20m3 Plant Mobile Mixer With Skip 2014
20m3 Plant Mobile Mixer With Skip 2014
20m3 Plant Mobile Mixer With Skip 2014
, Ltd
No11, Lane 259/9, Vọng str, Hanoi, Vietnam
Tel: 84 43. 8697855 Fax: 84 43. 6283741
E-mail: [email protected] Website: www.thtvietnam.com
Date: August 22, 2014
At your request, we would like to submit you the offer for a CLC blocks production plant
of capacity min 20 cbm/day with the possibility of upgrading to max. 60m3/day in future
with the terms and conditions as follows
Quotation
(No 0701014THT)
CLC BLOCKS PRODUCITON PLANT AT CAPACITY OF MINIMUM
20CBM/DAY
- The plant is designed for production of clc blocks from the following materials:
cement/ fly ash, sand, water, foam. The producer may add the concrete additive.
- Production capacity: min 20cbm/day, extendable to bigger capacity just by
increasing the number of molds; for 50-60 m3/day by adding the automatic
weighing system to speed up the loading of materials.
- Power consumption: Max. 25kW
1.1.1 Mixer
- Cylindrical form body mixing drum made of steel plate of 6mm thick, diameter of 1.0m, at
1.5m long, giving empty volume of 1,15 m3 for mixing aprox. 1m3 of CLC mortar.
- Special designed bearing hub with heavy duty Japanese roll bearing, totally closed, isolated
from dust and concrete mortar for long service life
- Horizontal shaft with reverse direction ribbon blades, especially designed for foam concrete
production to assure the uniform and fast mixing.
- With pipeline coupling for water line supply and tube for foam feeding
Foam Generator: model FoamMaster IB, upgraded version for electric and pneumatic drive
- Light and compact foam generator, famous
- Capacity : 200-260l/min
- Installed on a steel base support at the
gear box
- The spray lance is fixed on the mixer body
for supply the foam directly inside the mixer
- Suction line is made available for drawing
the foaming solution from a tank located on
the platform.
- Quantity of foam is set automatically by
electronic timer installed in the control
board
- The water source for clc production must be supplied on site by user
- Clean water is recommended
- A separate water tank of must be provided by the buyer for supply water to the mixer and foam
generator and this water must be clean. Tap water is recommended.
Control Board:
- Closed control panel with all
components mounted inside steel box,
isolated from water and dust, with
electric/ electronic components from
famous brands, easy available on the
market
- Equipped with all buttons, gauges,
swiches to operate all the equipment on
the units
- Allows operator to set and control the
mixing time, foam spray time, water
pump running time
- Emmergency stop button
Support Chassis
- Chassis frame made of strong welded steel boxes and bars, to support all the eqmnt and
subframe
-
- With hook- eye for lifting up with crane to put on small cargo truck to travel to the jobsite
Skip bucket
- for loading solid materials ( cement, sand, flyash,..) into the mixer
- lifting up by cable through a system including gear-motor, rollers and rails frame
- bucket capacity: 0.42m3/ 450kg
- Lifting speed: 18m/min
- Motor capacity: 2.2kW/380V/50Hz
1.13 The mold transfer tables: for transfer the molds between the rails lines
- Quantity: 6 sets
1.16 Technical document: The seller will supply the following document:
- Operation manuals of batching plant, cutting machine, foam generator,
- Detailed design drawing for buyer to build the installation foundation of the equipment
2. Installation, Commissioning And Training
- The Seller will send 3 technicians to the Buyer Factory for max. 7 working days to
supervise and assist the Buyer to install the machines and make commissioning, training
the operators. If there is any delay caused by the Buyer, then the Buyer must pay all the
accommodation cost for The Seller’s technicians plus a fee of USD 150/day/person.
- Buyer to be responsible for all civil engineering works, including foundation for each
machine (cutting machines, rails fixing on floor), supply of electricity, air and water to the
machines. Buyer also supply the necessary materials and facilities like welding torch,
standard tools, lifting cranes, forklift, power tools… requested by The Seller’s technicians.
- During the time of installation, Buyer shall provide enough experienced manpower for
installation works. At least there must be two (2) electricians, two (2) welders, and six (6)
technicians to carry out the installation works and learn the operation procedures.
- The Buyer technical peoples must follow the instructions of The Seller’s technicians. Any
damage resulting from the fault caused by the buyer’s technicians during installation and
commissioning shall be buyer’s responsibility. The Seller’s technicians will repair or
replace such damaged part upon request, and all expenses for such services shall be
borne by the buyer.
- All raw materials and consumable parts such as Power Cables, welding rods, cutting
tools, electric power, cement, sand, foaming agent,etc. for test run shall be provided by
the Buyer and consequential losses are for the account of Buyer.
3. Shipment:
- Shipment time: max 90 days from the Seller’s receipt of L/C
- Port of shipment: Haiphong Port
- Partial shipment should be allowed
- Packing: in 1x 40ft container
4.Payment:
- 30% by TTR as down payment after contract signing
- 70% by TTR before shipment
Or payment by L/C A/S:
- 100% by irrevocable confirmed Letter of Credit opened by a first class bank in favor of
the Seller, payable against the presentation of shipping document
5. Warranty: all goods are warranted against any fault in material or workmanship for 6
months from the shipment date.
We hope our offer has met your expectation and looking forwards to receiving your valuable
order.