0% found this document useful (0 votes)
53 views3 pages

Access: Adjusted Annual Implementation Report

This document is an annual implementation report for San Isidro-Sta Teresita Elementary School for the 2018-2019 school year. It outlines 19 project interventions with targets and actual outputs, expenses, accomplishments, and variances. Overall accomplishment for the year was 90.08%, indicating most targets were met or exceeded. The main gate construction project solicited funds through an alumni raffle and was fully accomplished at a cost of P150,000, meeting the 100% target.

Uploaded by

Roland Campos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views3 pages

Access: Adjusted Annual Implementation Report

This document is an annual implementation report for San Isidro-Sta Teresita Elementary School for the 2018-2019 school year. It outlines 19 project interventions with targets and actual outputs, expenses, accomplishments, and variances. Overall accomplishment for the year was 90.08%, indicating most targets were met or exceeded. The main gate construction project solicited funds through an alumni raffle and was fully accomplished at a cost of P150,000, meeting the 100% target.

Uploaded by

Roland Campos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

San Isidro-Sta Teresita Elementary School

ADJUSTED ANNUAL IMPLEMENTATION REPORT


School Year 2018-2019
Project Title PROJECT INTERVENTIONS EXPECTED Target Actual ACTUAL % OF Variance/
TEAM OUTPUT Expenses Expenses RESULT SCCOMP- Reasons for
LISHMENT the Variance
ACCESS
1] ENROLMENT
1.
2] ZERO DROPPED-OUT
2.
QUALITY
3] 100% PROMOTION
RATE
3.
100% COHORT SURVIVAL RATE
4.
4] LEARNERS’ AVERAGE
GRADES/NAT

5] LITERACY RATE

6] HEALTH & NUTRITIONAL


STATUS
5.
7] AWARDS AND
RECOGNITION

GOVERNANCE

/Mdberja
San Isidro-Sta Teresita Elementary School
ADJUSTED ANNUAL IMPLEMENTATION REPORT
School Year 2018-2019
Project Title PROJECT INTERVENTIONS EXPECTED Target Actual ACTUAL % OF Variance/
TEAM OUTPUT Expenses Expenses RESULT SCCOMP- Reasons for
LISHMENT the Variance
8] SCHOOL-BASED
MANAGEMENT LEVEL
Level of practice
(all other initiatives)
9] CHILD FRIENDLY SCHOOL
SYSTEM

10] TEACHER-STUDENT RATIO

11] CLASSROOM-STUDENT
RATIO

12] TOILET – STUDENT RATIO

13] SEAT – STUDENT RATIO

14] LEARNER MATERIALS

15] TEACHER PROFESSIONAL


DEVELOPMENT

16] FUNDING SOURCE

/Mdberja
San Isidro-Sta Teresita Elementary School
ADJUSTED ANNUAL IMPLEMENTATION REPORT
School Year 2018-2019
Project Title PROJECT INTERVENTIONS EXPECTED Target Actual ACTUAL % OF Variance/
TEAM OUTPUT Expenses Expenses RESULT SCCOMP- Reasons for
LISHMENT the Variance
17] STAKEHOLDERS’
PARTICIPATION
SISTES MAIN GATE Jennifer B. Solicitation and Constructi P150,000 P150,000 100% 100% 0%
Privaldos with fund raising with on of .00 100% mean
B1986 Alumni raffle main gate achievement
20m wide rating
and
18] PRIORITY IMPROVEMENT
AREAS (PIA) PROJECTS /
CONTINUOUS IMPROVEMENT
PROJECTS

19] OTHER STAKEHOLDERS’


ACCOMPLISHMENTS

AVERAGE ACCOMPLISHMENT 90.08


RESULT

/Mdberja

You might also like