Installation Arrangement Agreement: Precast Concrete Works For Vanilla Phase 1 Project

This document outlines an installation arrangement agreement between PT. Superkrane Mitra Utama and an unnamed purchaser for precast concrete works on the Vanilla Phase 1 Project. It details which party is responsible for organizing and charging various project elements. The contractor is responsible for supplying supervision, manpower, tools and equipment for handling, fabrication and erection works. The purchaser is responsible for supplying materials, benchmarks, temporary power and water, and inspection. Both parties share responsibilities for site security, firefighting, and permitting.

Uploaded by

Mochamad Romi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views4 pages

Installation Arrangement Agreement: Precast Concrete Works For Vanilla Phase 1 Project

This document outlines an installation arrangement agreement between PT. Superkrane Mitra Utama and an unnamed purchaser for precast concrete works on the Vanilla Phase 1 Project. It details which party is responsible for organizing and charging various project elements. The contractor is responsible for supplying supervision, manpower, tools and equipment for handling, fabrication and erection works. The purchaser is responsible for supplying materials, benchmarks, temporary power and water, and inspection. Both parties share responsibilities for site security, firefighting, and permitting.

Uploaded by

Mochamad Romi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PT.

SUPERKRANE MITRA UTAMA


PELALAWAN - RIAU

INSTALLATION ARRANGEMENT AGREEMENT


PRECAST CONCRETE WORKS FOR VANILLA PHASE 1 PROJECT
Revision_01
ORGANIZED OR SET UP
CHARGED BY
BY
NO DESCRIPTION REMARKS
CONTRACT PURCHASE CONTRACT PURCHASE
OR R OR R

1 ARRANGEMENT OF MILL SITE


1.1 Access to Mill Site X X
1.2 Access to erection location and maintenance X X
1.3 Enterance guarding X X
1.4 Contractors temporary facilities area
a) Availability X X
b) Cleaning X X
1.5 Common Areas
a) Preparation X X
b) Cleaning X X
1.6 Site Security X X X X General Security by Purchaser
1.7 Temporary Facilities
a) Offices X X
b) Toilets X X
c) Canteen ( meals ) X X
d) Warehouse X X
e) Clinic X X
1.8 Parking for Heavy Equipment X X
1.9 Fire Fighting during erection & Production X X X X
2.0 Access permit X X
2 SUPPLY, TRANSPORT & HANDLING MATERIAL
2.1 Provide Bench Mark and Reference Line X X
2.2 Provide Permanent Material and Consumable at Job Site
- Concrete X X
- Reinforced bar X X
- Wire Mesh X X
- Mortar for Screading X X
- Waterproofing Membran SIKA or Fosroc X X
- Non Shrink grout X X
- Mortar Grout X X
- Dowels incl. expansion joints X X

1 of 4
ORGANIZED OR SET UP
CHARGED BY
BY
NO DESCRIPTION REMARKS
CONTRACT PURCHASE CONTRACT PURCHASE
OR R OR R

- Raw material for embeded include dowel conduit ( GSA ) X X


- Strand Low Lak 1/2" X X

- Precast bed accessories: such AS conical jaw, conical brush, form oil etc X X

- STEEL Supporting for temporary support arrangement X X


Supply by Purchaser, Cost by
- Fuel X X X X Contractor for equipment in
contractors scope
2.3 Unloading and storing material at location X X
2.4 Protection during storage at location X X
2.5 Survey, alignment and inspection X X X X Inspection by Purchaser
2.6 Temporary Power :
a) Main installation X X
Checking and acceptance by
b) Connection to Main Installation X X
Purchaser within 100 m
c) Power supply at designated point X X
d) Power distribution incl. panels X X
e) Power distribution cabinets for tools X X
Checking and acceptance by
f) Official checking & Control of electrical installation X X X
Purchaser
2.7 Water :
a) Drinking water X X
b) Supply Water for construction at designated point X X
2.8 Tools X X
3 SUPPLY OF SUPPERVISION, MANPOWER, TOOLS AND EQUIPMENT
3.1 Providing of supervision and manpower to perform the job X X
Spinning & Viscose Building
3.2 Equipment for handling and fabrication works :
a) All cranes capacity included qualified operator, lub. oil & maintenance X X
b) All trailer capacity included qualified operator, lubricating oil & maintenance X X
c) Providing and supervision all access and area for crane during fabrication X X
d) Cables, slings, ropes, chains, shackles etc for all crane capacity X X
e) Stressing Machine Jack X X
3.3 Equipment for erection works :
a) Cranes below 50T capacity included qualified operator, lub. oil & maintenance X X
b) Cranes above and 50T included qualified operator, fuel, lubricating oil & maintenance X X
c) All trailer capacity included qualified operator, lubricating oil & maintenance X X
d) Providing and supervision all access and area for crane during construction X X
e) Cables, slings, ropes, chains, shackles etc for crane below 50T capacity X X
f) Cables, slings, ropes, chains, shackles etc for crane above 50T capacity X X

2 of 4
ORGANIZED OR SET UP
CHARGED BY
BY
NO DESCRIPTION REMARKS
CONTRACT PURCHASE CONTRACT PURCHASE
OR R OR R

Spinbath & Pipe Rack Building


3.4 Equipment for handling and fabrication works :
a) Cranes below 50T capacity included qualified operator, lub. oil & maintenance X X
b) Cranes above and 50T included qualified operator, fuel, lubricating oil & maintenance X X
c) Trailer capacity 40Tand below included qualified operator, fuel, lubricating oil & maintenance X X Standart trailer L=12 M
d) Trailer above 40T included qualified operator, fuel, lubricating oil & maintenance X X
e) Cables, slings, ropes, chains, shackles etc for crane 50T capacity and below X X
f) Cables, slings, ropes, chains, shackles etc for crane above 50T capacity X X
g) Stressing Machine Jack X X
3.5 Equipment for erection works :
a) Cranes below 50T capacity included qualified operator, lub. oil & maintenance X X
b) Cranes above and 50T included qualified operator, fuel, lubricating oil & maintenance X X
c) Trailer capacity 40Tand below included qualified operator, fuel, lubricating oil & maintenance X X
d) Trailer above 40T included qualified operator, fuel, lubricating oil & maintenance X X
e) Providing and supervision all access and area for crane during construction X X
f) Cables, slings, ropes, chains, shackles etc for crane below 50T capacity X X
g) Cables, slings, ropes, chains, shackles etc for crane above 50T capacity X X
3.6 Quality Inspection and Assurance X X X X
4 COMMUNICATION
Purchaser to assist to getting
4.1 Telephone X X X
telephone line
Purchaser to assist to getting
4.2 Telex and Fax X X X
telephone line
Purchaser to assist to getting
4.3 Mail X X X
telephone line
Contractor provide Jamsostek
5 INSURANCE X X X X and insurance for equipment
supplied by contractor
6 GENERAL
6.1 Lighting
a) Outside general mill site lighting X X
b) Construction area lighting X X X X
6.2 Safety Inspection X X X X
6.3 Construction Inspection X X X X
6.4 Cleaning of Construction areas
a) Waste cleaning X X
Disposal area shall be provided
b) Waste Removal X X by Purchaser within project
area, max 1 km
7 ENGINEERING , QUALITY CONTROL, HSSE & CONSTRUCTION
7.1 Drawing for Constuction X X 3 copy for Contractors

3 of 4
ORGANIZED OR SET UP
CHARGED BY
BY
NO DESCRIPTION REMARKS
CONTRACT PURCHASE CONTRACT PURCHASE
OR R OR R

7.2 Shop Drawing X X


7.3 as Built Drawing X X
7.4 Work Methode X X Approval by Purchaser
7.5 Safety and Quality Plan X X Approval by Purchaser

8 ENGINEERING COMUNICATION SHEET


8.1 Request for Information to Purchaser X X
8.2 Site Instruction / Construction Manager Instruction ( CMI ) X X
8.3 NCR X X X
8.4 Daily , Weekly, Monthly Report Progress X X

4 of 4