Protection System Management
Protection System Management
During the discussions and interactions with the various stake holders of the
protection system, it was strongly felt by the Protection Sub-committee
members that in addition to technical issues related to protection, the
management issues related to protection system need to be addressed. In
order to comprehensively address the protection issues in the utilities,
following are the recommendations.
Page 104
1. ESTABLISHING PROTECTION APPLICATION DEPARTMENT:
1.1. It is recommended that each utility establishes a protection
application department with adequate manpower and skill set.
1.2. The protection system skill set is gained with experience, resolving
various practical problems, case studies, close interaction with the
relay manufactures and field engineers. Therefore it is proposed
that such people should be nurtured to have a long standing
career growth in the protection application department.
2. RELAY SETTING CALCULATIONS
2.1. The protection group should do periodic relay setting calculations
as and when necessitated by system configuration changes. A
relay setting approval system should be in place.
2.2. Relay setting calculations also need to be revisited whenever the
minor configuration or loading changes in the system due to
operational constraints. Feedback from the field/substations on
the performance of the relay settings should be collected and
settings should be reviewed and corrected if required.
Report of the Task Force on Power System Analysis Under Contingencies
Page 106
5.3. No relay setting in the field shall be changed without proper
documentation and approval by the protection application
department.
5.4. Protection application department shall periodically verify the
implemented setting at site through an audit process.
6. STORAGE AND MANAGEMENT OF RELAY SETTINGS
6.1. The committee felt that with the application of numerical relays,
increased system size & volume of relay setting, associated data to
be handled is enormous. It is recommended that utilities shall
evolve proper storage and management mechanism (version
control) for relay settings.
6.2. Along with the relay setting data, IED configuration file should
also be stored and managed.
7. ROOT CAUSE ANALYSIS OF MAJOR PROTECTION TRIPPING
(MULTIPLE ELEMENT OUTAGE) ALONGWITH CORRECTIVE &
IMPROVEMENT MEASURES
7.1. The routine tripping of transmission lines, transformers and
generating units are generally analysed by the field protection
personnel. For every tripping, a trip report along with associated
DR and event logger file shall be generated. However, for major
tripping in the system, it is recommended that the protection
application department shall perform the root cause analysis of the
event.
7.2. The root cause analysis shall address the cause of fault, any maloperation
or
non-operation
of
relays,
protection
scheme
etc.
7.3. The root cause analysis shall identify corrective and improvement
measures required in the relay setting, protection scheme or any
other changes to ensure the system security, reliability and
dependability of the protection system.
7.4. Protection application group shall keep proper records of
corrective and improvement actions taken.
8. PERFORMANCE INDICES: DEPENDABILITY & SECURITY OF
PROTECTION SYSTEM
8.1. The committee felt that key performance indices should be
calculated on yearly basis on the dependability and security of
protection system as brought out in CBIP manual.
9. PERIODIC PROTECTION AUDIT
9.1. Periodic audit of the protection system shall be ensured by the
protection application team.
Report of the Task Force on Power System Analysis Under Contingencies
9.2. The audit shall broadly cover the three important aspect of
protection system, namely the philosophy, the setting, the
healthiness of Fault Clearing System.
10. REGULAR TRAINING AND CERTIFICATION
10.1. The members of the protection application team shall undergo
regular training to enhance & update their skill sets.
10.2. The training modules shall consist of system studies, relaying
applications, testing & commissioning
10.3. Certification of protection system field engineer for the testing &
commissioning of relay, protection scheme is strongly
recommended.