LC 177 - 15

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

Letter No.

GTH/Design/LC 177/15 DATE: 20-11-17

To,
THE SUPERITENDING ENGINEER
DESIGNS (R&B) CIRCLE,
GANDHINAGAR

NAME OF WORK : CONSULTANCY SERVICES FOR PREPARATION OF DETAILED


PROJECT REPORT FOR RAILWAY OVER BRIDGES AT VARIOUS LOCATIONS ON
DFCC ROUTE BETWEEN AHMEDABAD TO PALANPUR IN STATE OF GUJARAT

SUBJECT: Submission of Design and Drawing for LC NO 177 for above mentioned Work.

Reference: Office of Deputy Executive Engineer,NH-Sub division,Ahmedabad letter No: NHSD-


1/PB/1227/2017

Respected Sir,

With reference to above subject and reference letter, there was need of pile cap reorientation to
accommodate site conditions at proposed ROB. We have revised pile cap orientation and checked design
for same and it is safe.

Herewith we are submitting the below enclosed document of LC 177 (I.R KM 667/0 - 1) located between
block station Majadar & Timbachudi, for Approval.

No of
S.No Drawing Detail Drawing No. Revision
Copies
RCC Detail of
Pile – AP2 to GTH_-AHM_PLN_LC
1 R2 1
AP5 (To 177_05
Majadar)
RCC Detail of
Pier & Pilecap – GTH_AHM-
2 R0 1
AP1 to AP10 PLN_LC177_06
(To Majadar)
Design
3 - - 1
Document

Thanking you,

For,
Geo Designs and Research Pvt Ltd
Letter No. GTH/Design/LC 208 B-09 DATE: 20-11-17

To,
THE SUPERITENDING ENGINEER
DESIGNS (R&B) CIRCLE,
GANDHINAGAR

NAME OF WORK : CONSULTANCY SERVICES FOR PREPARATION OF DETAILED


PROJECT REPORT FOR RAILWAY OVER BRIDGES AT VARIOUS LOCATIONS ON
DFCC ROUTE BETWEEN AHMEDABAD TO PALANPUR IN STATE OF GUJARAT

SUBJECT: Submission of Design and Drawing for LC NO 208 B for above mentioned Work.

Respected Sir,

Herewith we are submitting the below enclosed document of LC 208 B (Railway Ch. 706/9-707/0) located
between block station Unjha & Motidau, for Approval.

No of
S.No Drawing Detail Drawing No. Revision
Copies
RC Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
1 R0 1
AP1&AP7 to AP9 B_06
(To Valam)
Plan Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
2 R0 1
AP2 to AP6 (To B_07
Valam)
RC Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
3 R0 1
AP2 to AP6 (To B_08
Valam)
RC Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
4 R0 1
AP10 (To Valam) B_09

5 Design Document - - 1

Thanking you,

For,
Geo Designs and Research Pvt Ltd
GTH/2015-16/018/LC177/Design/16 Date:-20/11/17

To,
THE SUPERINTENDING ENGINEER
DESIGNS(R&B) CIRCLE,
GANDHINAGAR

NAME OF WORK: CONSTRUCTION OF ROB ON DFCC ROUTE IN LIEU OF LC NO.


177 BETWEEN BLOCK STATION CHHAPI-UMARDASHI AT I.R KM 667/0-1.
NAME OF ROAD: MAJADAR-NALASAR

Here we have attached below document for above subject for your scrutiny and approval.

SR NO OF
Details of Particular DRAWING NO RIVISION
NO COPIES
Plan Details of Pier GTH_LC 177_Pier
1 Cap for LC 177 AP1 to Cap_04 R0 1
AP6 (To Majadar
Plan Details of Pier
Cap for LC 177 AP7 to GTH_LC 177_Pier
2 Cap_05 R0 1
AP8 & AP10 to AP12
(To Majadar)
RC Details of Pier Cap
for LC 177 AP1 to AP5 GTH_LC 177_Pier
3 Cap_06 R0 1
& AP8, AP12 (To
Majadar)
RC Details of Pier Cap GTH_LC 177_Pier
4 for LC 177 AP9 (To Cap_07 R0 1
Majadar)
RC Details of Pier Cap
for LC 177 AP to AP7 GTH_LC 177_Pier
5 Cap_08 R0 1
& AP10 to AP11 (To
Majadar)

6 Design Document - - 1

Thanking You,

For,
Geo Designs and Research Pvt Ltd
Letter No. GTH/Design/LC 179-12 DATE: 20-11-17

To,
Superintending Engineer
Designs (R&B) Circle,
Gandhinagar.

Name Of Work: - Consultancy Services For Preparation Of Detailed Project Report For
Railway Over Bridges At Various Locations On DFCC Route Between
Ahmedabad To Palanpur In State Of Gujarat.

Subject: - Drawing of Bearing for LC 179

Dear Sir,

Herewith we are submitting below enclosed document for above subject for your approval.

SR NO OF Remarks
Details of Particular DRAWING NO RIVISION
NO COPIES
Detail of
GTH_LC
1 Elastomeric R0 5 -
179_Bearing_01
Bearing

Thanking you,

For,
Geo Designs and Research Pvt Ltd
MIDAS/Civil RC Beam Checking Result
Company Project Title
Author Microsoft File Name D:\...\24m Straight\24m span.mcb

1. Design Information
Member Number: 3
Design Code : IRC:112-2011
Unit System : kN, m
Material Data : fck = 35000, fy = 500000, fyw = 500000 KPa
Beam Span : 2.8 m
Section Property: PierCap C (No : 3)

2. Section Diagram
[END-I] [MID] [END-J]
0.091

0.091

0.091
2.1

2.1

2.1
0.091

0.091

0.091
2.8 2.8 2.8

TOP1 : 15-P25, 15-P25, TOP1 : 15-P25, 15-P25, TOP1 : 15-P25, 15-P25,


TOP2 : TOP2 : TOP2 :
BOT1 : 15-P25, BOT1 : 15-P25, BOT1 : 15-P25,
BOT2 : BOT2 : BOT2 :
STIRRUPS : 8.0-P12 @120 STIRRUPS : 8.0-P12 @120 STIRRUPS : 8.0-P12 @120

3. Bending Moment Capacity


END-I MID END-J
Negative Moment (M_Ed) 3104.99 4724.15 2218.43
(-) Load Combination No. 15- 15- 14-
Factored Strength (M_Rd) 12203.33 12203.33 12203.33
Check Ratio (M_Ed/M_Rd) 0.2544 0.3871 0.1818

Positive Moment (M_Ed) 0.00 0.00 0.00


(+) Load Combination No. 2- 2- 2-
Factored Strength (M_Rd) 6297.49 0.00 6297.49
Check Ratio (M_Ed/M_Rd) 0.0000 0.0000 0.0000

Using Rebar Top (As_top) 0.0147 0.0147 0.0147


Using Rebar Bot (As_bot) 0.0074 0.0000 0.0074

4. Shear Capacity
END-I MID END-J
Load Combination No. 15+ 15+ 20-
Factored Shear Force (V_Ed) 2247.94 2247.94 1926.35
Shear Strength by Conc.(V_Rdc) 1713.26 1713.26 1713.26
Shear Strength by Rebar.(V_Rds) 5619.52 5619.52 5619.52
Using Shear Reinf. (Asw) 0.0072 0.0072 0.0072
Using Stirrups Spacing 8.0-P12 @120 8.0-P12 @120 8.0-P12 @120
Check Ratio 0.3066 0.3066 0.2627
Modeling, Integrated Design & Analysis Software Print Date/Time : 11/18/2017 16:48
http://www.MidasUser.com
MIDAS/Civil V 8.6.0
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
 MIDAS/Civil ‐ RC‐Beam Checking   [ IRC:112‐2011 ]                              Civil 2017
==========================================================================================

       +============================================================+
       |  MIDAS(Modeling, Integrated Design & Analysis So ware)    |
       |  MIDAS/Civil ‐ Design & checking system for windows        |
       +============================================================+
       |  RC‐Member(Beam or Column) Analysis and Design             |
       |  Based On  AASHTO‐LRFD12, AASHTO‐LRFD07, AASHTO‐LRFD02,    |
       |            AASHTO‐LFD96, ACI318‐02, CSA‐S6‐00,             |
       |            Eurocode2‐2:05, SNiP 2.05.03‐84*,               |
       |            SP 35.13330.2011, SNiP 2.05.03‐84*(MKS),        |
       |            SP 35.13330.2011(MKS), IRC:21‐2000,             |
       |            IRC:112‐2011                                    |
       |                                                            |
       |                                             (c)SINCE 1989  |
       +============================================================+
       |  MIDAS Informa on Technology Co.,Ltd.         (MIDAS IT)  |
       |  MIDAS IT Design Development Team                          |
       +============================================================+
       |            HomePage : www.MidasUser.com                    |
       +============================================================+
       |  MIDAS/Civil  Version 8.6.0                                |
       +============================================================+

    *.DEFINITION OF LOAD COMBINATIONS WITH SCALING UP FACTORS.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
     LCB  C    Loadcase Name(Factor) + Loadcase Name(Factor) + Loadcase Name(Factor)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
       1  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
      2+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 0.200)
      2‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 0.200)
      3+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 0.200)
      3‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 0.200)
      4+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 1.000) +  Braking Load( 1.000)
      4‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 1.000) +  Braking Load( 1.000)

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 1 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

      5+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 1.000) +  Braking Load( 1.000)
      5‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 1.000) +  Braking Load( 1.000)
      6+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 0.200) +  Braking Load( 0.200) +          EQ X( 1.000)
      6‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 0.200) +  Braking Load( 0.200) +          EQ X( 1.000)
      7+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 0.200) +  Braking Load( 0.200) +          EQ X(‐1.000)
      7‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             +2 Lanes of Class A( 0.200) +  Braking Load( 0.200) +          EQ X(‐1.000)
      8+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 0.200) +  Braking Load( 0.200) +          EQ X( 1.000)
      8‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 0.200) +  Braking Load( 0.200) +          EQ X( 1.000)
      9+  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 0.200) +  Braking Load( 0.200) +          EQ X(‐1.000)
      9‐  1               SW( 1.000) +            CB( 1.000) +            WC( 1.000)
             + 1 Lane of 70R( 0.200) +  Braking Load( 0.200) +          EQ X(‐1.000)
     10+  1     Braking Load( 0.200) +          EQ Y( 1.000) +2 Lanes of Class A( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     10‐  1     Braking Load( 0.200) +          EQ Y( 1.000) +2 Lanes of Class A( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     11+  1     Braking Load( 0.200) +          EQ Y(‐1.000) +2 Lanes of Class A( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     11‐  1     Braking Load( 0.200) +          EQ Y(‐1.000) +2 Lanes of Class A( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     12+  1     Braking Load( 0.200) +          EQ Y( 1.000) + 1 Lane of 70R( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     12‐  1     Braking Load( 0.200) +          EQ Y( 1.000) + 1 Lane of 70R( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     13+  1     Braking Load( 0.200) +          EQ Y(‐1.000) + 1 Lane of 70R( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     13‐  1     Braking Load( 0.200) +          EQ Y(‐1.000) + 1 Lane of 70R( 0.200)
             +            SW( 1.000) +            CB( 1.000) +            WC( 1.000)
     14+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 1.500) +2 Lanes of Class A( 1.500)
     14‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 1.500) +2 Lanes of Class A( 1.500)
     15+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 1.500) + 1 Lane of 70R( 1.500)
     15‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 1.500) + 1 Lane of 70R( 1.500)
     16+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ X( 1.500)

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 2 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

     16‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ X( 1.500)
     17+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ X(‐1.500)
     17‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ X(‐1.500)
     18+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ X( 1.500)
     18‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ X( 1.500)
     19+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ X(‐1.500)
     19‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ X(‐1.500)
     20+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ Y( 1.500)
     20‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ Y( 1.500)
     21+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ Y(‐1.500)
     21‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) +2 Lanes of Class A( 0.200) +          EQ Y(‐1.500)
     22+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ Y( 1.500)
     22‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ Y( 1.500)
     23+  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ Y(‐1.500)
     23‐  1               SW( 1.350) +            CB( 1.350) +            WC( 1.750)
             +  Braking Load( 0.200) + 1 Lane of 70R( 0.200) +          EQ Y(‐1.500)
     24+  2               SW( 1.000) +            CB( 1.000) +            WC( 1.200)
             +2 Lanes of Class A( 1.000) +  Braking Load( 1.000)
     24‐  2               SW( 1.000) +            CB( 1.000) +            WC( 1.200)
             +2 Lanes of Class A( 1.000) +  Braking Load( 1.000)
     25+  2               SW( 1.000) +            CB( 1.000) +            WC( 1.200)
             + 1 Lane of 70R( 1.000) +  Braking Load( 1.000)
     25‐  2               SW( 1.000) +            CB( 1.000) +            WC( 1.200)
             + 1 Lane of 70R( 1.000) +  Braking Load( 1.000)
      26  2               SW( 1.000) +            CB( 1.000) +            WC( 1.200)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 3 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
 MIDAS/Civil ‐ RC‐Beam Checking   [ IRC:112‐2011 ]                              Civil 2017
==========================================================================================

      *.MIDAS/Civil ‐ RC‐BEAM Analysis/Design Program.

      *.PROJECT       : 
      *.DESIGN CODE   : IRC:112‐2011,    *.UNIT SYSTEM : kN, m
      *.MEMBER        : Member Type = BEAM,   MEMB =     3

      *.DESCRIPTION OF BEAM DATA (iSEC =     3) : PierCap C
        Sec on Type : Rectangle (RECT)
        Beam Length (Span)             =         1.450 m.
        Sec on Depth (Hc)             =         2.100 m.
        Sec on Width (Bc)             =         2.800 m.
        Concrete Strength (fck)        =     35000.000 KPa.
        Main Rebar Strength (fy)       =    500000.000 KPa.
        S rrups Strength (fyw)        =    500000.000 KPa.
        Modulus of Elas city (Es)     = 200000000.000 KPa.

      *.FORCES AND MOMENTS AT CHECK POINT <I> :
        Posi ve Bending Moment P‐M_Ed =        0.00 kN‐m.,  LCB =  2‐
        Nega ve Bending Moment N‐M_Ed =     3104.99 kN‐m.,  LCB = 15‐
        Shear Force             V_Ed   =     2247.94 kN.  ,  LCB = 15+

      *.REINFORCEMENT PATTERN : 
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           Loca on    i     di( m.)       Rebar    Asi( m^2.)
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           Top         1      0.091       15‐P25      0.00736
           Top         2      0.141       15‐P25      0.00736
           Bo om      1      0.091       15‐P25      0.00736
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           S rrups : 8.0‐P12 @120

 ===============================================================================
    [[[*]]]   ANALYZE NEGATIVE BENDING MOMENT CAPACITY.
 ===============================================================================

      ( ). Compute design parameters.
           ‐. lambda = 0.8000  ( fck <= 60 MPa.)
           ‐. eta    = 1.0000  ( fck <= 60 MPa.)
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 4 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fyd     = fyk / Gamma_s =  434782.609 KPa.

      ( ). Check area of tensile reinforcement (Rectangular‐beam).
           ‐. fyk     = 500000.0000 KPa.
           ‐. fctm    = 0.259 * fck^(2/3)        =   2771.2676 KPa.
           ‐. As.min  = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ]    =     0.0093 m^2.
           ‐. As.max  = 0.04 * (Bc*Hc)                  =     0.2352 m^2.
           ‐. As.prov =     0.0147 m^2.
           ‐. As.min < As.prov < As.max  ‐‐‐>  O.K !

      ( ). Search for neutral axis......     Unit :  kN.,  m.
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
             Trial         c          C           T        Ra o
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
              1‐st     0.186     6511.28     6403.04     101.690
              2‐nd     0.180     6319.78     6403.04      98.700
              3‐rd     0.183     6415.53     6403.04     100.195
              4‐th     0.182     6367.65     6403.04      99.447
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

      ( ). Check moment capacity.
           ‐. c                   =     0.1818 m.
           ‐. a  = lambda * c     =     0.1455 m.
           ‐. C  = eta*fcd*(hf*bf+Bc*(a‐hf)) =       6367.65 kN.
           ‐. T  = fyd * As       =       6403.04 kN.
           ‐. hc                  =     1.0500 m.
           ‐. M_Rd  = C*(hc‐a/2) + T*(d‐hc)  =      12203.33 kN‐m.
           ‐. M_Ed/M_Rd     =   0.254  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   ANALYZE POSITIVE BENDING MOMENT CAPACITY.
 ===============================================================================

      ( ). Compute design parameters.
           ‐. lambda = 0.8000  ( fck <= 60 MPa.)
           ‐. eta    = 1.0000  ( fck <= 60 MPa.)
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.
           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fyd     = fyk / Gamma_s =  434782.609 KPa.

      ( ). Check area of tensile reinforcement (Rectangular‐beam).
           ‐. fyk     = 500000.0000 KPa.
           ‐. fctm    = 0.259 * fck^(2/3)        =   2771.2676 KPa.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 5 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

           ‐. As.min  = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ]    =     0.0094 m^2.
           ‐. As.max  = 0.04 * (Bc*Hc)                  =     0.2352 m^2.
           ‐. As.prov =     0.0074 m^2.
           ‐. As.prov < As.min  ‐‐‐>  Not Acceptable !!!

      ( ). Search for neutral axis......     Unit :  kN.,  m.
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
             Trial         c          C           T        Ra o
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
              1‐st     0.098     3447.15     3201.52     107.672
              2‐nd     0.093     3255.64     3201.52     101.690
              3‐rd     0.090     3159.89     3201.52      98.700
              4‐th     0.092     3207.76     3201.52     100.195
              5‐th     0.091     3183.83     3201.52      99.447
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

      ( ). Check moment capacity.
           ‐. c                   =     0.0909 m.
           ‐. a  = lambda * c     =     0.0727 m.
           ‐. C  = eta*fcd*(hf*bf+Bc*(a‐hf)) =       3183.83 kN.
           ‐. T  = fyd * As       =       3201.52 kN.
           ‐. hc                  =     1.0500 m.
           ‐. M_Rd  = C*(hc‐a/2) + T*(d‐hc)  =       6297.49 kN‐m.
           ‐. M_Ed/M_Rd     =   0.000  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   ANALYZE SHEAR CAPACITY.
 ===============================================================================
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.
           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fywd    = fyw / Gamma_s =  434782.609 KPa.
           ‐. Nu     = 0.6*(1.0‐fck/310)       =      0.5323  (fck in MPa)

      ( ). Calculate shear strength of concrete.
           ‐. V_Ed   =    2247.936 kN.
           ‐. d      =    1.984 m.
           ‐. bw     =    2.800 m.
           ‐. K      = MIN[ 1.0+sqrt(200/d), 2.0 ]  =      1.3175  (by d unit is mm).
           ‐. Asl    =     0.01473 m^2.  (Area of tensile reinforcement).
           ‐. Rhol   = Asl/(bw*d)   =     0.00265
           ‐. V_Rdc1 = [ 0.12*K*(80*Rhol*fck)^(1/3) ]*bw*d =    1713.257 kN.
           ‐. V_Rdc2 = [ 0.031*K^(3/2)*sqrt(fck) ]*bw*d      =    1540.712 kN.
           ‐. V_Rdc  = MAX[ V_Rdc1, V_Rdc2 ] =    1713.257 kN.
           ‐. Vwd    = V_Ed (V_Rdc < V_Ed)  ‐‐‐>  Shear reinforcement is required.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 6 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

      ( ). Check crushing of concrete.
           ‐. Theta  =     45.0000 (deg)
           ‐. V_RdMax= 1.0*Nu*fcd/{cot(Theta)+tan(Theta)}*bw*0.9*d =   20801.088 kN.
           ‐. V_Ed < V_RdMax  ‐‐‐> Acceptable !!!

      ( ). Calculate required shear reinforcement. ( Asw1 =  0.00011 m^2. )
           ‐. Asw/s1 = Vwd / (0.9*fywd*d)   =     0.00290 m^2/m.
           ‐. Calculate spacing s1          =     0.31248 m.
           ‐. Rhow   = 0.072*sqrt(fck)/fyw   =     0.00085  (by concrete and steel classes).
           ‐. Smax1  = Asw / (bw*Rhow)      =     0.37931 m.
           ‐. Smax2  = 0.75*d               =     1.48800 m.
           ‐. Applied spacing s   = MIN[ s1, Smax1, Smax2 ] =     0.31248 m.
           ‐. N_leg  =  8
           ‐. Asw/s  = N_leg*Asw1 / s           =     0.00290 m^2/m.
           ‐. Aswmax/s = 0.5*1.0*Nu*fcd*bw/fywd =     0.02679 m^2/m.
          ‐. Asw_use/s_use = N_leg*Asw1 / s_use =     0.00724 m^2/m.
           ‐. Asw < Asw_use  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   CHECK STRESS LIMITATION.
 ===============================================================================

      ( ). Calculate stress of top.
           ‐. LCB    =  25‐
           ‐. k1     =     0.48000
           ‐. k3     =     0.80000

           ( Assumed Uncracked Sec on )

           ‐. Mu     =     2195.82 kN‐m.
           ‐. n      =    12.38074( Long Term ).
           ‐. fctm   = 0.259 * fck^(2/3)        =  2771.26757 KPa.
           ‐. fr1    = (1.6 ‐ H/1000) * fctm   = ‐1385.63379 KPa.
           ‐. fr     = MAX[ fctm, fr1 ]        =  2771.26757 KPa.
           ‐. z_bar  =      1.06242 m.
           ‐. Iyy    =      2.38324 m^4.
           ‐. Ss_con = Mu*(H‐z_bar)/Iyy            =   955.98044 KPa.
           ‐. Ss_stl = Mu*(d‐z_bar)*n/Iyy  = 10512.51939 KPa.
              Ss_con < fr                         ‐‐‐> O.K !
              Ss_stl < k3*fyk=400000.00000 KPa.   ‐‐‐> O.K !

 ===============================================================================
    [[[*]]]   ANALYZE CRACK.
 ===============================================================================

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 7 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

 ===============================================================================
    [[[*]]]   CHECK DEFLECTIONS.
 ===============================================================================

      ( ). Compute Maximum Deflec on.
           ‐. LCB      =   26 (Quasi‐permanent).
           ‐. Posi on =     1.400 m. From i‐end(Node 4).
           ‐. DAF      =     1.000 (Deflec on Amplifica on Factor)
           ‐. Def      = 5.338e‐005 * DAF = 5.338e‐005 m.
           ‐. Def_Lim  = L /  250.000 =     0.011 m.
              Def < Def_Lim   ‐‐‐>  O.K !

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 8 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
 MIDAS/Civil ‐ RC‐Beam Checking   [ IRC:112‐2011 ]                              Civil 2017
==========================================================================================

      *.MIDAS/Civil ‐ RC‐BEAM Analysis/Design Program.

      *.PROJECT       : 
      *.DESIGN CODE   : IRC:112‐2011,    *.UNIT SYSTEM : kN, m
      *.MEMBER        : Member Type = BEAM,   MEMB =     3

      *.DESCRIPTION OF BEAM DATA (iSEC =     3) : PierCap C
        Sec on Type : Rectangle (RECT)
        Beam Length (Span)             =         2.800 m.
        Sec on Depth (Hc)             =         2.100 m.
        Sec on Width (Bc)             =         2.800 m.
        Concrete Strength (fck)        =     35000.000 KPa.
        Main Rebar Strength (fy)       =    500000.000 KPa.
        S rrups Strength (fyw)        =    500000.000 KPa.
        Modulus of Elas city (Es)     = 200000000.000 KPa.

      *.FORCES AND MOMENTS AT CHECK POINT <M> :
        Posi ve Bending Moment P‐M_Ed =        0.00 kN‐m.,  LCB =  2‐
        Nega ve Bending Moment N‐M_Ed =     4724.15 kN‐m.,  LCB = 15‐
        Shear Force             V_Ed   =     2247.94 kN.  ,  LCB = 15+

      *.REINFORCEMENT PATTERN : 
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           Loca on    i     di( m.)       Rebar    Asi( m^2.)
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           Top         1      0.091       15‐P25      0.00736
           Top         2      0.141       15‐P25      0.00736
           Bo om      1      0.091       15‐P25      0.00736
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           S rrups : 8.0‐P12 @120

 ===============================================================================
    [[[*]]]   ANALYZE NEGATIVE BENDING MOMENT CAPACITY.
 ===============================================================================

      ( ). Compute design parameters.
           ‐. lambda = 0.8000  ( fck <= 60 MPa.)
           ‐. eta    = 1.0000  ( fck <= 60 MPa.)
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 9 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fyd     = fyk / Gamma_s =  434782.609 KPa.

      ( ). Check area of tensile reinforcement (Rectangular‐beam).
           ‐. fyk     = 500000.0000 KPa.
           ‐. fctm    = 0.259 * fck^(2/3)        =   2771.2676 KPa.
           ‐. As.min  = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ]    =     0.0093 m^2.
           ‐. As.max  = 0.04 * (Bc*Hc)                  =     0.2352 m^2.
           ‐. As.prov =     0.0147 m^2.
           ‐. As.min < As.prov < As.max  ‐‐‐>  O.K !

      ( ). Search for neutral axis......     Unit :  kN.,  m.
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
             Trial         c          C           T        Ra o
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
              1‐st     0.186     6511.28     6403.04     101.690
              2‐nd     0.180     6319.78     6403.04      98.700
              3‐rd     0.183     6415.53     6403.04     100.195
              4‐th     0.182     6367.65     6403.04      99.447
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

      ( ). Check moment capacity.
           ‐. c                   =     0.1818 m.
           ‐. a  = lambda * c     =     0.1455 m.
           ‐. C  = eta*fcd*(hf*bf+Bc*(a‐hf)) =       6367.65 kN.
           ‐. T  = fyd * As       =       6403.04 kN.
           ‐. hc                  =     1.0500 m.
           ‐. M_Rd  = C*(hc‐a/2) + T*(d‐hc)  =      12203.33 kN‐m.
           ‐. M_Ed/M_Rd     =   0.387  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   ANALYZE POSITIVE BENDING MOMENT CAPACITY.
 ===============================================================================

      ( ). Compute design parameters.
           ‐. lambda = 0.8000  ( fck <= 60 MPa.)
           ‐. eta    = 1.0000  ( fck <= 60 MPa.)
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.
           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fyd     = fyk / Gamma_s =  434782.609 KPa.

      ( ). Check area of tensile reinforcement (Rectangular‐beam).
           ‐. fyk     = 500000.0000 KPa.
           ‐. fctm    = 0.259 * fck^(2/3)        =   2771.2676 KPa.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 10 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

           ‐. As.min  = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ]    =     0.0094 m^2.
           ‐. As.max  = 0.04 * (Bc*Hc)                  =     0.2352 m^2.
           ‐. As.prov =     0.0074 m^2.
           ‐. As.prov < As.min  ‐‐‐>  Not Acceptable !!!

      ( ). Search for neutral axis......     Unit :  kN.,  m.
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
             Trial         c          C           T        Ra o
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
              1‐st     0.098     3447.15     3201.52     107.672
              2‐nd     0.093     3255.64     3201.52     101.690
              3‐rd     0.090     3159.89     3201.52      98.700
              4‐th     0.092     3207.76     3201.52     100.195
              5‐th     0.091     3183.83     3201.52      99.447
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

      ( ). Check moment capacity.
           ‐. c                   =     0.0909 m.
           ‐. a  = lambda * c     =     0.0727 m.
           ‐. C  = eta*fcd*(hf*bf+Bc*(a‐hf)) =       3183.83 kN.
           ‐. T  = fyd * As       =       3201.52 kN.
           ‐. hc                  =     1.0500 m.
           ‐. M_Rd  = C*(hc‐a/2) + T*(d‐hc)  =       6297.49 kN‐m.
           ‐. M_Ed/M_Rd     =   0.000  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   ANALYZE SHEAR CAPACITY.
 ===============================================================================
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.
           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fywd    = fyw / Gamma_s =  434782.609 KPa.
           ‐. Nu     = 0.6*(1.0‐fck/310)       =      0.5323  (fck in MPa)

      ( ). Calculate shear strength of concrete.
           ‐. V_Ed   =    2247.936 kN.
           ‐. d      =    1.984 m.
           ‐. bw     =    2.800 m.
           ‐. K      = MIN[ 1.0+sqrt(200/d), 2.0 ]  =      1.3175  (by d unit is mm).
           ‐. Asl    =     0.01473 m^2.  (Area of tensile reinforcement).
           ‐. Rhol   = Asl/(bw*d)   =     0.00265
           ‐. V_Rdc1 = [ 0.12*K*(80*Rhol*fck)^(1/3) ]*bw*d =    1713.257 kN.
           ‐. V_Rdc2 = [ 0.031*K^(3/2)*sqrt(fck) ]*bw*d      =    1540.712 kN.
           ‐. V_Rdc  = MAX[ V_Rdc1, V_Rdc2 ] =    1713.257 kN.
           ‐. Vwd    = V_Ed (V_Rdc < V_Ed)  ‐‐‐>  Shear reinforcement is required.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 11 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

      ( ). Check crushing of concrete.
           ‐. Theta  =     45.0000 (deg)
           ‐. V_RdMax= 1.0*Nu*fcd/{cot(Theta)+tan(Theta)}*bw*0.9*d =   20801.088 kN.
           ‐. V_Ed < V_RdMax  ‐‐‐> Acceptable !!!

      ( ). Calculate required shear reinforcement. ( Asw1 =  0.00011 m^2. )
           ‐. Asw/s1 = Vwd / (0.9*fywd*d)   =     0.00290 m^2/m.
           ‐. Calculate spacing s1          =     0.31248 m.
           ‐. Rhow   = 0.072*sqrt(fck)/fyw   =     0.00085  (by concrete and steel classes).
           ‐. Smax1  = Asw / (bw*Rhow)      =     0.37931 m.
           ‐. Smax2  = 0.75*d               =     1.48800 m.
           ‐. Applied spacing s   = MIN[ s1, Smax1, Smax2 ] =     0.31248 m.
           ‐. N_leg  =  8
           ‐. Asw/s  = N_leg*Asw1 / s           =     0.00290 m^2/m.
           ‐. Aswmax/s = 0.5*1.0*Nu*fcd*bw/fywd =     0.02679 m^2/m.
           ‐. Asw_use/s_use = N_leg*Asw1 / s_use =     0.00724 m^2/m.
           ‐. Asw < Asw_use  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   CHECK STRESS LIMITATION.
 ===============================================================================

      ( ). Calculate stress of top.
           ‐. LCB    =  25‐
           ‐. k1     =     0.48000
           ‐. k3     =     0.80000

           ( Assumed Uncracked Sec on )

           ‐. Mu     =     3358.09 kN‐m.
           ‐. n      =    12.38074( Long Term ).
           ‐. fctm   = 0.259 * fck^(2/3)        =  2771.26757 KPa.
           ‐. fr1    = (1.6 ‐ H/1000) * fctm   = ‐1385.63379 KPa.
           ‐. fr     = MAX[ fctm, fr1 ]        =  2771.26757 KPa.
           ‐. z_bar  =      1.06242 m.
           ‐. Iyy    =      2.38324 m^4.
           ‐. Ss_con = Mu*(H‐z_bar)/Iyy            =  1461.99267 KPa.
           ‐. Ss_stl = Mu*(d‐z_bar)*n/Iyy  = 16076.92544 KPa.
              Ss_con < fr                         ‐‐‐> O.K !
              Ss_stl < k3*fyk=400000.00000 KPa.   ‐‐‐> O.K !

 ===============================================================================
    [[[*]]]   ANALYZE CRACK.
 ===============================================================================

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 12 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

 ===============================================================================
    [[[*]]]   CHECK DEFLECTIONS.
 ===============================================================================

      ( ). Compute Maximum Deflec on.
           ‐. LCB      =   26 (Quasi‐permanent).
           ‐. Posi on =     1.400 m. From i‐end(Node 4).
           ‐. DAF      =     1.000 (Deflec on Amplifica on Factor)
           ‐. Def      = 5.338e‐005 * DAF = 5.338e‐005 m.
           ‐. Def_Lim  = L /  250.000 =     0.011 m.
              Def < Def_Lim   ‐‐‐>  O.K !

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 13 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
 MIDAS/Civil ‐ RC‐Beam Checking   [ IRC:112‐2011 ]                              Civil 2017
==========================================================================================

      *.MIDAS/Civil ‐ RC‐BEAM Analysis/Design Program.

      *.PROJECT       : 
      *.DESIGN CODE   : IRC:112‐2011,    *.UNIT SYSTEM : kN, m
      *.MEMBER        : Member Type = BEAM,   MEMB =     3

      *.DESCRIPTION OF BEAM DATA (iSEC =     3) : PierCap C
        Sec on Type : Rectangle (RECT)
        Beam Length (Span)             =         2.800 m.
        Sec on Depth (Hc)             =         2.100 m.
        Sec on Width (Bc)             =         2.800 m.
        Concrete Strength (fck)        =     35000.000 KPa.
        Main Rebar Strength (fy)       =    500000.000 KPa.
        S rrups Strength (fyw)        =    500000.000 KPa.
        Modulus of Elas city (Es)     = 200000000.000 KPa.

      *.FORCES AND MOMENTS AT CHECK POINT <J> :
        Posi ve Bending Moment P‐M_Ed =        0.00 kN‐m.,  LCB =  2‐
        Nega ve Bending Moment N‐M_Ed =     2218.43 kN‐m.,  LCB = 14‐
        Shear Force             V_Ed   =     1926.35 kN.  ,  LCB = 20‐

      *.REINFORCEMENT PATTERN : 
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           Loca on    i     di( m.)       Rebar    Asi( m^2.)
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           Top         1      0.091       15‐P25      0.00736
           Top         2      0.141       15‐P25      0.00736
           Bo om      1      0.091       15‐P25      0.00736
        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
           S rrups : 8.0‐P12 @120

 ===============================================================================
    [[[*]]]   ANALYZE NEGATIVE BENDING MOMENT CAPACITY.
 ===============================================================================

      ( ). Compute design parameters.
           ‐. lambda = 0.8000  ( fck <= 60 MPa.)
           ‐. eta    = 1.0000  ( fck <= 60 MPa.)
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 14 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fyd     = fyk / Gamma_s =  434782.609 KPa.

      ( ). Check area of tensile reinforcement (Rectangular‐beam).
           ‐. fyk     = 500000.0000 KPa.
           ‐. fctm    = 0.259 * fck^(2/3)        =   2771.2676 KPa.
           ‐. As.min  = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ]    =     0.0093 m^2.
           ‐. As.max  = 0.04 * (Bc*Hc)                  =     0.2352 m^2.
           ‐. As.prov =     0.0147 m^2.
           ‐. As.min < As.prov < As.max  ‐‐‐>  O.K !

      ( ). Search for neutral axis......     Unit :  kN.,  m.
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
             Trial         c          C           T        Ra o
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
              1‐st     0.186     6511.28     6403.04     101.690
              2‐nd     0.180     6319.78     6403.04      98.700
              3‐rd     0.183     6415.53     6403.04     100.195
              4‐th     0.182     6367.65     6403.04      99.447
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

      ( ). Check moment capacity.
           ‐. c                   =     0.1818 m.
           ‐. a  = lambda * c     =     0.1455 m.
           ‐. C  = eta*fcd*(hf*bf+Bc*(a‐hf)) =       6367.65 kN.
           ‐. T  = fyd * As       =       6403.04 kN.
           ‐. hc                  =     1.0500 m.
           ‐. M_Rd  = C*(hc‐a/2) + T*(d‐hc)  =      12203.33 kN‐m.
           ‐. M_Ed/M_Rd     =   0.182  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   ANALYZE POSITIVE BENDING MOMENT CAPACITY.
 ===============================================================================

      ( ). Compute design parameters.
           ‐. lambda = 0.8000  ( fck <= 60 MPa.)
           ‐. eta    = 1.0000  ( fck <= 60 MPa.)
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.
           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fyd     = fyk / Gamma_s =  434782.609 KPa.

      ( ). Check area of tensile reinforcement (Rectangular‐beam).
           ‐. fyk     = 500000.0000 KPa.
           ‐. fctm    = 0.259 * fck^(2/3)        =   2771.2676 KPa.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 15 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

           ‐. As.min  = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ]    =     0.0094 m^2.
           ‐. As.max  = 0.04 * (Bc*Hc)                  =     0.2352 m^2.
           ‐. As.prov =     0.0074 m^2.
           ‐. As.prov < As.min  ‐‐‐>  Not Acceptable !!!

      ( ). Search for neutral axis......     Unit :  kN.,  m.
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
             Trial         c          C           T        Ra o
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
              1‐st     0.098     3447.15     3201.52     107.672
              2‐nd     0.093     3255.64     3201.52     101.690
              3‐rd     0.090     3159.89     3201.52      98.700
              4‐th     0.092     3207.76     3201.52     100.195
              5‐th     0.091     3183.83     3201.52      99.447
           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

      ( ). Check moment capacity.
           ‐. c                   =     0.0909 m.
           ‐. a  = lambda * c     =     0.0727 m.
           ‐. C  = eta*fcd*(hf*bf+Bc*(a‐hf)) =       3183.83 kN.
           ‐. T  = fyd * As       =       3201.52 kN.
           ‐. hc                  =     1.0500 m.
           ‐. M_Rd  = C*(hc‐a/2) + T*(d‐hc)  =       6297.49 kN‐m.
           ‐. M_Ed/M_Rd     =   0.000  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   ANALYZE SHEAR CAPACITY.
 ===============================================================================
           ‐. Gamma_c = 1.50  (for Fundamental).
           ‐. Alpha_cc= 0.67  (Default or User Defined).
           ‐. fcd     = Alpha_cc * fck / Gamma_c =   15633.333 KPa.
           ‐. Gamma_s = 1.15  (for Fundamental).
           ‐. fywd    = fyw / Gamma_s =  434782.609 KPa.
           ‐. Nu     = 0.6*(1.0‐fck/310)       =      0.5323  (fck in MPa)

      ( ). Calculate shear strength of concrete.
           ‐. V_Ed   =    1926.352 kN.
           ‐. d      =    1.984 m.
           ‐. bw     =    2.800 m.
           ‐. K      = MIN[ 1.0+sqrt(200/d), 2.0 ]  =      1.3175  (by d unit is mm).
           ‐. Asl    =     0.01473 m^2.  (Area of tensile reinforcement).
           ‐. Rhol   = Asl/(bw*d)   =     0.00265
           ‐. V_Rdc1 = [ 0.12*K*(80*Rhol*fck)^(1/3) ]*bw*d =    1713.257 kN.
           ‐. V_Rdc2 = [ 0.031*K^(3/2)*sqrt(fck) ]*bw*d      =    1540.712 kN.
           ‐. V_Rdc  = MAX[ V_Rdc1, V_Rdc2 ] =    1713.257 kN.
           ‐. Vwd    = V_Ed (V_Rdc < V_Ed)  ‐‐‐>  Shear reinforcement is required.

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 16 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

      ( ). Check crushing of concrete.
           ‐. Theta  =     45.0000 (deg)
           ‐. V_RdMax= 1.0*Nu*fcd/{cot(Theta)+tan(Theta)}*bw*0.9*d =   20801.088 kN.
           ‐. V_Ed < V_RdMax  ‐‐‐> Acceptable !!!

      ( ). Calculate required shear reinforcement. ( Asw1 =  0.00011 m^2. )
           ‐. Asw/s1 = Vwd / (0.9*fywd*d)   =     0.00248 m^2/m.
           ‐. Calculate spacing s1          =     0.36465 m.
           ‐. Rhow   = 0.072*sqrt(fck)/fyw   =     0.00085  (by concrete and steel classes).
           ‐. Smax1  = Asw / (bw*Rhow)      =     0.37931 m.
           ‐. Smax2  = 0.75*d               =     1.48800 m.
           ‐. Applied spacing s   = MIN[ s1, Smax1, Smax2 ] =     0.36465 m.
           ‐. N_leg  =  8
           ‐. Asw/s  = N_leg*Asw1 / s           =     0.00248 m^2/m.
           ‐. Aswmax/s = 0.5*1.0*Nu*fcd*bw/fywd =     0.02679 m^2/m.
           ‐. Asw_use/s_use = N_leg*Asw1 / s_use =     0.00724 m^2/m.
           ‐. Asw < Asw_use  ‐‐‐>  O.K !

 ===============================================================================
    [[[*]]]   CHECK STRESS LIMITATION.
 ===============================================================================

      ( ). Calculate stress of top.
           ‐. LCB    =  24‐
           ‐. k1     =     0.48000
           ‐. k3     =     0.80000

           ( Assumed Uncracked Sec on )

           ‐. Mu     =     1604.78 kN‐m.
           ‐. n      =    12.38074( Long Term ).
           ‐. fctm   = 0.259 * fck^(2/3)        =  2771.26757 KPa.
           ‐. fr1    = (1.6 ‐ H/1000) * fctm   = ‐1385.63379 KPa.
           ‐. fr     = MAX[ fctm, fr1 ]        =  2771.26757 KPa.
           ‐. z_bar  =      1.06242 m.
           ‐. Iyy    =      2.38324 m^4.
           ‐. Ss_con = Mu*(H‐z_bar)/Iyy            =   698.66357 KPa.
           ‐. Ss_stl = Mu*(d‐z_bar)*n/Iyy  =  7682.91277 KPa.
              Ss_con < fr                         ‐‐‐> O.K !
              Ss_stl < k3*fyk=400000.00000 KPa.   ‐‐‐> O.K !

 ===============================================================================
    [[[*]]]   ANALYZE CRACK.
 ===============================================================================

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 17 / 18 -
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
 PROJECT TITLE : ROBs Between AHM‐PLN

Company Geo Designs and Research Pvt Ltd Client DFCC

Author Geo Design Team File Name 24m span.rcs

 ===============================================================================
    [[[*]]]   CHECK DEFLECTIONS.
 ===============================================================================

      ( ). Compute Maximum Deflec on.
           ‐. LCB      =   26 (Quasi‐permanent).
           ‐. Posi on =     1.400 m. From i‐end(Node 4).
           ‐. DAF      =     1.000 (Deflec on Amplifica on Factor)
           ‐. Def      = 5.338e‐005 * DAF = 5.338e‐005 m.
           ‐. Def_Lim  = L /  250.000 =     0.011 m.
              Def < Def_Lim   ‐‐‐>  O.K !

Modeling, Integrated Design & Analysis Software


http://www.MidasUser.com
MIDAS/Civil V 8.6.0 - 18 / 18 -
Corbel Design
Material Data
concrete strength = 35 N/mm^2
steel grade = 500 N/mm^2
Strength Reduction Factor,ϕ = 0.85
Strength Reduction Factor,ϕ for Flexure = 0.9
Coefficient of friction,μ Concrete cast Monolithic = 1.4
The Value of λ Normal Weight Concrete = 1
Dimension Details of Corbel
Distance from Hammer Head to Concentrated Load,a = 1100 mm
Width of Corbel,b = 2800 mm
Height of Corbel,h = 1600 mm
Concrete cover in Corbel = 50 mm
Effective Depth of Corbel,d = 1534 mm

Design Force
Ultimate shear force(Vu) = 3458.6 kN
Minimum horizontal force (Nuc) = 691.72 kN
𝑁𝑢𝑐 = 0.2 × 𝑉𝑢

Ultimate Moment (Mu) = 3850.114 kN-m

𝑀𝑢 = 𝑉𝑢 × 𝑎 + 𝑁𝑢𝑐 × (ℎ − 𝑑)

Limitation Checking
∅ 0.2𝑓 ′ 𝑐 𝑏𝑤𝑑 = 25556.44 kN

∅ 5.5 𝑏𝑤𝑑 = 20080.06 kN

As Vu is Less than Both Values, Section is sufficient.

Reinforcement Calculation
Shear Friction Reinforcement = 5812.773 mm2

𝑉𝑢
𝐴𝑣𝑓 =
∅ × 𝑓𝑦 × 𝜇

Tension Reinforcement = 1627.576 mm2


𝑁𝑢𝑐
𝐴𝑛 =
∅ × 𝑓𝑦
Flexural Reinforcement = 6561.706 mm2
𝑀𝑢
𝐴𝑓 =
∅ × 𝑓𝑦 × (0.85𝑑)
Primary Tension Reinforcement = 8189.282 mm2

2
1 𝐴𝑠 ≥ × 𝐴𝑣𝑓 + 𝐴𝑛 = 5502.759 mm2
3
2 𝐴𝑠 ≥ 𝐴𝑓 + 𝐴𝑛 = 8189.282 mm2

Provided Tension Reinforcement = 14726.22 mm2


OK
Dia of Longitudinal Reinforcement = 25 mm
Nos of Bars = 30 Nos
Horizontal Reinforcement
𝐴ℎ = 0.5 × 𝐴𝑓 = 3280.853 mm2
Provided Horizontal Reinforcement 5428.672 mm2
OK
Dia of Bar = 12 mm
Numbers of Leg Provided = 8 Nos
Spacing Provided = 200 mm
Length upto Which Reinforcement will be provided = 1000 mm