Capacity of Plant 16KLD
Capacity of Plant 16KLD
BAR SCREEN
Assume Detention time varies from 3 to 5 mins
Detention time, T=5 min
Discharge, Q= 16 KLD
Q= Volume/ 5min
Volume=0.06Cum
Depth of Screen chamber varies from 0.5 m to 1 m
Say, Depth =1 m
L=2B , 2B*B=2B2
EQUALIZATION
TANK
Assume Detention time varies from 3 to 8 Hrs
Detention Time, T= 6 Hr
Q= Volume /detention time
Volume = 4 Cum
Assume Depth of tank varies from 2.5m to 3.5m
Depth of tank= 3m
Area of tank = 2 Sqm
Length = 1m
Breadth = 1m
PUMP REQUIREMENT
2 nos of pump ( 1 Working & 1 Stand by)
Volume or Capacity of water to aeration tank, time assumed = 2 Hr
Pump discharge capacity = Capacity of tank /time in hr
Discharge, Q= 2.000 Lts/Hr 0,56 Lts/Sec
Suction head= 15 m ranges from 6 to 20 m
HP= W*Q*H/75*efficiency
HP= 1
Go for higher HP 2
AERATION TANK
Assume inlet BOD= 350 mg/l
Treated water BOD should be range 10 mg/l to 30 mg/l
FM ratio range from 0,1 to 0,2
MLSS ranges from 2000 mg/l to 4000 mg/l
F/M=(Q X BOD inlet)/(volume X MLSS)
Volume = 13,33 Cum
Volume = 14,00 Cum
Depth of aeration tank varies from 2,50 m to 4,00 m
2mX2mX3.5m
Pump capacity required to feed the clarifier water to PSF & ACF
Required HP= 0.246 HP say 1 HP