Inspection & Test Plan: Project Name: Main Activity: Date: W Witness H Hold Point T Test R Random

This document outlines the quality control plan for installing, testing, and commissioning escalators on a project. It lists 4 main activities - setting out/survey, mechanical installation, electrical installation, and testing/commissioning. For each activity, it specifies the party responsible for works, reference documents, quality characteristics to verify, and type of quality control including hold points, witnessing, testing, and random checks. Records of surveys, check sheets, and an approved third party inspection certificate are required.

Uploaded by

Kasinadh Karra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

Inspection & Test Plan: Project Name: Main Activity: Date: W Witness H Hold Point T Test R Random

This document outlines the quality control plan for installing, testing, and commissioning escalators on a project. It lists 4 main activities - setting out/survey, mechanical installation, electrical installation, and testing/commissioning. For each activity, it specifies the party responsible for works, reference documents, quality characteristics to verify, and type of quality control including hold points, witnessing, testing, and random checks. Records of surveys, check sheets, and an approved third party inspection certificate are required.

Uploaded by

Kasinadh Karra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Form INSPECTION & TEST PLAN

Project Name: Rev 0


Main Activity: Installation,Testing Commissioning of Escalators Date: 7-Jun-15

W = Witness
CONTROL
QUALITY

H = Hold Point
TYPES:

T = Test
` R = Random

Quality control type by:


Activity

Third Party
Consultant
Contractor
Reference Quality Characteristics/acceptance criteria

Supplier
no.

Activity Works by Remarks

Client
SC /
doc. to be verified Records

Check levels and centreline of the setting out as


Setting Out / Survey per the Grid line provided by Maincontractor
1 SPI Shop Drawings H H W R Survey record

2 Mechanical Installation SPI Shop Drawings H H W R Check sheets


As per the Method statement/Schindler standards

3 Electrical Installation SPI Shop Drawings As per the Method statement/Schindler standards H H W R Check sheets

As per the Method statement/Schindler


4 Testing commissiong SPI Shop Drawings standards/ Local Third party Inspections H H W R T DM Approved Third
party Certificate

SUBMITTED BY: REVIEWED BY MAIN CONTRACTOR APPROVED BY CONSULTANT


SCHINDLER ELEVATORS KELE HYDER
NAME : NAME : NAME :