.005 -2.182 0.000 0.000 212 1.026 -0.002 -2.008 0.000 0.000
217 0.779 0.005 -1.491 0.000 0.000 213 1.168 -0.002 -2.043 0.000 0.000
5 218 0.779 0.005 -2.108 0.000 0.000 214 1.028 -1.396 -10.251 0.000 0.000
219 0.878 0.006 -0.818 0.000 0.000 215 1.102 -0.048 -2.430 0.000 0.000
220 0.832 0.006 -0.796 0.000 0.000 7 216 1.102 0.044 -1.813 0.000 0.000
221 0.878 0.004 -2.876 0.000 0.000 217 0.950 -0.048 -2.367 0.000 0.000
222 0.832 0.004 -2.854 0.000 0.000 218 0.950 0.044 -1.750 0.000 0.000
223 0.960 0.005 -1.793 0.000 0.000 219 1.049 -0.155 -3.128 0.000 0.000
224 0.853 -0.012 4.415 0.000 0.000 220 1.003 -0.155 -3.109 0.000 0.000
225 0.912 0.005 -1.615 0.000 0.000 221 1.049 0.151 -1.070 0.000 0.000
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 34 Foundation Client : PT. Pupuk Sriwidj... Page 35
222 1.003 0.151 -1.051 0.000 0.000 215 0.250 -0.021 -0.696 0.017 0.075
223 1.133 -0.002 -2.034 0.000 0.000 216 0.250 0.021 -0.696 0.005 0.075
224 1.028 -1.048 -8.190 0.000 0.000 217 0.110 -0.021 -0.696 0.017 0.033
225 1.083 -0.036 -2.325 0.000 0.000 218 0.110 0.021 -0.696 0.005 0.033
226 1.083 0.032 -1.862 0.000 0.000 219 0.201 -0.070 -0.696 0.032 0.060
227 0.969 -0.036 -2.277 0.000 0.000 220 0.159 -0.070 -0.696 0.032 0.048
228 0.969 0.032 -1.814 0.000 0.000 221 0.201 0.070 -0.696 -0.010 0.060
229 1.043 -0.116 -2.848 0.000 0.000 222 0.159 0.070 -0.696 -0.010 0.048
230 1.009 -0.116 -2.834 0.000 0.000 223 0.191 0.000 -0.626 0.011 0.057
231 1.043 0.112 -1.305 0.000 0.000 224 0.180 0.000 -0.626 0.011 0.054
232 1.009 0.112 -1.291 0.000 0.000 225 0.233 -0.016 -0.678 0.016 0.070
233 0.758 -0.001 -1.240 0.000 0.000 226 0.233 0.016 -0.678 0.006 0.070
234 0.618 -1.395 -9.448 0.000 0.000 227 0.128 -0.016 -0.678 0.016 0.038
235 0.691 -0.047 -1.627 0.000 0.000 228 0.128 0.016 -0.678 0.006 0.038
236 0.691 0.045 -1.010 0.000 0.000 229 0.196 -0.052 -0.678 0.027 0.059
237 0.540 -0.047 -1.564 0.000 0.000 230 0.164 -0.052 -0.678 0.027 0.049
238 0.540 0.045 -0.947 0.000 0.000 231 0.196 0.052 -0.678 -0.005 0.059
239 0.638 -0.154 -2.325 0.000 0.000 232 0.164 0.052 -0.678 -0.005 0.049
240 0.593 -0.154 -2.306 0.000 0.000 233 0.123 0.000 -0.376 0.007 0.036
241 0.638 0.151 -0.267 0.000 0.000 234 0.108 0.000 -0.376 0.007 0.032
242 0.593 0.151 -0.248 0.000 0.000 235 0.178 -0.021 -0.446 0.013 0.053
111 1.164 -0.001 -2.192 0.000 0.000 236 0.178 0.021 -0.446 0.000 0.053
112 1.231 -0.002 -2.410 0.000 0.000 237 0.038 -0.021 -0.446 0.013 0.011
113 1.458 -0.002 -2.466 0.000 0.000 238 0.038 0.021 -0.446 0.000 0.011
114 1.234 -2.233 -15.598 0.000 0.000 239 0.129 -0.070 -0.446 0.028 0.039
115 1.339 -0.068 -3.013 0.000 0.000 240 0.087 -0.070 -0.446 0.028 0.026
116 1.339 0.063 -2.131 0.000 0.000 241 0.129 0.070 -0.446 -0.014 0.039
117 1.123 -0.068 -2.923 0.000 0.000 242 0.087 0.070 -0.446 -0.014 0.026
118 1.123 0.063 -2.041 0.000 0.000 111 0.252 0.000 -0.867 0.015 0.076
119 1.264 -0.220 -4.010 0.000 0.000 112 0.216 0.000 -0.751 0.013 0.065
120 1.199 -0.220 -3.983 0.000 0.000 113 0.240 0.000 -0.751 0.013 0.071
121 1.264 0.216 -1.070 0.000 0.000 114 0.216 0.000 -0.751 0.013 0.065
122 1.199 0.216 -1.043 0.000 0.000 115 0.316 -0.030 -0.851 0.022 0.095
123 1.151 -0.002 -1.863 0.000 0.000 116 0.316 0.030 -0.851 0.004 0.095
124 0.927 -2.232 -14.996 0.000 0.000 117 0.116 -0.030 -0.851 0.022 0.035
125 1.031 -0.067 -2.410 0.000 0.000 118 0.116 0.030 -0.851 0.004 0.035
126 1.031 0.064 -1.528 0.000 0.000 119 0.246 -0.100 -0.851 0.043 0.074
127 0.815 -0.067 -2.320 0.000 0.000 120 0.186 -0.100 -0.851 0.043 0.056
128 0.815 0.064 -1.438 0.000 0.000 121 0.246 0.100 -0.851 -0.017 0.074
129 0.956 -0.220 -3.408 0.000 0.000 122 0.186 0.100 -0.851 -0.017 0.056
130 0.891 -0.220 -3.381 0.000 0.000 123 0.186 0.000 -0.563 0.010 0.055
131 0.956 0.216 -0.468 0.000 0.000 124 0.162 0.000 -0.563 0.010 0.049
132 0.891 0.216 -0.441 0.000 0.000 125 0.262 -0.030 -0.663 0.019 0.079
126 0.262 0.030 -0.663 0.001 0.079
Group 3 - F3 Unit( tonf , tonf-m ) 127 0.062 -0.030 -0.663 0.019 0.019
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 0.062 0.030 -0.663 0.001 0.019
F3 211 0.180 0.000 -0.626 0.011 0.054 129 0.192 -0.100 -0.663 0.040 0.058
212 0.180 0.000 -0.626 0.011 0.054 130 0.132 -0.100 -0.663 0.040 0.040
39
213 0.195 0.000 -0.626 0.011 0.058 131 0.192 0.100 -0.663 -0.020 0.058
214 0.180 0.000 -0.626 0.011 0.054 132 0.132 0.100 -0.663 -0.020 0.040
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 36 Foundation Client : PT. Pupuk Sriwidj... Page 37
F4 211 0.180 0.000 -0.626 0.011 0.054 129 0.192 -0.100 -0.663 0.040 0.058
212 0.180 0.000 -0.626 0.011 0.054 130 0.132 -0.100 -0.663 0.040 0.040
213 0.195 0.000 -0.626 0.011 0.058 131 0.192 0.100 -0.663 -0.020 0.058
214 0.180 0.000 -0.626 0.011 0.054 132 0.132 0.100 -0.663 -0.020 0.040
215 0.250 -0.021 -0.696 0.017 0.075
216 0.250 0.021 -0.696 0.005 0.075
217 0.110 -0.021 -0.696 0.017 0.033
3.5.2 Load Combination in Footing Bottom (With Pier SW)
218 0.110 0.021 -0.696 0.005 0.033 Group 1 - F1 Unit( tonf , tonf-m )
219 0.201 -0.070 -0.696 0.032 0.060 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
220 0.159 -0.070 -0.696 0.032 0.048 F1 211 -0.677 0.005 -2.837 -0.011 -1.489
221 0.201 0.070 -0.696 -0.010 0.060 212 -0.677 0.005 -2.837 -0.011 -1.489
222 0.159 0.070 -0.696 -0.010 0.048 213 -0.537 0.005 -2.803 -0.011 -1.181
223 0.191 0.000 -0.626 0.011 0.057 214 -0.674 -0.018 5.406 0.040 -1.483
224 0.180 0.000 -0.626 0.011 0.054 215 -0.601 0.005 -2.560 -0.012 -1.323
225 0.233 -0.016 -0.678 0.016 0.070 216 -0.601 0.005 -3.178 -0.010 -1.323
226 0.233 0.016 -0.678 0.006 0.070 217 -0.753 0.005 -2.635 -0.012 -1.656
227 0.128 -0.016 -0.678 0.016 0.038 218 -0.753 0.005 -3.252 -0.010 -1.656
228 0.128 0.016 -0.678 0.006 0.038 219 -0.654 0.006 -1.866 -0.014 -1.440
229 0.196 -0.052 -0.678 0.027 0.059 220 -0.700 0.006 -1.888 -0.014 -1.539
230 0.164 -0.052 -0.678 0.027 0.049 221 -0.654 0.004 -3.924 -0.008 -1.440
231 0.196 0.052 -0.678 -0.005 0.059 222 -0.700 0.004 -3.946 -0.008 -1.539
232 0.164 0.052 -0.678 -0.005 0.049 223 -0.572 0.005 -2.811 -0.011 -1.258
233 0.123 0.000 -0.376 0.007 0.036 224 -0.675 -0.012 3.345 0.027 -1.484
234 0.108 0.000 -0.376 0.007 0.032 225 -0.620 0.005 -2.630 -0.012 -1.365
235 0.178 -0.021 -0.446 0.013 0.053 226 -0.620 0.005 -3.093 -0.010 -1.365
45
236 0.178 0.021 -0.446 0.000 0.053 227 -0.734 0.005 -2.685 -0.012 -1.614
237 0.038 -0.021 -0.446 0.013 0.011 228 -0.734 0.005 -3.148 -0.010 -1.614
238 0.038 0.021 -0.446 0.000 0.011 229 -0.660 0.006 -2.109 -0.013 -1.452
239 0.129 -0.070 -0.446 0.028 0.039 230 -0.694 0.006 -2.126 -0.013 -1.527
240 0.087 -0.070 -0.446 0.028 0.026 1 231 -0.660 0.004 -3.652 -0.009 -1.452
241 0.129 0.070 -0.446 -0.014 0.039 232 -0.694 0.004 -3.669 -0.009 -1.527
242 0.087 0.070 -0.446 -0.014 0.026 233 -0.266 0.003 -1.668 -0.007 -0.586
111 0.252 0.000 -0.867 0.015 0.076 234 -0.403 -0.020 6.541 0.044 -0.887
112 0.216 0.000 -0.751 0.013 0.065 235 -0.331 0.003 -1.426 -0.008 -0.727
113 0.240 0.000 -0.751 0.013 0.071 236 -0.331 0.003 -2.043 -0.006 -0.727
114 0.216 0.000 -0.751 0.013 0.065 237 -0.482 0.003 -1.500 -0.008 -1.060
115 0.316 -0.030 -0.851 0.022 0.095 238 -0.482 0.003 -2.117 -0.006 -1.060
116 0.316 0.030 -0.851 0.004 0.095 239 -0.384 0.004 -0.731 -0.010 -0.844
117 0.116 -0.030 -0.851 0.022 0.035 240 -0.429 0.004 -0.754 -0.010 -0.944
118 0.116 0.030 -0.851 0.004 0.035 241 -0.384 0.002 -2.789 -0.004 -0.844
119 0.246 -0.100 -0.851 0.043 0.074 242 -0.429 0.002 -2.812 -0.004 -0.944
120 0.186 -0.100 -0.851 0.043 0.056 111 -0.679 0.005 -3.352 -0.012 -1.493
121 0.246 0.100 -0.851 -0.017 0.074 112 -0.812 0.006 -3.404 -0.013 -1.787
122 0.186 0.100 -0.851 -0.017 0.056 113 -0.588 0.006 -3.350 -0.013 -1.294
123 0.186 0.000 -0.563 0.010 0.055 114 -0.808 -0.031 9.784 0.068 -1.777
124 0.162 0.000 -0.563 0.010 0.049 115 -0.704 0.007 -3.009 -0.015 -1.550
125 0.262 -0.030 -0.663 0.019 0.079 116 -0.704 0.005 -3.891 -0.012 -1.550
126 0.262 0.030 -0.663 0.001 0.079 117 -0.920 0.007 -3.115 -0.015 -2.025
127 0.062 -0.030 -0.663 0.019 0.019 118 -0.920 0.005 -3.997 -0.012 -2.025
128 0.062 0.030 -0.663 0.001 0.019 119 -0.780 0.008 -2.018 -0.018 -1.716
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 38 Foundation Client : PT. Pupuk Sriwidj... Page 39
120 -0.845 0.008 -2.049 -0.018 -1.859 116 -0.910 0.056 -3.413 -0.123 -2.001
121 -0.780 0.004 -4.958 -0.009 -1.716 117 -1.126 -0.075 -4.385 0.165 -2.476
122 -0.845 0.004 -4.989 -0.009 -1.859 118 -1.126 0.056 -3.503 -0.123 -2.476
123 -0.385 0.005 -2.499 -0.010 -0.848 119 -0.985 -0.228 -5.356 0.501 -2.167
124 -0.604 -0.032 10.635 0.071 -1.330 120 -1.050 -0.228 -5.383 0.501 -2.310
125 -0.501 0.005 -2.158 -0.011 -1.103 121 -0.985 0.208 -2.416 -0.458 -2.167
126 -0.501 0.004 -3.040 -0.009 -1.103 122 -1.050 0.208 -2.443 -0.458 -2.310
127 -0.717 0.005 -2.264 -0.011 -1.578 123 -0.536 -0.007 -2.781 0.016 -1.179
128 -0.717 0.004 -3.146 -0.009 -1.578 124 -0.766 -2.238 -16.026 4.923 -1.686
129 -0.577 0.007 -1.166 -0.014 -1.269 125 -0.655 -0.073 -3.350 0.160 -1.441
130 -0.642 0.007 -1.198 -0.014 -1.412 126 -0.655 0.058 -2.468 -0.128 -1.441
131 -0.577 0.003 -4.106 -0.006 -1.269 127 -0.871 -0.073 -3.440 0.160 -1.917
132 -0.642 0.003 -4.138 -0.006 -1.412 128 -0.871 0.058 -2.558 -0.128 -1.917
211 -0.848 -0.008 -3.152 0.018 -1.866 129 -0.731 -0.225 -4.410 0.495 -1.608
212 -0.848 -0.008 -3.152 0.018 -1.866 130 -0.796 -0.225 -4.437 0.495 -1.750
213 -0.706 -0.008 -3.117 0.018 -1.553 131 -0.731 0.211 -1.470 -0.464 -1.608
214 -0.850 -1.402 -11.395 3.084 -1.870 132 -0.796 0.211 -1.497 -0.464 -1.750
215 -0.772 -0.054 -3.511 0.118 -1.699
216 -0.772 0.038 -2.894 -0.083 -1.699 Group 2 - F2 Unit( tonf , tonf-m )
217 -0.924 -0.054 -3.574 0.118 -2.032 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
218 -0.924 0.038 -2.957 -0.083 -2.032 F2 211 0.855 0.005 -2.955 -0.011 1.881
219 -0.825 -0.161 -4.253 0.353 -1.816 212 0.855 0.005 -2.955 -0.011 1.881
220 -0.871 -0.161 -4.272 0.353 -1.915 213 0.995 0.005 -2.989 -0.011 2.189
221 -0.825 0.145 -2.195 -0.318 -1.816 214 0.852 -0.018 5.288 0.040 1.874
222 -0.871 0.145 -2.214 -0.318 -1.915 215 0.931 0.005 -2.753 -0.012 2.047
223 -0.742 -0.008 -3.126 0.018 -1.631 216 0.931 0.005 -3.370 -0.010 2.047
224 -0.850 -1.054 -9.334 2.318 -1.869 217 0.779 0.005 -2.678 -0.012 1.715
225 -0.791 -0.042 -3.421 0.093 -1.741 218 0.779 0.005 -3.296 -0.010 1.715
226 -0.791 0.026 -2.958 -0.058 -1.741 219 0.878 0.006 -2.006 -0.014 1.931
227 -0.905 -0.042 -3.469 0.093 -1.990 220 0.832 0.006 -1.984 -0.014 1.831
228 -0.905 0.026 -3.006 -0.058 -1.990 221 0.878 0.004 -4.064 -0.008 1.931
3 229 -0.831 -0.122 -3.978 0.269 -1.828 222 0.832 0.004 -4.042 -0.008 1.831
230 -0.865 -0.122 -3.992 0.269 -1.903 223 0.960 0.005 -2.980 -0.011 2.112
231 -0.831 0.106 -2.435 -0.234 -1.828 224 0.853 -0.012 3.227 0.027 1.876
232 -0.865 0.106 -2.449 -0.234 -1.903 225 0.912 0.005 -2.803 -0.012 2.006
5
233 -0.367 -0.005 -1.856 0.011 -0.807 226 0.912 0.005 -3.266 -0.010 2.006
234 -0.511 -1.399 -10.134 3.077 -1.124 227 0.798 0.005 -2.748 -0.012 1.756
235 -0.433 -0.051 -2.250 0.111 -0.953 228 0.798 0.005 -3.211 -0.010 1.756
236 -0.433 0.041 -1.633 -0.090 -0.953 229 0.872 0.006 -2.244 -0.013 1.918
237 -0.584 -0.051 -2.313 0.111 -1.286 230 0.838 0.006 -2.227 -0.013 1.844
238 -0.584 0.041 -1.696 -0.090 -1.286 231 0.872 0.004 -3.787 -0.009 1.918
239 -0.486 -0.157 -2.993 0.346 -1.069 232 0.838 0.004 -3.770 -0.009 1.844
240 -0.531 -0.157 -3.012 0.346 -1.169 233 0.653 0.003 -1.807 -0.007 1.437
241 -0.486 0.148 -0.935 -0.325 -1.069 234 0.510 -0.020 6.470 0.044 1.122
242 -0.531 0.148 -0.954 -0.325 -1.169 235 0.589 0.003 -1.571 -0.008 1.295
111 -0.915 -0.010 -3.793 0.021 -2.013 236 0.589 0.003 -2.188 -0.006 1.295
112 -1.018 -0.010 -3.782 0.021 -2.239 237 0.437 0.003 -1.497 -0.008 0.962
113 -0.790 -0.010 -3.726 0.021 -1.739 238 0.437 0.003 -2.114 -0.006 0.962
114 -1.021 -2.240 -16.971 4.928 -2.246 239 0.536 0.004 -0.824 -0.010 1.178
115 -0.910 -0.075 -4.295 0.165 -2.001 240 0.490 0.004 -0.802 -0.010 1.079
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 40 Foundation Client : PT. Pupuk Sriwidj... Page 41
241 0.536 0.002 -2.882 -0.004 1.178 237 0.540 -0.047 -2.277 0.103 1.188
242 0.490 0.002 -2.860 -0.004 1.079 238 0.540 0.045 -1.659 -0.098 1.188
111 0.928 0.005 -3.517 -0.012 2.041 239 0.638 -0.154 -3.038 0.338 1.404
112 1.026 0.006 -3.546 -0.013 2.257 240 0.593 -0.154 -3.019 0.338 1.304
113 1.250 0.006 -3.600 -0.013 2.750 241 0.638 0.151 -0.980 -0.333 1.404
114 1.021 -0.031 9.643 0.068 2.247 242 0.593 0.151 -0.961 -0.333 1.304
115 1.134 0.007 -3.257 -0.015 2.495 111 1.164 -0.001 -3.855 0.003 2.561
116 1.134 0.005 -4.139 -0.012 2.495 112 1.231 -0.002 -3.835 0.005 2.709
117 0.918 0.007 -3.151 -0.015 2.020 113 1.458 -0.002 -3.891 0.005 3.208
118 0.918 0.005 -4.033 -0.012 2.020 114 1.234 -2.233 -17.024 4.912 2.716
119 1.058 0.008 -2.191 -0.018 2.328 115 1.339 -0.068 -4.438 0.149 2.946
120 0.994 0.008 -2.159 -0.018 2.186 116 1.339 0.063 -3.556 -0.139 2.946
121 1.058 0.004 -5.131 -0.009 2.328 117 1.123 -0.068 -4.348 0.149 2.471
122 0.994 0.004 -5.099 -0.009 2.186 118 1.123 0.063 -3.466 -0.139 2.471
123 0.993 0.005 -2.714 -0.010 2.186 119 1.264 -0.220 -5.436 0.485 2.780
124 0.765 -0.032 10.529 0.071 1.682 120 1.199 -0.220 -5.409 0.485 2.637
125 0.877 0.005 -2.371 -0.011 1.930 121 1.264 0.216 -2.496 -0.474 2.780
126 0.877 0.004 -3.253 -0.009 1.930 122 1.199 0.216 -2.469 -0.474 2.637
127 0.661 0.005 -2.265 -0.011 1.455 123 1.151 -0.002 -2.932 0.004 2.531
128 0.661 0.004 -3.147 -0.009 1.455 124 0.927 -2.232 -16.065 4.911 2.039
129 0.802 0.007 -1.304 -0.014 1.764 125 1.031 -0.067 -3.479 0.148 2.269
130 0.737 0.007 -1.273 -0.014 1.622 126 1.031 0.064 -2.597 -0.140 2.269
131 0.802 0.003 -4.244 -0.006 1.764 127 0.815 -0.067 -3.389 0.148 1.794
132 0.737 0.003 -4.213 -0.006 1.622 128 0.815 0.064 -2.507 -0.140 1.794
211 1.026 -0.002 -3.196 0.004 2.257 129 0.956 -0.220 -4.477 0.484 2.103
212 1.026 -0.002 -3.196 0.004 2.257 130 0.891 -0.220 -4.450 0.484 1.960
213 1.168 -0.002 -3.231 0.004 2.570 131 0.956 0.216 -1.537 -0.476 2.103
214 1.028 -1.396 -11.439 3.071 2.262 132 0.891 0.216 -1.510 -0.476 1.960
215 1.102 -0.048 -3.618 0.105 2.424
216 1.102 0.044 -3.001 -0.096 2.424 Group 3 - F3 Unit( tonf , tonf-m )
217 0.950 -0.048 -3.555 0.105 2.091 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
218 0.950 0.044 -2.938 -0.096 2.091 F3 211 0.180 0.000 -0.972 0.011 0.270
219 1.049 -0.155 -4.316 0.340 2.307 212 0.180 0.000 -0.972 0.011 0.270
220 1.003 -0.155 -4.297 0.340 2.207 213 0.195 0.000 -0.972 0.011 0.292
221 1.049 0.151 -2.258 -0.331 2.307 214 0.180 0.000 -0.972 0.011 0.270
222 1.003 0.151 -2.239 -0.331 2.207 215 0.250 -0.021 -1.042 0.043 0.375
223 1.133 -0.002 -3.222 0.004 2.492 216 0.250 0.021 -1.042 -0.021 0.375
7
224 1.028 -1.048 -9.378 2.305 2.261 217 0.110 -0.021 -1.042 0.043 0.165
225 1.083 -0.036 -3.513 0.080 2.382 218 0.110 0.021 -1.042 -0.021 0.165
226 1.083 0.032 -3.050 -0.071 2.382 219 0.201 -0.070 -1.042 0.116 0.302
227 0.969 -0.036 -3.465 0.080 2.132 39 220 0.159 -0.070 -1.042 0.116 0.239
228 0.969 0.032 -3.002 -0.071 2.132 221 0.201 0.070 -1.042 -0.094 0.302
229 1.043 -0.116 -4.036 0.256 2.295 222 0.159 0.070 -1.042 -0.094 0.239
230 1.009 -0.116 -4.022 0.256 2.220 223 0.191 0.000 -0.972 0.011 0.287
231 1.043 0.112 -2.493 -0.247 2.295 224 0.180 0.000 -0.972 0.011 0.270
232 1.009 0.112 -2.479 -0.247 2.220 225 0.233 -0.016 -1.024 0.035 0.349
233 0.758 -0.001 -1.953 0.003 1.667 226 0.233 0.016 -1.024 -0.013 0.349
234 0.618 -1.395 -10.161 3.069 1.359 227 0.128 -0.016 -1.024 0.035 0.191
235 0.691 -0.047 -2.340 0.103 1.521 228 0.128 0.016 -1.024 -0.013 0.191
236 0.691 0.045 -1.722 -0.098 1.521 229 0.196 -0.052 -1.024 0.090 0.294
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 42 Foundation Client : PT. Pupuk Sriwidj... Page 43
230 0.164 -0.052 -1.024 0.090 0.246 226 0.233 0.016 -1.024 -0.013 0.349
231 0.196 0.052 -1.024 -0.068 0.294 227 0.128 -0.016 -1.024 0.035 0.191
232 0.164 0.052 -1.024 -0.068 0.246 228 0.128 0.016 -1.024 -0.013 0.191
233 0.123 0.000 -0.583 0.007 0.184 229 0.196 -0.052 -1.024 0.090 0.294
234 0.108 0.000 -0.583 0.007 0.162 230 0.164 -0.052 -1.024 0.090 0.246
235 0.178 -0.021 -0.653 0.038 0.267 231 0.196 0.052 -1.024 -0.068 0.294
236 0.178 0.021 -0.653 -0.025 0.267 232 0.164 0.052 -1.024 -0.068 0.246
237 0.038 -0.021 -0.653 0.038 0.057 233 0.123 0.000 -0.583 0.007 0.184
238 0.038 0.021 -0.653 -0.025 0.057 234 0.108 0.000 -0.583 0.007 0.162
239 0.129 -0.070 -0.653 0.112 0.194 235 0.178 -0.021 -0.653 0.038 0.267
240 0.087 -0.070 -0.653 0.112 0.131 236 0.178 0.021 -0.653 -0.025 0.267
241 0.129 0.070 -0.653 -0.098 0.194 237 0.038 -0.021 -0.653 0.038 0.057
242 0.087 0.070 -0.653 -0.098 0.131 238 0.038 0.021 -0.653 -0.025 0.057
111 0.252 0.000 -1.351 0.015 0.378 239 0.129 -0.070 -0.653 0.112 0.194
112 0.216 0.000 -1.166 0.013 0.324 240 0.087 -0.070 -0.653 0.112 0.131
113 0.240 0.000 -1.166 0.013 0.359 241 0.129 0.070 -0.653 -0.098 0.194
114 0.216 0.000 -1.166 0.013 0.324 242 0.087 0.070 -0.653 -0.098 0.131
115 0.316 -0.030 -1.266 0.058 0.474 111 0.252 0.000 -1.351 0.015 0.378
116 0.316 0.030 -1.266 -0.032 0.474 112 0.216 0.000 -1.166 0.013 0.324
117 0.116 -0.030 -1.266 0.058 0.174 113 0.240 0.000 -1.166 0.013 0.359
118 0.116 0.030 -1.266 -0.032 0.174 114 0.216 0.000 -1.166 0.013 0.324
119 0.246 -0.100 -1.266 0.163 0.369 115 0.316 -0.030 -1.266 0.058 0.474
120 0.186 -0.100 -1.266 0.163 0.279 116 0.316 0.030 -1.266 -0.032 0.474
121 0.246 0.100 -1.266 -0.137 0.369 117 0.116 -0.030 -1.266 0.058 0.174
122 0.186 0.100 -1.266 -0.137 0.279 118 0.116 0.030 -1.266 -0.032 0.174
123 0.186 0.000 -0.874 0.010 0.278 119 0.246 -0.100 -1.266 0.163 0.369
124 0.162 0.000 -0.874 0.010 0.243 120 0.186 -0.100 -1.266 0.163 0.279
125 0.262 -0.030 -0.974 0.055 0.393 121 0.246 0.100 -1.266 -0.137 0.369
126 0.262 0.030 -0.974 -0.035 0.393 122 0.186 0.100 -1.266 -0.137 0.279
127 0.062 -0.030 -0.974 0.055 0.093 123 0.186 0.000 -0.874 0.010 0.278
128 0.062 0.030 -0.974 -0.035 0.093 124 0.162 0.000 -0.874 0.010 0.243
129 0.192 -0.100 -0.974 0.160 0.288 125 0.262 -0.030 -0.974 0.055 0.393
130 0.132 -0.100 -0.974 0.160 0.198 126 0.262 0.030 -0.974 -0.035 0.393
131 0.192 0.100 -0.974 -0.140 0.288 127 0.062 -0.030 -0.974 0.055 0.093
132 0.132 0.100 -0.974 -0.140 0.198 128 0.062 0.030 -0.974 -0.035 0.093
F4 211 0.180 0.000 -0.972 0.011 0.270 129 0.192 -0.100 -0.974 0.160 0.288
212 0.180 0.000 -0.972 0.011 0.270 130 0.132 -0.100 -0.974 0.160 0.198
213 0.195 0.000 -0.972 0.011 0.292 131 0.192 0.100 -0.974 -0.140 0.288
214 0.180 0.000 -0.972 0.011 0.270 132 0.132 0.100 -0.974 -0.140 0.198
215 0.250 -0.021 -1.042 0.043 0.375
216 0.250 0.021 -1.042 -0.021 0.375
217 0.110 -0.021 -1.042 0.043 0.165 3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
45 218 0.110 0.021 -1.042 -0.021 0.165 Load Combination of Elastic Condition
219 0.201 -0.070 -1.042 0.116 0.302 Group 1 - F1
220 0.159 -0.070 -1.042 0.116 0.239 - C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
221 0.201 0.070 -1.042 -0.094 0.302
222 0.159 0.070 -1.042 -0.094 0.239 Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
223 0.191 0.000 -0.972 0.011 0.287 F1 211 -1.525 -0.003 -35.125 0.164 -3.355 1000.0 , 1995.5
224 0.180 0.000 -0.972 0.011 0.270 212 -1.525 -0.003 -35.125 0.164 -3.355 1000.0 , 1995.5
225 0.233 -0.016 -1.024 0.035 0.349
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 44 Foundation Client : PT. Pupuk Sriwidj... Page 45
213 -1.243 -0.003 -35.056 0.164 -2.735 1000.0 , 1995.5 218 1.730 0.048 -35.370 -0.285 3.806 1000.0 , 2005.1
214 -1.524 -1.420 -35.125 11.524 -3.353 1000.0 , 1760.8 219 1.926 -0.148 -35.459 1.481 4.238 1000.0 , 1967.4
215 -1.374 -0.048 -35.208 0.582 -3.022 1000.0 , 1986.5 220 1.836 -0.148 -35.418 1.483 4.038 1000.0 , 1967.3
216 -1.374 0.042 -35.208 -0.235 -3.022 1000.0 , 2004.0 221 1.926 0.154 -35.459 -1.242 4.238 1000.0 , 2025.5
217 -1.676 -0.048 -35.345 0.576 -3.688 1000.0 , 1986.7 222 1.836 0.154 -35.418 -1.241 4.038 1000.0 , 2025.4
218 -1.676 0.042 -35.345 -0.241 -3.688 1000.0 , 2004.2 223 2.092 0.003 -35.339 0.114 4.604 1000.0 , 1996.6
219 -1.480 -0.154 -35.256 1.533 -3.255 1000.0 , 1966.1 224 1.880 -1.060 -35.287 8.634 4.137 1000.0 , 1821.4
220 -1.570 -0.154 -35.297 1.531 -3.455 1000.0 , 1966.2 225 1.994 -0.031 -35.452 0.423 4.388 1000.0 , 1990.0
221 -1.480 0.148 -35.256 -1.190 -3.255 1000.0 , 2024.5 226 1.994 0.037 -35.452 -0.190 4.388 1000.0 , 2003.1
222 -1.570 0.148 -35.297 -1.192 -3.455 1000.0 , 2024.5 227 1.768 -0.031 -35.349 0.427 3.889 1000.0 , 1989.8
223 -1.313 -0.003 -35.073 0.164 -2.890 1000.0 , 1995.5 228 1.768 0.037 -35.349 -0.186 3.889 1000.0 , 2002.9
224 -1.524 -1.066 -35.125 8.684 -3.353 1000.0 , 1819.5 229 1.915 -0.110 -35.416 1.139 4.213 1000.0 , 1974.7
225 -1.412 -0.037 -35.187 0.477 -3.106 1000.0 , 1988.8 230 1.847 -0.110 -35.385 1.140 4.063 1000.0 , 1974.6
226 -1.412 0.031 -35.187 -0.135 -3.106 1000.0 , 2001.9 231 1.915 0.116 -35.416 -0.903 4.213 1000.0 , 2018.3
227 -1.638 -0.037 -35.290 0.473 -3.604 1000.0 , 1988.9 232 1.847 0.116 -35.385 -0.902 4.063 1000.0 , 2018.3
228 -1.638 0.031 -35.290 -0.140 -3.604 1000.0 , 2002.0 233 1.411 0.002 -21.241 0.069 3.103 1000.0 , 1997.8
229 -1.491 -0.116 -35.223 1.191 -3.280 1000.0 , 1973.5 234 1.128 -1.415 -21.172 11.429 2.481 1000.0 , 1746.7
230 -1.559 -0.116 -35.254 1.189 -3.430 1000.0 , 1973.5 235 1.280 -0.044 -21.392 0.480 2.816 1000.0 , 1988.4
231 -1.491 0.110 -35.223 -0.852 -3.280 1000.0 , 2017.3 236 1.280 0.047 -21.392 -0.337 2.816 1000.0 , 2007.0
232 -1.559 0.110 -35.254 -0.853 -3.430 1000.0 , 2017.3 237 0.977 -0.044 -21.255 0.486 2.150 1000.0 , 1988.1
233 -0.633 -0.002 -21.006 0.098 -1.393 1000.0 , 1997.1 238 0.977 0.047 -21.255 -0.331 2.150 1000.0 , 2006.9
234 -0.914 -1.419 -21.075 11.459 -2.011 1000.0 , 1745.3 239 1.174 -0.149 -21.344 1.435 2.583 1000.0 , 1966.5
235 -0.764 -0.047 -21.158 0.516 -1.680 1000.0 , 1987.4 240 1.083 -0.149 -21.303 1.437 2.383 1000.0 , 1966.4
236 -0.764 0.044 -21.158 -0.301 -1.680 1000.0 , 2006.3 241 1.174 0.153 -21.344 -1.288 2.583 1000.0 , 2028.8
237 -1.066 -0.047 -21.295 0.510 -2.346 1000.0 , 1987.7 242 1.083 0.153 -21.303 -1.286 2.383 1000.0 , 2028.8
238 -1.066 0.044 -21.295 -0.307 -2.346 1000.0 , 2006.4
Group 3 - F3
239 -0.870 -0.153 -21.206 1.467 -1.913 1000.0 , 1965.6
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
240 -0.960 -0.153 -21.247 1.466 -2.113 1000.0 , 1965.7
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
241 -0.870 0.149 -21.206 -1.256 -1.913 1000.0 , 2028.2
F3 211 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
242 -0.960 0.149 -21.247 -1.258 -2.113 1000.0 , 2028.2
212 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
Group 2 - F2 213 0.195 0.000 -2.037 0.011 0.292 400.0 , 400.0
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m ) 214 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads 215 0.250 -0.021 -2.107 0.043 0.375 400.0 , 400.0
F2 211 1.881 0.003 -35.287 0.114 4.138 1000.0 , 1996.6 216 0.250 0.021 -2.107 -0.021 0.375 400.0 , 400.0
212 1.881 0.003 -35.287 0.114 4.138 1000.0 , 1996.6 217 0.110 -0.021 -2.107 0.043 0.165 400.0 , 400.0
213 2.163 0.003 -35.356 0.114 4.759 1000.0 , 1996.6 218 0.110 0.021 -2.107 -0.021 0.165 400.0 , 400.0
214 1.880 -1.414 -35.287 11.474 4.136 1000.0 , 1763.0 219 0.201 -0.070 -2.107 0.116 0.302 400.0 , 400.0
215 2.032 -0.042 -35.507 0.526 4.471 1000.0 , 1987.8 220 0.159 -0.070 -2.107 0.116 0.239 400.0 , 400.0
216 2.032 0.048 -35.507 -0.291 4.471 1000.0 , 2005.2 221 0.201 0.070 -2.107 -0.094 0.302 400.0 , 400.0
217 1.730 -0.042 -35.370 0.531 3.806 1000.0 , 1987.6 222 0.159 0.070 -2.107 -0.094 0.239 400.0 , 400.0
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 46 Foundation Client : PT. Pupuk Sriwidj... Page 47
223 0.191 0.000 -2.037 0.011 0.287 400.0 , 400.0 232 0.164 0.052 -2.090 -0.068 0.246 400.0 , 400.0
224 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0 233 0.123 0.000 -1.222 0.007 0.184 400.0 , 400.0
225 0.233 -0.016 -2.090 0.035 0.349 400.0 , 400.0 234 0.108 0.000 -1.222 0.007 0.162 400.0 , 400.0
226 0.233 0.016 -2.090 -0.013 0.349 400.0 , 400.0 235 0.178 -0.021 -1.292 0.038 0.267 400.0 , 400.0
227 0.128 -0.016 -2.090 0.035 0.191 400.0 , 400.0 236 0.178 0.021 -1.292 -0.025 0.267 400.0 , 400.0
228 0.128 0.016 -2.090 -0.013 0.191 400.0 , 400.0 237 0.038 -0.021 -1.292 0.038 0.057 400.0 , 400.0
229 0.196 -0.052 -2.090 0.090 0.294 400.0 , 400.0 238 0.038 0.021 -1.292 -0.025 0.057 400.0 , 400.0
230 0.164 -0.052 -2.090 0.090 0.246 400.0 , 400.0 239 0.129 -0.070 -1.292 0.112 0.194 400.0 , 400.0
231 0.196 0.052 -2.090 -0.068 0.294 400.0 , 400.0 240 0.087 -0.070 -1.292 0.112 0.131 400.0 , 400.0
232 0.164 0.052 -2.090 -0.068 0.246 400.0 , 400.0 241 0.129 0.070 -1.292 -0.098 0.194 400.0 , 400.0
233 0.123 0.000 -1.222 0.007 0.184 400.0 , 400.0 242 0.087 0.070 -1.292 -0.098 0.131 400.0 , 400.0
234 0.108 0.000 -1.222 0.007 0.162 400.0 , 400.0
235 0.178 -0.021 -1.292 0.038 0.267 400.0 , 400.0 Load Combination of Ultimate Condition
Group 1 - F1
236 0.178 0.021 -1.292 -0.025 0.267 400.0 , 400.0
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
237 0.038 -0.021 -1.292 0.038 0.057 400.0 , 400.0
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
238 0.038 0.021 -1.292 -0.025 0.057 400.0 , 400.0
111 -1.593 -0.004 -7.145 0.230 -3.505 1000.0 , 1993.9
239 0.129 -0.070 -1.292 0.112 0.194 400.0 , 400.0
112 -1.830 -0.004 -7.187 0.197 -4.026 1000.0 , 1994.8
240 0.087 -0.070 -1.292 0.112 0.131 400.0 , 400.0
113 -1.379 -0.004 -7.076 0.196 -3.033 1000.0 , 1994.8
241 0.129 0.070 -1.292 -0.098 0.194 400.0 , 400.0
114 -1.828 -2.271 -7.187 18.374 -4.022 1000.0 , 1631.7
242 0.087 0.070 -1.292 -0.098 0.131 400.0 , 400.0
115 -1.614 -0.068 -7.305 0.793 -3.551 1000.0 , 1982.4
F4 211 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
116 -1.614 0.061 -7.305 -0.374 -3.551 1000.0 , 2006.6
212 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
117 -2.046 -0.068 -7.501 0.785 -4.501 1000.0 , 1982.7
213 0.195 0.000 -2.037 0.011 0.292 400.0 , 400.0
118 -2.046 0.061 -7.501 -0.382 -4.501 1000.0 , 2006.7
214 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
119 -1.765 -0.220 -7.373 2.152 -3.883 1000.0 , 1954.3
215 0.250 -0.021 -2.107 0.043 0.375 400.0 , 400.0
120 -1.895 -0.220 -7.432 2.150 -4.169 1000.0 , 1954.4
216 0.250 0.021 -2.107 -0.021 0.375 400.0 , 400.0
121 -1.765 0.212 -7.373 -1.738 -3.883 1000.0 , 2034.8
217 0.110 -0.021 -2.107 0.043 0.165 400.0 , 400.0 F1 S1
122 -1.895 0.212 -7.432 -1.740 -4.169 1000.0 , 2034.8
218 0.110 0.021 -2.107 -0.021 0.165 400.0 , 400.0
123 -0.921 -0.003 -5.280 0.147 -2.027 1000.0 , 1995.9
219 0.201 -0.070 -2.107 0.116 0.302 400.0 , 400.0
124 -1.371 -2.270 -5.390 18.324 -3.016 1000.0 , 1613.9
220 0.159 -0.070 -2.107 0.116 0.239 400.0 , 400.0
125 -1.156 -0.068 -5.508 0.744 -2.544 1000.0 , 1982.8
221 0.201 0.070 -2.107 -0.094 0.302 400.0 , 400.0
126 -1.156 0.062 -5.508 -0.423 -2.544 1000.0 , 2008.3
222 0.159 0.070 -2.107 -0.094 0.239 400.0 , 400.0
127 -1.588 -0.068 -5.704 0.736 -3.495 1000.0 , 1983.1
223 0.191 0.000 -2.037 0.011 0.287 400.0 , 400.0
128 -1.588 0.062 -5.704 -0.431 -3.495 1000.0 , 2008.4
224 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
129 -1.308 -0.219 -5.577 2.103 -2.877 1000.0 , 1953.3
225 0.233 -0.016 -2.090 0.035 0.349 400.0 , 400.0
130 -1.437 -0.219 -5.635 2.101 -3.162 1000.0 , 1953.4
226 0.233 0.016 -2.090 -0.013 0.349 400.0 , 400.0
131 -1.308 0.213 -5.577 -1.787 -2.877 1000.0 , 2038.0
227 0.128 -0.016 -2.090 0.035 0.191 400.0 , 400.0
132 -1.437 0.213 -5.635 -1.790 -3.162 1000.0 , 2038.0
228 0.128 0.016 -2.090 -0.013 0.191 400.0 , 400.0
229 0.196 -0.052 -2.090 0.090 0.294 400.0 , 400.0
230 0.164 -0.052 -2.090 0.090 0.246 400.0 , 400.0
231 0.196 0.052 -2.090 -0.068 0.294 400.0 , 400.0
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 48 Foundation Client : PT. Pupuk Sriwidj... Page 49
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 50 Foundation Client : PT. Pupuk Sriwidj... Page 51
P.F = Passive Force (apply only in case checked passive force, mark by P )
Group 1 - F1 Unit ( tonf ) Fz My X(i) Mx Y(i)
q1,q2 =
Ft.Name Dir. L.Comb. ( Fz + P.F ) / Fx + Fy
2 2
Fs(i) Result Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
F1 Bi-Axial 234 0.5 21.08 / 1.69 = 6.24 2 OK
by following formula
L
q(x) width(x) X dx
Group 2 - F2 Unit ( tonf ) Px = 0 L
0
q(x) width(x) dx
( Fz + P.F ) / Fx + Fy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result P= L
0
q(x) width(x) dx
F2 Bi-Axial 234 0.5 21.17 / 1.81 = 5.85 2 OK
Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result F2 8.000 2.000 4.000 10.6667 2.6667
X 234 -21.07 / -2.01 = 10.48 1.5 OK F3 0.640 0.800 0.800 0.0341 0.0341
F1
Y 234 -42.15 / -11.46 = 3.68 1.5 OK F4 0.640 0.800 0.800 0.0341 0.0341
Group 3 - F3
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m2 )
Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result
F3 212 0.000 6.476 0.014 0.832 6.5 6.7 99.64 / 80 % OK
F4 212 0.000 6.476 0.014 0.832 6.5 6.7 99.64 / 80 % OK
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 52 Foundation Client : PT. Pupuk Sriwidj... Page 53
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 54 Foundation Client : PT. Pupuk Sriwidj... Page 55
114 4000.00 2000.00 7.381 18.313 7.381 130 800.00 800.00 0.974 0.20 0.974
115 4000.00 2000.00 7.695 0.725 7.695 131 800.00 800.00 0.974 0.29 0.974
116 4000.00 2000.00 7.695 -0.442 7.695 132 800.00 800.00 0.974 0.20 0.974
117 4000.00 2000.00 7.499 0.733 7.499 111 800.00 800.00 1.351 0.015 1.351
118 4000.00 2000.00 7.499 -0.434 7.499 112 800.00 800.00 1.166 0.013 1.166
119 4000.00 2000.00 7.627 2.090 7.627 113 800.00 800.00 1.166 0.013 1.166
120 4000.00 2000.00 7.568 2.092 7.568 114 800.00 800.00 1.166 0.013 1.166
121 4000.00 2000.00 7.627 -1.801 7.627 115 800.00 800.00 1.266 0.058 1.266
122 4000.00 2000.00 7.568 -1.798 7.568 116 800.00 800.00 1.266 -0.032 1.266
123 4000.00 2000.00 5.646 0.103 5.646 117 800.00 800.00 1.266 0.058 1.266
124 4000.00 2000.00 5.536 18.279 5.536 118 800.00 800.00 1.266 -0.032 1.266
125 4000.00 2000.00 5.850 0.691 5.850 119 800.00 800.00 1.266 0.163 1.266
126 4000.00 2000.00 5.850 -0.476 5.850 120 800.00 800.00 1.266 0.163 1.266
127 4000.00 2000.00 5.654 0.699 5.654 121 800.00 800.00 1.266 -0.137 1.266
S1 Y
128 4000.00 2000.00 5.654 -0.468 5.654 122 800.00 800.00 1.266 -0.137 1.266
129 4000.00 2000.00 5.781 2.056 5.781 123 800.00 800.00 0.874 0.010 0.874
130 4000.00 2000.00 5.723 2.058 5.723 124 800.00 800.00 0.874 0.010 0.874
131 4000.00 2000.00 5.781 -1.835 5.781 125 800.00 800.00 0.974 0.055 0.974
132 4000.00 2000.00 5.722 -1.832 5.722 126 800.00 800.00 0.974 -0.035 0.974
127 800.00 800.00 0.974 0.055 0.974
Group 3 - F3 Unit( mm , tonf , tonf-m )
128 800.00 800.00 0.974 -0.035 0.974
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q 129 800.00 800.00 0.974 0.160 0.974
111 800.00 800.00 1.351 0.38 1.351
130 800.00 800.00 0.974 0.160 0.974
112 800.00 800.00 1.166 0.32 1.166
131 800.00 800.00 0.974 -0.140 0.974
113 800.00 800.00 1.166 0.36 1.166
132 800.00 800.00 0.974 -0.140 0.974
114 800.00 800.00 1.166 0.32 1.166
111 800.00 800.00 1.351 0.38 1.351
115 800.00 800.00 1.266 0.47 1.266
112 800.00 800.00 1.166 0.32 1.166
116 800.00 800.00 1.266 0.47 1.266
113 800.00 800.00 1.166 0.36 1.166
117 800.00 800.00 1.266 0.17 1.266
114 800.00 800.00 1.166 0.32 1.166
118 800.00 800.00 1.266 0.17 1.266
115 800.00 800.00 1.266 0.47 1.266
119 800.00 800.00 1.266 0.37 1.266
116 800.00 800.00 1.266 0.47 1.266
F3 S1 X 120 800.00 800.00 1.266 0.28 1.266
117 800.00 800.00 1.266 0.17 1.266
121 800.00 800.00 1.266 0.37 1.266
118 800.00 800.00 1.266 0.17 1.266
122 800.00 800.00 1.266 0.28 1.266 F4 S1 X
119 800.00 800.00 1.266 0.37 1.266
123 800.00 800.00 0.874 0.28 0.874
120 800.00 800.00 1.266 0.28 1.266
124 800.00 800.00 0.874 0.24 0.874
121 800.00 800.00 1.266 0.37 1.266
125 800.00 800.00 0.974 0.39 0.974
122 800.00 800.00 1.266 0.28 1.266
126 800.00 800.00 0.974 0.39 0.974
123 800.00 800.00 0.874 0.28 0.874
127 800.00 800.00 0.974 0.09 0.974
124 800.00 800.00 0.874 0.24 0.874
128 800.00 800.00 0.974 0.09 0.974
125 800.00 800.00 0.974 0.39 0.974
129 800.00 800.00 0.974 0.29 0.974
126 800.00 800.00 0.974 0.39 0.974
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 56 Foundation Client : PT. Pupuk Sriwidj... Page 57
112 800.00 800.00 1.166 0.013 1.166 (Flexure) (Shear) fck fy1 fy2 f_cl f_clt f_clb
113 800.00 800.00 1.166 0.013 1.166 0.85 0.8 250.00 4000.00 4000.00 50.0 50.0 75.0
114 800.00 800.00 1.166 0.013 1.166
115 800.00 800.00 1.266 0.058 1.266
5.2 REQUIRED REINFORCEMENT
116 800.00 800.00 1.266 -0.032 1.266
5.2.1 Reinforcement Formula
117 800.00 800.00 1.266 0.058 1.266
- Shrinkage And Temperature Reinforcement ---- ACI CODE 7.12.2
118 800.00 800.00 1.266 -0.032 1.266
As As1 = fac b h , fac = following
119 800.00 800.00 1.266 0.163 1.266 Area of shrinkage and temperature reinforcement shall provide at least the following ratio
120 800.00 800.00 1.266 0.163 1.266 of reinforcement area to gross concrete area, but not less than 0.0014
121 800.00 800.00 1.266 -0.137 1.266 (a) Slabs where Grade 40 or 50 deformed bars are used ................................................................................0.0020
S1 Y (b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used............................................0.0018
122 800.00 800.00 1.266 -0.137 1.266
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
123 800.00 800.00 0.874 0.010 0.874 0.0018 60,000
strain of 0.35 percent is used ..............................................................................................................
fy
124 800.00 800.00 0.874 0.010 0.874
- Required Reinforcement by Analysis
125 800.00 800.00 0.974 0.055 0.974 As As2 = .req b d
126 800.00 800.00 0.974 -0.035 0.974 - At every section of flexural members where tensile reinforcement is required
127 800.00 800.00 0.974 0.055 0.974 3 fck 200
As (As5 = bw d) (As4 = b d) ---- ACI Eq (10-3)
fy fy
128 800.00 800.00 0.974 -0.035 0.974
- The requirements of Eq (10-3) need not be applied, if every section As provided is
129 800.00 800.00 0.974 0.160 0.974 at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
130 800.00 800.00 0.974 0.160 0.974 As3 = 1.333 .req b d
131 800.00 800.00 0.974 -0.140 0.974 Asmax = 0.75 b b d
fck 0.003 Es
132 800.00 800.00 0.974 -0.140 0.974 b = 0.85 1 fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
bd
2 , = 0.85 , .req =
fy ( 1- 1-
0.85fck )
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 58 Foundation Client : PT. Pupuk Sriwidj... Page 59
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 60 Foundation Client : PT. Pupuk Sriwidj... Page 61
4000
S1 1
116 bottom 0.278 0.705 0.0002
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm ) 3
935
S1
116 bottom 2.700 0.380 0.507 7.574 6.774 43.780
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result 410
132 top 14.326 2.700 OK
S1
116 bottom 14.326 2.700 OK - X direction One-Way Shear (Unit Width)
- Y direction (Unit Width) Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 117 410 315.5 1000 21.16 1.062 OK
2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
- Y direction One-Way Shear (Unit Width)
132 top 5 - D19 @ 200 0.400 1.000 22.135 14.326
S1 Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
120 botom 5 - D19 @ 200 0.200 1.000 19.635 14.326
S1 120 935 296.4 1000 19.879 1.157 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req
132 top - - -
S1
120 bottom 0.071 0.217 0.0001
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 62 Foundation Client : PT. Pupuk Sriwidj... Page 63
Unit : mm
4000
5 800
7
935
800
1590
Group 3 - F3
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 111 0 215.4 1000 14.452 0 OK
Footing Name : F3 GroupType : Isolated PileType : False
- Y direction One-Way Shear (Unit Width)
Unit : mm Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
800 S1 111 0 196.3 1000 13.171 0 OK
800
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 64 Foundation Client : PT. Pupuk Sriwidj... Page 65
5.4 TWO WAY SHEAR FORCE Ft.Name F3 Punching Area 3787.787 cm2
5.4.1 Two-Way Shear Formula 800 Pr.Name 39 Ratio Shade 0.408
Vu = Fz Shade Ratio
(a) Vc1 = 0.8 2 (1 + 2/ c) fck bo d (eq 11-33) <- Vc1 Shape Rectangle Vc1 106.734 tonf
(b) Vc2 = 0.8 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
L.Comb. 111 Vc2 97.852 tonf
(c) Vc3 = 0.8 4 fck bo d (eq 11-35) <- Vc3
800
Vc = Min( Vc1 , Vc2 , Vc3) ACI 318-05 CODE 11.12.2.1 Pl 400 mm Vc3 71.156 tonf
Vu Vc , then OK
39 Pw 400 mm Vc 71.156 tonf
where
= ratio of long side to short side of the column, concentrated load or reaction area bo / d 2461.8 / 215.45 mm Vu 0.551 tonf
s = 40 for interior colimns
= 30 for edge columns c / s 1 / 40 Result OK
= 20 for corner columns
bo = perimeter of critical section Ft.Name F4 Punching Area 3787.787 cm2
Footing Area - Punching Area
Shade Ratio = 800 Pr.Name 45 Ratio Shade 0.408
Footing Area
800
Pl 400 mm Vc3 71.156 tonf
2000 Pr.Name 3 Ratio Shade 0.912
45 Pw 400 mm Vc 71.156 tonf
Shape Rectangle Vc1 200.472 tonf
bo / d 2461.8 / 215.45 mm Vu 0.551 tonf
L.Comb. 114 Vc2 204.633 tonf
c / s 1 / 40 Result OK
4000
1
Pl 550 mm Vc3 142.270 tonf
3
Pw 500 mm Vc 142.270 tonf
c / s 1.1 / 40 Result OK
5
Pl 550 mm Vc3 142.270 tonf
7
Pw 500 mm Vc 142.270 tonf
c / s 1.1 / 40 Result OK
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014
FOUNDATION LISTS
One-Stop Solution for Foundation Group Name No. Description No. Description
F1 1 F1
F2 2 F2
TITLE DESCRIPTION
PROJECT/JOB NO. 14-0602
PROJECT/JOB NAME NPK Fusion Plan
CLIENT NAME PT. Pupuk Sriwidjaja
SITE NAME Palembang
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Piperack 2 4-12-14 span 20m
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 2 Foundation Client : PT. Pupuk Sriwidj... Page 3
CONTENTS 1. GENERAL
1.1 CODE & STANDARD
1. GENERAL Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
1.1 CODE & STANDARD
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
1.2 MATERIALS & UNIT WEIGHT
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
1.3 SUBSOIL CONDITION & SAFETY FACTORS Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
1.4 LOAD COMBINATION
1.2 MATERIALS & UNIT WEIGHT
2. DRAWING Items Value
2.1 LOCATION PLAN Concrete (fck : compressive strength) 250.000 kgf/cm2
Lean Concrete (Lfck : compressive strength) 0.000 kgf/cm2
2.2 DETAIL SKETCH
Reinforcement (D10 ~ D16 , yield strength) 4000.000 kgf/cm2
Reinforcement (D19 ~ , yield strength) 4000.000 kgf/cm2
3. FOUNDATION DATA
Rs (Soil unit weight) 1.800 ton/m3
3.1 FOOTING DATA Rc (Concrete unit weight) 2.400 ton/m3
3.2 PIER DATA Es (Steel Modulus of Elasticity) 2.000 106 kgf/cm2
5.1 DESIGN MOMENT AND SHEAR FORCE Cu (Undrained cohesion) Clay , 0 tonf/m2
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 4 Foundation Client : PT. Pupuk Sriwidj... Page 5
Safety factor against sliding for the SL2(FS2) 2 234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
Friction factor () 0.5 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
235
Thermal Load (tf)
.6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
1.4 LOAD COMBINATION 236
Thermal Load (tf)
1.4.1 Group - F1 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F1 Thermal Load (tf)
Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
232 127
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf) .9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
128
Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 6 Foundation Client : PT. Pupuk Sriwidj... Page 7
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
129 232
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
130
Thermal Load (tf)
234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 235
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132 .6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 236
Thermal Load (tf)
1.4.2 Group - F2 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F2 Thermal Load (tf)
Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)
223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 8 Foundation Client : PT. Pupuk Sriwidj... Page 9
127
.9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
Thermal Load (tf)
2. DRAWING
.9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 2.1 LOCATION PLAN
128
Thermal Load (tf)
2.2 DETAIL SKETCH
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
129
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
130
Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132
Thermal Load (tf)
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 Page 10
REFERENCE DWGS
NO. DWG NO. DWG TITLE
NOTES
* OUTPUT UNIT : mm
A01 A02
20000
1 5
01
3 7
NPK Fusion Plan PROJECT
F1 F2
AS SHOWN 14-0602
12/15/2014 Page 11
OUTPUT UNIT : mm
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
1800
900x2
NOTES
* OUTPUT UNIT : mm
CL FOOTING
3000
1000x3
NPK Fusion Plan PROJECT
3
FOUNDATION PLAN
SQUAD CHECK
12/15/2014 Page 13
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
TOP BOTTOM
50
TYP.
NOTES
* OUTPUT UNIT : mm
D16@200
D16@200
REINFORCEMENT PLAN
SQUAD CHECK
1600
1
400
3
LEAN CONC. 50 THK
ELEVATION S1 - X
OUTPUT UNIT : mm
1 3
450 450
50 50
200 200 200 200
TYP. TYP.
50 50
200
200
50
50
D10 D10
450
450
200
200
12-D16 12-D16
75 PR.
75 PR.
30 GR.
30 GR.
50
50
50
50
D16 D16
1800
1800
D10
D10
@200
@200
100
100
OUTPUT UNIT : mm
12/15/2014 Page 17
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
1800
900x2
NOTES
* OUTPUT UNIT : mm
5
CL FOOTING
3000
1000x3
FOUNDATION PLAN
SQUAD CHECK
REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING
TOP BOTTOM
50
TYP.
NOTES
* OUTPUT UNIT : mm
D16@200
D16@200
NPK Fusion Plan PROJECT
REINFORCEMENT PLAN
SQUAD CHECK
12/15/2014 Page 19
7
1600
5
400
7
LEAN CONC. 50 THK
ELEVATION S1 - X
OUTPUT UNIT : mm
12/15/2014
3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name F1
Ft. Type MAT
1800 Area 5.400 m2
Ft. Thickness 400.00 mm
Ft. Volume 2.160 m3
Ft. Weight 5.184 tonf
Soil Height 1600.00 mm
Soil Volume 7.992 m3
1 Soil Weight 14.386 tonf
3000
50
Buoyancy Not Consider
200 200 50 @200 100
Self Weight (except Pr.SW) 19.570 tonf
50 D10
200
3
50
200
1800
1600
7
D10
400
TYP.
12-D16
D16
450
3000
Buoyancy Not Consider
50
200
7
5
D10
Item No.
1800
TYP.
1600
50
12-D16
D16
400
450
75 PR.
The Center of gravity (0,0) mm
30 GR.
F2
1800
12/15/2014
450
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 22 Foundation Client : PT. Pupuk Sriwidj... Page 23
Off X , Off Y is offset position from the Center of the footing 9 Piping Operating P(o)
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter 10 Thermal Load (tf)
Area is pier concrete area
Unit( tonf , tonf-m )
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : tonf , Area : m2 )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0.000 0.000 -0.875 0.000 0.000
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
2 -0.199 0.001 -0.668 0.000 0.000
1 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 500.000
F1 3 0.000 0.000 0.000 0.000 0.000
3 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 -500.000
4 0.096 0.000 0.031 0.000 0.000
5 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 500.000
F2 5 0.001 -0.717 3.541 0.000 0.000
7 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 -500.000 1
6 0.083 0.000 0.048 0.000 0.000
7 0.000 -0.166 0.958 0.000 0.000
3.3 SECTION DATA 8 0.000 0.000 -0.082 0.000 0.000
9 -0.274 0.001 -0.652 0.000 0.000
Ft.Name / Sec.Name F1 / S1 Ft.Name / Sec.Name F2 / S1
10 0.203 -0.001 0.122 0.000 0.000
Unit : mm Unit : mm F1 1 0.000 0.000 -0.875 0.000 0.000
1800 1800 2 -0.206 -0.001 -0.668 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.095 0.000 0.030 0.000 0.000
5 0.000 -0.024 -3.541 0.000 0.000
3
6 0.083 0.000 0.047 0.000 0.000
3000
3000
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 24 Foundation Client : PT. Pupuk Sriwidj... Page 25
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 26 Foundation Client : PT. Pupuk Sriwidj... Page 27
239 -0.161 -0.001 -1.474 0.000 0.000 232 0.663 0.090 -1.980 0.000 0.000
240 -0.196 -0.001 -1.493 0.000 0.000 233 0.502 0.002 -0.896 0.000 0.000
241 -0.161 -0.002 -0.133 0.000 0.000 234 0.405 -0.715 2.676 0.000 0.000
242 -0.196 -0.002 -0.152 0.000 0.000 235 0.464 -0.033 -0.755 0.000 0.000
111 -0.335 -0.002 -1.493 0.000 0.000 236 0.464 0.037 -1.157 0.000 0.000
112 -0.358 -0.002 -1.508 0.000 0.000 237 0.347 -0.033 -0.688 0.000 0.000
113 -0.206 -0.002 -1.460 0.000 0.000 238 0.347 0.037 -1.090 0.000 0.000
114 -0.358 -0.041 -7.174 0.000 0.000 239 0.423 -0.114 -0.262 0.000 0.000
115 -0.275 -0.002 -1.833 0.000 0.000 240 0.388 -0.114 -0.242 0.000 0.000
116 -0.275 -0.003 -1.258 0.000 0.000 241 0.423 0.118 -1.603 0.000 0.000
117 -0.441 -0.002 -1.927 0.000 0.000 242 0.388 0.118 -1.583 0.000 0.000
118 -0.441 -0.003 -1.352 0.000 0.000 111 0.867 0.004 -1.752 0.000 0.000
119 -0.333 -0.001 -2.536 0.000 0.000 112 0.811 0.004 -1.730 0.000 0.000
120 -0.382 -0.001 -2.564 0.000 0.000 113 0.965 0.004 -1.780 0.000 0.000
121 -0.333 -0.003 -0.620 0.000 0.000 114 0.810 -1.144 3.935 0.000 0.000
122 -0.382 -0.003 -0.649 0.000 0.000 115 0.894 -0.046 -1.573 0.000 0.000
123 -0.116 -0.002 -1.083 0.000 0.000 116 0.894 0.053 -2.148 0.000 0.000
124 -0.268 -0.040 -6.797 0.000 0.000 117 0.728 -0.046 -1.477 0.000 0.000
125 -0.185 -0.002 -1.456 0.000 0.000 118 0.728 0.053 -2.052 0.000 0.000
126 -0.185 -0.002 -0.881 0.000 0.000 119 0.836 -0.162 -0.869 0.000 0.000
127 -0.351 -0.002 -1.550 0.000 0.000 120 0.786 -0.162 -0.840 0.000 0.000
128 -0.351 -0.002 -0.975 0.000 0.000 121 0.836 0.170 -2.785 0.000 0.000
129 -0.243 -0.001 -2.159 0.000 0.000 122 0.786 0.170 -2.756 0.000 0.000
130 -0.293 -0.001 -2.187 0.000 0.000 123 0.762 0.003 -1.347 0.000 0.000
131 -0.243 -0.003 -0.243 0.000 0.000 124 0.607 -1.145 4.368 0.000 0.000
132 -0.293 -0.003 -0.271 0.000 0.000 125 0.691 -0.047 -1.140 0.000 0.000
126 0.691 0.053 -1.715 0.000 0.000
Group 2 - F2 Unit( tonf , tonf-m ) 127 0.525 -0.047 -1.044 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 0.525 0.053 -1.619 0.000 0.000
F2 211 0.676 0.003 -1.442 0.000 0.000 129 0.633 -0.163 -0.436 0.000 0.000
212 0.676 0.003 -1.442 0.000 0.000 130 0.583 -0.163 -0.407 0.000 0.000
213 0.772 0.003 -1.473 0.000 0.000 131 0.633 0.169 -2.352 0.000 0.000
214 0.675 -0.714 2.099 0.000 0.000 132 0.583 0.169 -2.323 0.000 0.000
215 0.734 -0.032 -1.332 0.000 0.000 211 0.704 -0.002 -1.483 0.000 0.000
216 0.734 0.038 -1.734 0.000 0.000 212 0.704 -0.002 -1.483 0.000 0.000
217 0.618 -0.032 -1.265 0.000 0.000 213 0.799 -0.002 -1.513 0.000 0.000
218 0.618 0.038 -1.667 0.000 0.000 214 0.704 -0.026 -5.024 0.000 0.000
219 0.693 -0.113 -0.839 0.000 0.000 215 0.762 -0.002 -1.776 0.000 0.000
220 0.659 -0.113 -0.819 0.000 0.000 216 0.762 -0.002 -1.374 0.000 0.000
5 221 0.693 0.119 -2.180 0.000 0.000 217 0.646 -0.002 -1.710 0.000 0.000
222 0.659 0.119 -2.160 0.000 0.000 218 0.646 -0.002 -1.308 0.000 0.000
223 0.748 0.003 -1.465 0.000 0.000 7 219 0.721 -0.001 -2.222 0.000 0.000
224 0.675 -0.535 1.214 0.000 0.000 220 0.687 -0.001 -2.203 0.000 0.000
225 0.720 -0.023 -1.359 0.000 0.000 221 0.721 -0.003 -0.881 0.000 0.000
226 0.720 0.029 -1.661 0.000 0.000 222 0.687 -0.003 -0.861 0.000 0.000
227 0.632 -0.023 -1.309 0.000 0.000 223 0.775 -0.002 -1.505 0.000 0.000
228 0.632 0.029 -1.611 0.000 0.000 224 0.704 -0.020 -4.139 0.000 0.000
229 0.689 -0.084 -0.990 0.000 0.000 225 0.748 -0.002 -1.703 0.000 0.000
230 0.663 -0.084 -0.975 0.000 0.000 226 0.748 -0.002 -1.401 0.000 0.000
231 0.689 0.090 -1.996 0.000 0.000 227 0.660 -0.002 -1.653 0.000 0.000
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 28 Foundation Client : PT. Pupuk Sriwidj... Page 29
228 0.660 -0.002 -1.352 0.000 0.000 219 -0.253 -0.115 -1.450 0.253 -0.556
229 0.717 -0.001 -2.037 0.000 0.000 220 -0.287 -0.115 -1.470 0.253 -0.632
230 0.691 -0.001 -2.023 0.000 0.000 221 -0.253 0.117 -2.791 -0.258 -0.556
231 0.717 -0.003 -1.032 0.000 0.000 222 -0.287 0.117 -2.811 -0.258 -0.632
232 0.691 -0.003 -1.017 0.000 0.000 223 -0.198 0.001 -2.050 -0.002 -0.436
233 0.517 -0.001 -0.920 0.000 0.000 224 -0.269 -0.537 0.583 1.181 -0.592
234 0.422 -0.025 -4.431 0.000 0.000 225 -0.226 -0.025 -1.940 0.055 -0.498
235 0.481 -0.001 -1.183 0.000 0.000 226 -0.226 0.027 -2.242 -0.060 -0.498
236 0.481 -0.001 -0.780 0.000 0.000 227 -0.314 -0.025 -1.990 0.055 -0.690
237 0.364 -0.001 -1.117 0.000 0.000 228 -0.314 0.027 -2.292 -0.060 -0.690
238 0.364 -0.001 -0.715 0.000 0.000 229 -0.257 -0.086 -1.605 0.190 -0.565
239 0.440 -0.001 -1.629 0.000 0.000 230 -0.283 -0.086 -1.620 0.190 -0.623
240 0.405 -0.001 -1.609 0.000 0.000 231 -0.257 0.088 -2.611 -0.194 -0.565
241 0.440 -0.002 -0.288 0.000 0.000 232 -0.283 0.088 -2.626 -0.194 -0.623
242 0.405 -0.002 -0.268 0.000 0.000 233 -0.066 0.001 -1.213 -0.001 -0.145
111 0.903 -0.002 -1.809 0.000 0.000 234 -0.161 -0.716 2.297 1.576 -0.354
112 0.845 -0.002 -1.780 0.000 0.000 235 -0.104 -0.034 -1.066 0.075 -0.229
113 0.997 -0.002 -1.828 0.000 0.000 236 -0.104 0.035 -1.469 -0.078 -0.229
114 0.845 -0.041 -7.445 0.000 0.000 237 -0.220 -0.034 -1.134 0.075 -0.484
115 0.928 -0.002 -2.198 0.000 0.000 238 -0.220 0.035 -1.536 -0.078 -0.484
116 0.928 -0.003 -1.623 0.000 0.000 239 -0.145 -0.116 -0.620 0.254 -0.318
117 0.762 -0.002 -2.104 0.000 0.000 240 -0.179 -0.116 -0.641 0.254 -0.395
118 0.762 -0.003 -1.529 0.000 0.000 241 -0.145 0.117 -1.962 -0.257 -0.318
119 0.870 -0.001 -2.836 0.000 0.000 242 -0.179 0.117 -1.982 -0.257 -0.395
120 0.820 -0.001 -2.808 0.000 0.000 111 -0.298 0.001 -2.635 -0.002 -0.656
121 0.870 -0.003 -0.920 0.000 0.000 112 -0.324 0.001 -2.487 -0.003 -0.713
122 0.820 -0.003 -0.892 0.000 0.000 113 -0.170 0.001 -2.438 -0.003 -0.375
123 0.786 -0.002 -1.383 0.000 0.000 114 -0.322 -1.146 3.178 2.521 -0.709
124 0.634 -0.040 -7.000 0.000 0.000 115 -0.241 -0.049 -2.234 0.107 -0.530
125 0.717 -0.002 -1.753 0.000 0.000 116 -0.241 0.051 -2.809 -0.112 -0.530
126 0.717 -0.002 -1.178 0.000 0.000 117 -0.407 -0.049 -2.330 0.107 -0.895
127 0.551 -0.002 -1.659 0.000 0.000 118 -0.407 0.051 -2.905 -0.112 -0.895
128 0.551 -0.002 -1.084 0.000 0.000 119 -0.299 -0.165 -1.597 0.363 -0.658
129 0.658 -0.001 -2.391 0.000 0.000 120 -0.349 -0.165 -1.626 0.363 -0.768
130 0.609 -0.001 -2.363 0.000 0.000 121 -0.299 0.167 -3.513 -0.368 -0.658
131 0.658 -0.003 -0.475 0.000 0.000 122 -0.349 0.167 -3.542 -0.368 -0.768
132 0.609 -0.003 -0.447 0.000 0.000 123 -0.089 0.001 -1.816 -0.002 -0.197
124 -0.241 -1.146 3.800 2.522 -0.531
125 -0.160 -0.049 -1.612 0.108 -0.352
3.5.2 Load Combination in Footing Bottom (With Pier SW) 126 -0.160 0.051 -2.187 -0.112 -0.352
Group 1 - F1 Unit( tonf , tonf-m ) 127 -0.326 -0.049 -1.708 0.108 -0.717
128 -0.326 0.051 -2.283 -0.112 -0.717
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F1 211 -0.270 0.001 -2.073 -0.002 -0.594 129 -0.218 -0.165 -0.975 0.363 -0.480
212 -0.270 0.001 -2.073 -0.002 -0.594 130 -0.268 -0.165 -1.004 0.363 -0.589
213 -0.174 0.001 -2.042 -0.002 -0.383 131 -0.218 0.167 -2.891 -0.367 -0.480
214 -0.269 -0.716 1.468 1.575 -0.592 132 -0.268 0.167 -2.920 -0.367 -0.589
1 211 -0.298 -0.002 -2.132 0.004 -0.656
215 -0.212 -0.034 -1.895 0.074 -0.466
216 -0.212 0.036 -2.298 -0.079 -0.466 212 -0.298 -0.002 -2.132 0.004 -0.656
3
217 -0.328 -0.034 -1.963 0.074 -0.722 213 -0.203 -0.002 -2.102 0.004 -0.447
218 -0.328 0.036 -2.365 -0.079 -0.722 214 -0.298 -0.026 -5.673 0.057 -0.656
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 30 Foundation Client : PT. Pupuk Sriwidj... Page 31
215 -0.240 -0.002 -2.359 0.004 -0.528 Group 2 - F2 Unit( tonf , tonf-m )
216 -0.240 -0.002 -1.957 0.005 -0.528 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
217 -0.356 -0.002 -2.425 0.004 -0.783 F2 211 0.676 0.003 -2.317 -0.007 1.487
218 -0.356 -0.002 -2.022 0.005 -0.783 212 0.676 0.003 -2.317 -0.007 1.487
219 -0.281 -0.001 -2.851 0.003 -0.617 213 0.772 0.003 -2.348 -0.007 1.698
220 -0.315 -0.001 -2.871 0.003 -0.694 214 0.675 -0.714 1.224 1.571 1.485
221 -0.281 -0.003 -1.510 0.006 -0.617 215 0.734 -0.032 -2.207 0.070 1.615
222 -0.315 -0.003 -1.530 0.006 -0.694 216 0.734 0.038 -2.609 -0.083 1.615
223 -0.227 -0.002 -2.109 0.004 -0.499 217 0.618 -0.032 -2.139 0.070 1.359
224 -0.298 -0.020 -4.788 0.044 -0.656 218 0.618 0.038 -2.542 -0.083 1.359
225 -0.254 -0.002 -2.302 0.004 -0.560 219 0.693 -0.113 -1.714 0.249 1.526
226 -0.254 -0.002 -2.000 0.005 -0.560 220 0.659 -0.113 -1.694 0.249 1.449
227 -0.342 -0.002 -2.351 0.004 -0.751 221 0.693 0.119 -3.055 -0.262 1.526
228 -0.342 -0.002 -2.050 0.005 -0.751 222 0.659 0.119 -3.035 -0.262 1.449
229 -0.285 -0.001 -2.671 0.003 -0.627 223 0.748 0.003 -2.340 -0.007 1.646
230 -0.311 -0.001 -2.686 0.003 -0.684 224 0.675 -0.535 0.339 1.176 1.486
231 -0.285 -0.003 -1.666 0.006 -0.627 225 0.720 -0.023 -2.234 0.051 1.583
232 -0.311 -0.003 -1.680 0.006 -0.684 226 0.720 0.029 -2.536 -0.064 1.583
233 -0.084 -0.001 -1.249 0.003 -0.184 227 0.632 -0.023 -2.184 0.051 1.391
234 -0.179 -0.025 -4.820 0.055 -0.393 228 0.632 0.029 -2.486 -0.064 1.391
235 -0.121 -0.001 -1.506 0.002 -0.266 229 0.689 -0.084 -1.864 0.185 1.516
236 -0.121 -0.001 -1.104 0.003 -0.266 230 0.663 -0.084 -1.849 0.185 1.458
237 -0.237 -0.001 -1.572 0.002 -0.521 231 0.689 0.090 -2.870 -0.198 1.516
238 -0.237 -0.001 -1.170 0.003 -0.521 232 0.663 0.090 -2.855 -0.198 1.458
239 -0.161 -0.001 -1.999 0.001 -0.355 233 0.502 0.002 -1.421 -0.004 1.104
240 -0.196 -0.001 -2.018 0.001 -0.432 234 0.405 -0.715 2.151 1.573 0.890
241 -0.161 -0.002 -0.657 0.004 -0.355 5
235 0.464 -0.033 -1.280 0.073 1.020
242 -0.196 -0.002 -0.677 0.004 -0.432 236 0.464 0.037 -1.682 -0.081 1.020
111 -0.335 -0.002 -2.717 0.005 -0.737 237 0.347 -0.033 -1.213 0.073 0.765
112 -0.358 -0.002 -2.558 0.005 -0.787 238 0.347 0.037 -1.615 -0.081 0.765
113 -0.206 -0.002 -2.510 0.005 -0.452 239 0.423 -0.114 -0.787 0.252 0.931
114 -0.358 -0.041 -8.224 0.090 -0.787 240 0.388 -0.114 -0.767 0.252 0.854
115 -0.275 -0.002 -2.883 0.005 -0.604 241 0.423 0.118 -2.128 -0.260 0.931
116 -0.275 -0.003 -2.308 0.006 -0.604 242 0.388 0.118 -2.108 -0.260 0.854
117 -0.441 -0.002 -2.977 0.005 -0.969 111 0.867 0.004 -2.976 -0.008 1.907
118 -0.441 -0.003 -2.402 0.006 -0.969 112 0.811 0.004 -2.780 -0.008 1.785
119 -0.333 -0.001 -3.586 0.003 -0.732 113 0.965 0.004 -2.830 -0.008 2.123
120 -0.382 -0.001 -3.614 0.003 -0.842 114 0.810 -1.144 2.885 2.516 1.781
121 -0.333 -0.003 -1.670 0.007 -0.732 115 0.894 -0.046 -2.623 0.102 1.967
122 -0.382 -0.003 -1.698 0.007 -0.842 116 0.894 0.053 -3.198 -0.117 1.967
123 -0.116 -0.002 -1.871 0.004 -0.256 117 0.728 -0.046 -2.527 0.102 1.602
124 -0.268 -0.040 -7.584 0.088 -0.590 118 0.728 0.053 -3.102 -0.117 1.602
125 -0.185 -0.002 -2.243 0.003 -0.407 119 0.836 -0.162 -1.919 0.357 1.839
126 -0.185 -0.002 -1.668 0.005 -0.407 120 0.786 -0.162 -1.890 0.357 1.730
127 -0.351 -0.002 -2.337 0.003 -0.773 121 0.836 0.170 -3.835 -0.373 1.839
128 -0.351 -0.002 -1.762 0.005 -0.773 122 0.786 0.170 -3.806 -0.373 1.730
129 -0.243 -0.001 -2.947 0.002 -0.535 123 0.762 0.003 -2.135 -0.006 1.676
130 -0.293 -0.001 -2.975 0.002 -0.645 124 0.607 -1.145 3.580 2.518 1.335
131 -0.243 -0.003 -1.031 0.006 -0.535 125 0.691 -0.047 -1.928 0.104 1.521
132 -0.293 -0.003 -1.059 0.006 -0.645 126 0.691 0.053 -2.503 -0.116 1.521
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 32 Foundation Client : PT. Pupuk Sriwidj... Page 33
127 0.525 -0.047 -1.832 0.104 1.156 123 0.786 -0.002 -2.170 0.004 1.728
128 0.525 0.053 -2.407 -0.116 1.156 124 0.634 -0.040 -7.788 0.088 1.394
129 0.633 -0.163 -1.224 0.359 1.393 125 0.717 -0.002 -2.540 0.003 1.577
130 0.583 -0.163 -1.195 0.359 1.284 126 0.717 -0.002 -1.966 0.005 1.577
131 0.633 0.169 -3.140 -0.371 1.393 127 0.551 -0.002 -2.446 0.003 1.211
132 0.583 0.169 -3.111 -0.371 1.284 128 0.551 -0.002 -1.872 0.005 1.211
211 0.704 -0.002 -2.358 0.004 1.549 129 0.658 -0.001 -3.178 0.002 1.449
212 0.704 -0.002 -2.358 0.004 1.549 130 0.609 -0.001 -3.150 0.002 1.339
213 0.799 -0.002 -2.388 0.004 1.758 131 0.658 -0.003 -1.262 0.006 1.449
214 0.704 -0.026 -5.899 0.057 1.549 132 0.609 -0.003 -1.234 0.006 1.339
215 0.762 -0.002 -2.651 0.004 1.677
216 0.762 -0.002 -2.248 0.005 1.677
217 0.646 -0.002 -2.585 0.004 1.421 3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
218 0.646 -0.002 -2.183 0.005 1.421 Load Combination of Elastic Condition
219 0.721 -0.001 -3.097 0.003 1.587 Group 1 - F1
220 0.687 -0.001 -3.077 0.003 1.510 - C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
221 0.721 -0.003 -1.756 0.006 1.587
222 0.687 -0.003 -1.736 0.006 1.510 Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
223 0.775 -0.002 -2.380 0.004 1.706 F1 211 -0.568 -0.001 -23.774 0.032 -1.250 900.0 , 1498.8
224 0.704 -0.020 -5.014 0.044 1.549 212 -0.568 -0.001 -23.774 0.032 -1.250 900.0 , 1498.8
225 0.748 -0.002 -2.577 0.004 1.645 213 -0.377 -0.001 -23.713 0.032 -0.829 900.0 , 1498.7
226 0.748 -0.002 -2.276 0.005 1.645
214 -0.567 -0.742 -23.774 5.203 -1.247 900.0 , 1349.8
227 0.660 -0.002 -2.528 0.004 1.453
228 0.660 -0.002 -2.226 0.005 1.453 215 -0.452 -0.036 -23.824 0.310 -0.994 900.0 , 1490.3
229 0.717 -0.001 -2.912 0.003 1.578 216 -0.452 0.034 -23.824 -0.245 -0.994 900.0 , 1507.2
230 0.691 -0.001 -2.897 0.003 1.520 217 -0.684 -0.036 -23.957 0.309 -1.505 900.0 , 1490.4
231 0.717 -0.003 -1.906 0.006 1.578
218 -0.684 0.034 -23.957 -0.245 -1.505 900.0 , 1507.2
232 0.691 -0.003 -1.892 0.006 1.520
7 219 -0.533 -0.116 -23.870 0.957 -1.173 900.0 , 1470.6
233 0.517 -0.001 -1.445 0.003 1.138
234 0.422 -0.025 -4.956 0.055 0.929 220 -0.603 -0.116 -23.910 0.957 -1.326 900.0 , 1470.7
235 0.481 -0.001 -1.708 0.002 1.057 221 -0.533 0.114 -23.870 -0.892 -1.173 900.0 , 1526.8
236 0.481 -0.001 -1.305 0.003 1.057 222 -0.603 0.114 -23.910 -0.892 -1.326 900.0 , 1526.8
237 0.364 -0.001 -1.642 0.002 0.801
223 -0.425 -0.001 -23.728 0.032 -0.934 900.0 , 1498.7
238 0.364 -0.001 -1.239 0.003 0.801
224 -0.567 -0.557 -23.774 3.910 -1.248 900.0 , 1387.1
239 0.440 -0.001 -2.154 0.001 0.968
240 0.405 -0.001 -2.134 0.001 0.891 225 -0.481 -0.027 -23.811 0.241 -1.058 900.0 , 1492.4
241 0.440 -0.002 -0.813 0.004 0.968 226 -0.481 0.025 -23.811 -0.176 -1.058 900.0 , 1505.1
242 0.405 -0.002 -0.793 0.004 0.891 227 -0.655 -0.027 -23.911 0.240 -1.441 900.0 , 1492.4
111 0.903 -0.002 -3.034 0.005 1.987
228 -0.655 0.025 -23.911 -0.176 -1.441 900.0 , 1505.1
112 0.845 -0.002 -2.829 0.005 1.859
113 0.997 -0.002 -2.877 0.005 2.193 229 -0.542 -0.088 -23.846 0.726 -1.192 900.0 , 1477.6
114 0.845 -0.041 -8.495 0.090 1.859 230 -0.594 -0.088 -23.876 0.726 -1.307 900.0 , 1477.7
115 0.928 -0.002 -3.248 0.005 2.041 231 -0.542 0.086 -23.846 -0.661 -1.192 900.0 , 1519.8
116 0.928 -0.003 -2.673 0.006 2.041
232 -0.594 0.086 -23.876 -0.661 -1.307 900.0 , 1519.8
117 0.762 -0.002 -3.154 0.005 1.676
233 -0.150 -0.001 -14.204 0.020 -0.330 900.0 , 1499.2
118 0.762 -0.003 -2.579 0.006 1.676
119 0.870 -0.001 -3.885 0.003 1.913 234 -0.340 -0.742 -14.265 5.190 -0.748 900.0 , 1338.9
120 0.820 -0.001 -3.857 0.003 1.804 235 -0.225 -0.035 -14.314 0.297 -0.494 900.0 , 1490.1
121 0.870 -0.003 -1.969 0.007 1.913 236 -0.225 0.034 -14.314 -0.257 -0.494 900.0 , 1508.2
122 0.820 -0.003 -1.941 0.007 1.804
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 34 Foundation Client : PT. Pupuk Sriwidj... Page 35
237 -0.457 -0.035 -14.447 0.297 -1.005 900.0 , 1490.2 242 0.793 0.116 -14.643 -0.913 1.745 900.0 , 1529.3
238 -0.457 0.034 -14.447 -0.258 -1.005 900.0 , 1508.2
239 -0.306 -0.116 -14.361 0.945 -0.673 900.0 , 1468.9 Load Combination of Ultimate Condition
Group 1 - F1
240 -0.376 -0.116 -14.401 0.944 -0.826 900.0 , 1469.0
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
241 -0.306 0.115 -14.361 -0.905 -0.673 900.0 , 1529.4
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
242 -0.376 0.115 -14.401 -0.905 -0.826 900.0 , 1529.3
111 -0.633 -0.001 -5.352 0.044 -1.393 900.0 , 1498.3
Group 2 - F2 112 -0.682 -0.001 -5.046 0.038 -1.500 900.0 , 1498.6
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m ) 113 -0.376 -0.001 -4.948 0.039 -0.827 900.0 , 1498.5
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads 114 -0.680 -1.187 -5.046 8.312 -1.496 900.0 , 1268.4
F2 211 1.380 0.001 -24.244 0.018 3.036 900.0 , 1499.2 115 -0.516 -0.051 -5.117 0.436 -1.134 900.0 , 1486.9
212 1.380 0.001 -24.244 0.018 3.036 900.0 , 1499.2 116 -0.516 0.048 -5.117 -0.357 -1.134 900.0 , 1510.1
213 1.571 0.001 -24.305 0.018 3.456 900.0 , 1499.2 117 -0.848 -0.051 -5.307 0.435 -1.865 900.0 , 1487.0
214 1.379 -0.740 -24.244 5.189 3.034 900.0 , 1353.1 118 -0.848 0.048 -5.307 -0.358 -1.865 900.0 , 1510.1
215 1.496 -0.034 -24.427 0.296 3.292 900.0 , 1490.9 119 -0.632 -0.166 -5.183 1.360 -1.390 900.0 , 1459.8
216 1.496 0.036 -24.427 -0.259 3.292 900.0 , 1507.4 120 -0.731 -0.166 -5.240 1.360 -1.609 900.0 , 1459.9
217 1.264 -0.034 -24.294 0.297 2.780 900.0 , 1490.8 121 -0.632 0.164 -5.183 -1.282 -1.390 900.0 , 1537.2
F1 S1
218 1.264 0.036 -24.294 -0.258 2.780 900.0 , 1507.4 122 -0.731 0.164 -5.240 -1.282 -1.609 900.0 , 1537.2
219 1.415 -0.114 -24.380 0.944 3.113 900.0 , 1471.6 123 -0.206 -0.001 -3.687 0.029 -0.452 900.0 , 1498.8
220 1.345 -0.114 -24.340 0.944 2.959 900.0 , 1471.6 124 -0.510 -1.187 -3.784 8.302 -1.121 900.0 , 1256.3
221 1.415 0.116 -24.380 -0.906 3.113 900.0 , 1526.6 125 -0.345 -0.050 -3.855 0.426 -0.759 900.0 , 1486.5
222 1.345 0.116 -24.340 -0.906 2.959 900.0 , 1526.7 126 -0.345 0.049 -3.855 -0.366 -0.759 900.0 , 1511.1
223 1.523 0.001 -24.290 0.018 3.351 900.0 , 1499.2 127 -0.677 -0.050 -4.045 0.425 -1.490 900.0 , 1486.7
224 1.379 -0.555 -24.244 3.897 3.034 900.0 , 1389.6 128 -0.677 0.049 -4.045 -0.367 -1.490 900.0 , 1511.0
225 1.467 -0.025 -24.381 0.227 3.228 900.0 , 1493.0 129 -0.461 -0.166 -3.922 1.351 -1.015 900.0 , 1458.0
226 1.467 0.027 -24.381 -0.189 3.228 900.0 , 1505.3 130 -0.561 -0.166 -3.979 1.350 -1.234 900.0 , 1458.2
227 1.293 -0.025 -24.281 0.227 2.844 900.0 , 1492.9 131 -0.461 0.164 -3.922 -1.291 -1.015 900.0 , 1539.6
228 1.293 0.027 -24.281 -0.189 2.844 900.0 , 1505.3 132 -0.561 0.164 -3.979 -1.292 -1.234 900.0 , 1539.5
229 1.406 -0.086 -24.346 0.712 3.094 900.0 , 1478.5
Group 2 - F2
230 1.354 -0.086 -24.316 0.712 2.978 900.0 , 1478.4
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
231 1.406 0.088 -24.346 -0.675 3.094 900.0 , 1519.8
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
232 1.354 0.088 -24.316 -0.675 2.978 900.0 , 1519.8
F2 111 1.770 0.001 -6.010 0.026 3.894 900.0 , 1498.9
233 1.019 0.001 -14.608 0.010 2.242 900.0 , 1499.5
112 1.656 0.001 -5.610 0.022 3.643 900.0 , 1499.0
234 0.827 -0.740 -14.547 5.182 1.819 900.0 , 1341.2
113 1.962 0.001 -5.707 0.021 4.316 900.0 , 1499.1
235 0.944 -0.034 -14.729 0.289 2.077 900.0 , 1490.5
114 1.654 -1.184 -5.610 8.296 3.640 900.0 , 1274.0
236 0.944 0.035 -14.729 -0.266 2.077 900.0 , 1508.4
115 1.822 -0.048 -5.871 0.419 4.008 900.0 , 1487.7
237 0.712 -0.034 -14.596 0.289 1.566 900.0 , 1490.4 S1
116 1.822 0.051 -5.871 -0.374 4.008 900.0 , 1510.3
238 0.712 0.035 -14.596 -0.265 1.566 900.0 , 1508.4
117 1.490 -0.048 -5.681 0.420 3.278 900.0 , 1487.6
239 0.863 -0.115 -14.683 0.936 1.898 900.0 , 1469.6
118 1.490 0.051 -5.681 -0.373 3.278 900.0 , 1510.3
240 0.793 -0.115 -14.643 0.936 1.745 900.0 , 1469.6
119 1.706 -0.164 -5.804 1.344 3.753 900.0 , 1461.2
241 0.863 0.116 -14.683 -0.913 1.898 900.0 , 1529.2
120 1.606 -0.164 -5.747 1.344 3.534 900.0 , 1461.1
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 36 Foundation Client : PT. Pupuk Sriwidj... Page 37
121 1.706 0.166 -5.804 -1.298 3.753 900.0 , 1536.8 4. CHECK OF STABILITY
122 1.606 0.166 -5.747 -1.298 3.534 900.0 , 1536.8
4.1 CHECK OF SLIDING
123 1.548 0.001 -4.305 0.016 3.405 900.0 , 1499.3
Fz + P.F
124 1.240 -1.185 -4.207 8.290 2.729 900.0 , 1260.9 Formula : > Fs => OK (Bi-Axial)
Fx + Fy
2 2
125 1.408 -0.049 -4.468 0.413 3.098 900.0 , 1487.3 P.F = Passive Force (apply only in case checked passive force, mark by P )
126 1.408 0.050 -4.468 -0.379 3.098 900.0 , 1511.2 Group 1 - F1 Unit ( tonf )
( Fz + P.F ) / Fx + Fy
2 2
127 1.076 -0.049 -4.278 0.414 2.367 900.0 , 1487.1 Ft.Name Dir. L.Comb. Fs(i) Result
128 1.076 0.050 -4.278 -0.378 2.367 900.0 , 1511.2 F1 Bi-Axial 234 0.5 14.26 / 0.82 = 8.74 2 OK
129 1.292 -0.164 -4.402 1.338 2.842 900.0 , 1459.2
Group 2 - F2 Unit ( tonf )
130 1.192 -0.164 -4.345 1.339 2.623 900.0 , 1459.1
( Fz + P.F ) / Fx + Fy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result
131 1.292 0.166 -4.402 -1.304 2.842 900.0 , 1539.2
F2 Bi-Axial 234 0.5 14.55 / 1.11 = 6.55 2 OK
132 1.192 0.166 -4.345 -1.303 2.623 900.0 , 1539.2
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 38 Foundation Client : PT. Pupuk Sriwidj... Page 39
F1 214 1.706 7.100 0.000 3.337 7.1 8.9 100 / 80 % OK 129 1800.00 3000.00 3.922 -1.02 3.922
130 1800.00 3000.00 3.979 -1.23 3.979
Group 2 - F2
131 1800.00 3000.00 3.922 -1.02 3.922
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m )2
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 40 Foundation Client : PT. Pupuk Sriwidj... Page 41
120 3000.00 1800.00 5.240 1.360 5.240 114 3000.00 1800.00 5.610 8.296 5.610
121 3000.00 1800.00 5.183 -1.282 5.183 115 3000.00 1800.00 5.871 0.419 5.871
122 3000.00 1800.00 5.240 -1.282 5.240 116 3000.00 1800.00 5.871 -0.374 5.871
123 3000.00 1800.00 3.687 0.029 3.687 117 3000.00 1800.00 5.681 0.420 5.681
124 3000.00 1800.00 3.784 8.302 3.784 118 3000.00 1800.00 5.681 -0.373 5.681
125 3000.00 1800.00 3.855 0.426 3.855 119 3000.00 1800.00 5.804 1.344 5.804
126 3000.00 1800.00 3.855 -0.366 3.855 120 3000.00 1800.00 5.747 1.344 5.747
127 3000.00 1800.00 4.045 0.425 4.045 121 3000.00 1800.00 5.804 -1.298 5.804
128 3000.00 1800.00 4.045 -0.367 4.045 122 3000.00 1800.00 5.747 -1.298 5.747
129 3000.00 1800.00 3.922 1.351 3.922 123 3000.00 1800.00 4.305 0.016 4.305
130 3000.00 1800.00 3.979 1.350 3.979 124 3000.00 1800.00 4.207 8.290 4.207
131 3000.00 1800.00 3.922 -1.291 3.922 125 3000.00 1800.00 4.468 0.413 4.468
132 3000.00 1800.00 3.979 -1.292 3.979 126 3000.00 1800.00 4.468 -0.379 4.468
127 3000.00 1800.00 4.278 0.414 4.278
Group 2 - F2 Unit( mm , tonf , tonf-m )
128 3000.00 1800.00 4.278 -0.378 4.278
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q 129 3000.00 1800.00 4.402 1.338 4.402
111 1800.00 3000.00 6.010 3.89 6.010
130 3000.00 1800.00 4.345 1.339 4.345
112 1800.00 3000.00 5.610 3.64 5.610
131 3000.00 1800.00 4.402 -1.304 4.402
113 1800.00 3000.00 5.707 4.32 5.707
132 3000.00 1800.00 4.345 -1.303 4.345
114 1800.00 3000.00 5.610 3.64 5.610
115 1800.00 3000.00 5.871 4.01 5.871
116 1800.00 3000.00 5.871 4.01 5.871 5.1.2 Design Parameters
117 1800.00 3000.00 5.681 3.28 5.681 Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
118 1800.00 3000.00 5.681 3.28 5.681
f_clt : Clear Cover for top of footing reinforcement
119 1800.00 3000.00 5.804 3.75 5.804
f_clb : Clear Cover for bottom of footing reinforcement
120 1800.00 3000.00 5.747 3.53 5.747 Loc. : Location of Critical Point from left side of footing
121 1800.00 3000.00 5.804 3.75 5.804
S1 X
122 1800.00 3000.00 5.747 3.53 5.747 Unit(kgf/cm2,mm)
F2 123 1800.00 3000.00 4.305 3.40 4.305 (Flexure) (Shear) fck fy1 fy2 f_cl f_clt f_clb
124 1800.00 3000.00 4.207 2.73 4.207 0.85 0.8 250.00 4000.00 4000.00 50.0 50.0 75.0
125 1800.00 3000.00 4.468 3.10 4.468
126 1800.00 3000.00 4.468 3.10 4.468
127 1800.00 3000.00 4.278 2.37 4.278
128 1800.00 3000.00 4.278 2.37 4.278
129 1800.00 3000.00 4.402 2.84 4.402
130 1800.00 3000.00 4.345 2.62 4.345
131 1800.00 3000.00 4.402 2.84 4.402
132 1800.00 3000.00 4.345 2.62 4.345
111 3000.00 1800.00 6.010 0.026 6.010
S1 Y 112 3000.00 1800.00 5.610 0.022 5.610
113 3000.00 1800.00 5.707 0.021 5.707
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 42 Foundation Client : PT. Pupuk Sriwidj... Page 43
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014
Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602
Foundation Client : PT. Pupuk Sriwidj... Page 44 Foundation Client : PT. Pupuk Sriwidj... Page 45
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
132 top 9.928 3.600 OK
S1 5
3000
114 bottom 9.928 3.600 OK
458
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 0.8 2 fck B'w d (eq 11-3) 1442
- Vu <= Vc , then OK!!
1
3000
3
458
358
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014
1
Pl 450 mm Vc3 130.504 tonf
c / s 1 / 40 Result OK
5
Pl 450 mm Vc3 130.504 tonf
c / s 1 / 40 Result OK
Void Ratio
Saturation
Density Consolidation
Degree of
Plasticity
Specific Water Compression
Liquidity
Porosity
% finer by weight
(Total Stress)
Plastic
Bore
Liquid
Depth in meter Gravity Content
Index
Index
Limit
Limit
Hole No.
Jm Jd qu St c I Cc Cr Cv Pc
Gs wn wL wP IP IL e n Sr
- - - t/m3 t/m3 % % % % - - % % kg/cm2 - kg/cm2 deg - - 2
m /Year kg/cm
2
B -1 2.00 - 2.70 2.54 1.52 0.93 64 98 31 67 0.49 1.73 63 93 97 - - 0.14 2.0 0.37 0.04 1.50 1.58
4.00 - 4.70 2.63 1.78 1.28 39 47 15 31 0.74 1.05 51 97 99 - - 0.21 4.1 0.54 0.05 1.50 1.81
6.00 - 6.70 2.62 1.83 1.35 35 74 22 52 0.26 0.94 48 98 99 - - 0.53 2.40 1.02 0.10 1.55 0.98
8.00 - 8.70 2.63 1.84 1.41 31 64 22 42 0.22 0.87 47 93 100 0.56 - - - 0.61 0.06 2.50 3.98
B-2 2.00 - 2.70 2.48 1.11 0.46 144 89 58 30 2.81 4.43 82 80 93 - - 0.22 4.50 0.47 0.05 14.00 0.76
4.00 - 4.70 2.67 1.70 1.16 46 86 28 58 0.31 1.30 56 95 100 - - - - 1.03 0.10 3.2 0.84
6.00 - 6.70 2.64 1.83 1.38 32 61 19 42 0.32 0.91 48 94 100 0.42 - - - 1.73 0.17 1.7 1.03
B-3 2.00 - 2.70 2.61 1.62 1.09 48 80 19 61 0.49 1.39 58 91 83 - - 0.27 1.70 0.51 0.05 12.00 0.75
4.00 - 4.70 2.77 1.88 1.39 35 81 23 58 0.21 0.99 50 99 99 - - - - 1.00 0.10 7.6 0.85
6.00 - 6.70 2.66 1.82 1.38 32 59 21 38 0.30 0.93 48 91 98 0.72 - - - 0.95 0.10 5.5 0.54
B-4 2.00 - 2.70 2.66 1.85 1.42 30 70 26 43 0.09 0.87 47 92 98 - - - - 1.59 0.16 1.80 1.00
6.00 - 6.70 2.68 1.76 1.27 38 80 26 53 0.22 1.11 53 93 97 - - - - 0.60 0.06 19.0 0.68
10.00 - 10.70 2.61 1.65 1.26 31 74 24 50 0.14 1.07 52 76 100 0.86 - - - 1.25 0.13 2.2 0.7
Minimum = 2.48 1.11 0.46 30 47 15 30 0.09 0.87 47 76 83 0.42 0.0 0.14 1.70 0.37 0.04 1.50 0.54
Maximum = 2.77 1.88 1.42 144 98 58 67 2.81 4.43 82 99 100 0.86 0.0 0.53 4.50 1.73 0.17 19.00 3.98
Avearge = 2.63 1.71 1.21 47 74 26 48 0.51 1.35 54 92 97 0.64 0.0 0.27 2.94 0.90 0.09 5.70 1.19