The document provides a format for a Material Discrepancy Report used by Reliance Jio Infocomm Limited to document issues with materials used in wireless infrastructure projects. The format includes sections to describe the material discrepancy, recommend corrective actions, note the effect on cost and time, document actions taken to prevent recurrence, and close out the report. Sign-off is required from field engineers, area managers, quality engineers, and warehouse staff.

Uploaded by

Samsung Networks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
668 views

MDRF Format

The document provides a format for a Material Discrepancy Report used by Reliance Jio Infocomm Limited to document issues with materials used in wireless infrastructure projects. The format includes sections to describe the material discrepancy, recommend corrective actions, note the effect on cost and time, document actions taken to prevent recurrence, and close out the report. Sign-off is required from field engineers, area managers, quality engineers, and warehouse staff.

Uploaded by

Samsung Networks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Wireless Infrastructure R4G-70-CQM-QAP-PR-001

Quality Management Plan

24. Material Discrepancy Report Format:


Material Discrepancy
Report

State/Circle: City/Area: MDR No.:


Originator/Field Engineer: W.O. No.: Date:
Material
Duct OFC Mast Others (Please Specify)
Category

Description Of Material Discrepancy (By Originator):

Signature:
Field Engineer
Corrective Action Recommended By Area Manager / Materials Control Group for
Replacement of Material / substitution

Signature: Signature: Date:


Area Manager Quality Engineer
Rework Quantity In Case Recommendation Results In Rework
Effect in Cost :- Effect in Time

Field Engineer: Area Manager: Circle Head:

Action Taken To Prevent Recurrence (By Warehouse)

Signature:______________Date:_________
Warehouse In-Charge

Closed By:

Name Sign Date


Warehouse In-Charge
Area Manager For Record
Quality Team For Rework Data Compilation
C.C.

Format No.: R4G-70-CQA-FMT-PR-003-00

Reliance Jio Infocomm Limited Rev. 01 Issue date : 1-July-13 Page 23 of 28