Inspection & Test Plan: Project Name: Main Activity: Date: W Witness H Hold Point T Test R Random
Inspection & Test Plan: Project Name: Main Activity: Date: W Witness H Hold Point T Test R Random
W = Witness
CONTROL
QUALITY
H = Hold Point
TYPES:
T = Test
` R = Random
Third Party
Consultant
Contractor
Reference Quality Characteristics/acceptance criteria
Supplier
no.
Client
SC /
doc. to be verified Records
3 Electrical Installation SPI Shop Drawings As per the Method statement/Schindler standards H H W R Check sheets