Shear Wall Links
Shear Wall Links
Shear Wall Links
ABSTRCT
FOUNDATION BOLTS
BASE PLATE
68238.27
68.24 MT
PREVIOUS WEIGHT 65398.42
CHANGED WEIGHT 68238.27
DIFFERENCE 2839.85
NAME OF THE CLIENT : ANDRITZ FEED & BIOFUEL, CHENNAI.
PROJECT: SKYLARK HATCHERIES (P) LTD, PURNIA, BIHAR.
Sl.
No 5% TOTAL
MATERIALS WEIGHT WASTAGE WT
1 ISA50x50x6 1540 77 1617
2 BASE PLATE 450x250x12 Tk., 127 6 134
3 CONNECTION PLATE 250x150x10 Tk., 18 1 19
CONNECTION PLATE 40x200x10 Tk., 8 0 8
CONNECTION PLATE 50x50x6 Tk., 18 1 19
CONNECTION PLATE 300x150x10 Tk., 42 2 45
4 LC PURLIN 300x65x20x2.55 914 46 960
5 12 DiaSag Rod 36 2 37
Total 135 2837 kg
OR 2.8374 MT
Total
Weight
502.79
580.82
47.71
21.60
386.91
127.17
17.66
7.54
17.66
42.39
914.40
35.60