LC 177 - 15
LC 177 - 15
LC 177 - 15
To,
THE SUPERITENDING ENGINEER
DESIGNS (R&B) CIRCLE,
GANDHINAGAR
SUBJECT: Submission of Design and Drawing for LC NO 177 for above mentioned Work.
Respected Sir,
With reference to above subject and reference letter, there was need of pile cap reorientation to
accommodate site conditions at proposed ROB. We have revised pile cap orientation and checked design
for same and it is safe.
Herewith we are submitting the below enclosed document of LC 177 (I.R KM 667/0 - 1) located between
block station Majadar & Timbachudi, for Approval.
No of
S.No Drawing Detail Drawing No. Revision
Copies
RCC Detail of
Pile – AP2 to GTH_-AHM_PLN_LC
1 R2 1
AP5 (To 177_05
Majadar)
RCC Detail of
Pier & Pilecap – GTH_AHM-
2 R0 1
AP1 to AP10 PLN_LC177_06
(To Majadar)
Design
3 - - 1
Document
Thanking you,
For,
Geo Designs and Research Pvt Ltd
Letter No. GTH/Design/LC 208 B-09 DATE: 20-11-17
To,
THE SUPERITENDING ENGINEER
DESIGNS (R&B) CIRCLE,
GANDHINAGAR
SUBJECT: Submission of Design and Drawing for LC NO 208 B for above mentioned Work.
Respected Sir,
Herewith we are submitting the below enclosed document of LC 208 B (Railway Ch. 706/9-707/0) located
between block station Unjha & Motidau, for Approval.
No of
S.No Drawing Detail Drawing No. Revision
Copies
RC Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
1 R0 1
AP1&AP7 to AP9 B_06
(To Valam)
Plan Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
2 R0 1
AP2 to AP6 (To B_07
Valam)
RC Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
3 R0 1
AP2 to AP6 (To B_08
Valam)
RC Details of Pier
Cap for LC 208-B GTH_Pier Cap_LC 208-
4 R0 1
AP10 (To Valam) B_09
5 Design Document - - 1
Thanking you,
For,
Geo Designs and Research Pvt Ltd
GTH/2015-16/018/LC177/Design/16 Date:-20/11/17
To,
THE SUPERINTENDING ENGINEER
DESIGNS(R&B) CIRCLE,
GANDHINAGAR
Here we have attached below document for above subject for your scrutiny and approval.
SR NO OF
Details of Particular DRAWING NO RIVISION
NO COPIES
Plan Details of Pier GTH_LC 177_Pier
1 Cap for LC 177 AP1 to Cap_04 R0 1
AP6 (To Majadar
Plan Details of Pier
Cap for LC 177 AP7 to GTH_LC 177_Pier
2 Cap_05 R0 1
AP8 & AP10 to AP12
(To Majadar)
RC Details of Pier Cap
for LC 177 AP1 to AP5 GTH_LC 177_Pier
3 Cap_06 R0 1
& AP8, AP12 (To
Majadar)
RC Details of Pier Cap GTH_LC 177_Pier
4 for LC 177 AP9 (To Cap_07 R0 1
Majadar)
RC Details of Pier Cap
for LC 177 AP to AP7 GTH_LC 177_Pier
5 Cap_08 R0 1
& AP10 to AP11 (To
Majadar)
6 Design Document - - 1
Thanking You,
For,
Geo Designs and Research Pvt Ltd
Letter No. GTH/Design/LC 179-12 DATE: 20-11-17
To,
Superintending Engineer
Designs (R&B) Circle,
Gandhinagar.
Name Of Work: - Consultancy Services For Preparation Of Detailed Project Report For
Railway Over Bridges At Various Locations On DFCC Route Between
Ahmedabad To Palanpur In State Of Gujarat.
Dear Sir,
Herewith we are submitting below enclosed document for above subject for your approval.
SR NO OF Remarks
Details of Particular DRAWING NO RIVISION
NO COPIES
Detail of
GTH_LC
1 Elastomeric R0 5 -
179_Bearing_01
Bearing
Thanking you,
For,
Geo Designs and Research Pvt Ltd
MIDAS/Civil RC Beam Checking Result
Company Project Title
Author Microsoft File Name D:\...\24m Straight\24m span.mcb
1. Design Information
Member Number: 3
Design Code : IRC:112-2011
Unit System : kN, m
Material Data : fck = 35000, fy = 500000, fyw = 500000 KPa
Beam Span : 2.8 m
Section Property: PierCap C (No : 3)
2. Section Diagram
[END-I] [MID] [END-J]
0.091
0.091
0.091
2.1
2.1
2.1
0.091
0.091
0.091
2.8 2.8 2.8
4. Shear Capacity
END-I MID END-J
Load Combination No. 15+ 15+ 20-
Factored Shear Force (V_Ed) 2247.94 2247.94 1926.35
Shear Strength by Conc.(V_Rdc) 1713.26 1713.26 1713.26
Shear Strength by Rebar.(V_Rds) 5619.52 5619.52 5619.52
Using Shear Reinf. (Asw) 0.0072 0.0072 0.0072
Using Stirrups Spacing 8.0-P12 @120 8.0-P12 @120 8.0-P12 @120
Check Ratio 0.3066 0.3066 0.2627
Modeling, Integrated Design & Analysis Software Print Date/Time : 11/18/2017 16:48
http://www.MidasUser.com
MIDAS/Civil V 8.6.0
Design Calcula on of PierCap for LC 208‐B
MIDAS/Civil
PROJECT TITLE : ROBs Between AHM‐PLN
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MIDAS/Civil ‐ RC‐Beam Checking [ IRC:112‐2011 ] Civil 2017
==========================================================================================
+============================================================+
| MIDAS(Modeling, Integrated Design & Analysis So ware) |
| MIDAS/Civil ‐ Design & checking system for windows |
+============================================================+
| RC‐Member(Beam or Column) Analysis and Design |
| Based On AASHTO‐LRFD12, AASHTO‐LRFD07, AASHTO‐LRFD02, |
| AASHTO‐LFD96, ACI318‐02, CSA‐S6‐00, |
| Eurocode2‐2:05, SNiP 2.05.03‐84*, |
| SP 35.13330.2011, SNiP 2.05.03‐84*(MKS), |
| SP 35.13330.2011(MKS), IRC:21‐2000, |
| IRC:112‐2011 |
| |
| (c)SINCE 1989 |
+============================================================+
| MIDAS Informa on Technology Co.,Ltd. (MIDAS IT) |
| MIDAS IT Design Development Team |
+============================================================+
| HomePage : www.MidasUser.com |
+============================================================+
| MIDAS/Civil Version 8.6.0 |
+============================================================+
*.DEFINITION OF LOAD COMBINATIONS WITH SCALING UP FACTORS.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
LCB C Loadcase Name(Factor) + Loadcase Name(Factor) + Loadcase Name(Factor)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
2+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 0.200)
2‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 0.200)
3+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 0.200)
3‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 0.200)
4+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 1.000) + Braking Load( 1.000)
4‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 1.000) + Braking Load( 1.000)
5+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 1.000) + Braking Load( 1.000)
5‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 1.000) + Braking Load( 1.000)
6+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 0.200) + Braking Load( 0.200) + EQ X( 1.000)
6‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 0.200) + Braking Load( 0.200) + EQ X( 1.000)
7+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 0.200) + Braking Load( 0.200) + EQ X(‐1.000)
7‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+2 Lanes of Class A( 0.200) + Braking Load( 0.200) + EQ X(‐1.000)
8+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 0.200) + Braking Load( 0.200) + EQ X( 1.000)
8‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 0.200) + Braking Load( 0.200) + EQ X( 1.000)
9+ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 0.200) + Braking Load( 0.200) + EQ X(‐1.000)
9‐ 1 SW( 1.000) + CB( 1.000) + WC( 1.000)
+ 1 Lane of 70R( 0.200) + Braking Load( 0.200) + EQ X(‐1.000)
10+ 1 Braking Load( 0.200) + EQ Y( 1.000) +2 Lanes of Class A( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
10‐ 1 Braking Load( 0.200) + EQ Y( 1.000) +2 Lanes of Class A( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
11+ 1 Braking Load( 0.200) + EQ Y(‐1.000) +2 Lanes of Class A( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
11‐ 1 Braking Load( 0.200) + EQ Y(‐1.000) +2 Lanes of Class A( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
12+ 1 Braking Load( 0.200) + EQ Y( 1.000) + 1 Lane of 70R( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
12‐ 1 Braking Load( 0.200) + EQ Y( 1.000) + 1 Lane of 70R( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
13+ 1 Braking Load( 0.200) + EQ Y(‐1.000) + 1 Lane of 70R( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
13‐ 1 Braking Load( 0.200) + EQ Y(‐1.000) + 1 Lane of 70R( 0.200)
+ SW( 1.000) + CB( 1.000) + WC( 1.000)
14+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 1.500) +2 Lanes of Class A( 1.500)
14‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 1.500) +2 Lanes of Class A( 1.500)
15+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 1.500) + 1 Lane of 70R( 1.500)
15‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 1.500) + 1 Lane of 70R( 1.500)
16+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ X( 1.500)
16‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ X( 1.500)
17+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ X(‐1.500)
17‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ X(‐1.500)
18+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ X( 1.500)
18‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ X( 1.500)
19+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ X(‐1.500)
19‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ X(‐1.500)
20+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ Y( 1.500)
20‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ Y( 1.500)
21+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ Y(‐1.500)
21‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) +2 Lanes of Class A( 0.200) + EQ Y(‐1.500)
22+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ Y( 1.500)
22‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ Y( 1.500)
23+ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ Y(‐1.500)
23‐ 1 SW( 1.350) + CB( 1.350) + WC( 1.750)
+ Braking Load( 0.200) + 1 Lane of 70R( 0.200) + EQ Y(‐1.500)
24+ 2 SW( 1.000) + CB( 1.000) + WC( 1.200)
+2 Lanes of Class A( 1.000) + Braking Load( 1.000)
24‐ 2 SW( 1.000) + CB( 1.000) + WC( 1.200)
+2 Lanes of Class A( 1.000) + Braking Load( 1.000)
25+ 2 SW( 1.000) + CB( 1.000) + WC( 1.200)
+ 1 Lane of 70R( 1.000) + Braking Load( 1.000)
25‐ 2 SW( 1.000) + CB( 1.000) + WC( 1.200)
+ 1 Lane of 70R( 1.000) + Braking Load( 1.000)
26 2 SW( 1.000) + CB( 1.000) + WC( 1.200)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MIDAS/Civil ‐ RC‐Beam Checking [ IRC:112‐2011 ] Civil 2017
==========================================================================================
*.MIDAS/Civil ‐ RC‐BEAM Analysis/Design Program.
*.PROJECT :
*.DESIGN CODE : IRC:112‐2011, *.UNIT SYSTEM : kN, m
*.MEMBER : Member Type = BEAM, MEMB = 3
*.DESCRIPTION OF BEAM DATA (iSEC = 3) : PierCap C
Sec on Type : Rectangle (RECT)
Beam Length (Span) = 1.450 m.
Sec on Depth (Hc) = 2.100 m.
Sec on Width (Bc) = 2.800 m.
Concrete Strength (fck) = 35000.000 KPa.
Main Rebar Strength (fy) = 500000.000 KPa.
S rrups Strength (fyw) = 500000.000 KPa.
Modulus of Elas city (Es) = 200000000.000 KPa.
*.FORCES AND MOMENTS AT CHECK POINT <I> :
Posi ve Bending Moment P‐M_Ed = 0.00 kN‐m., LCB = 2‐
Nega ve Bending Moment N‐M_Ed = 3104.99 kN‐m., LCB = 15‐
Shear Force V_Ed = 2247.94 kN. , LCB = 15+
*.REINFORCEMENT PATTERN :
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Loca on i di( m.) Rebar Asi( m^2.)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Top 1 0.091 15‐P25 0.00736
Top 2 0.141 15‐P25 0.00736
Bo om 1 0.091 15‐P25 0.00736
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
S rrups : 8.0‐P12 @120
===============================================================================
[[[*]]] ANALYZE NEGATIVE BENDING MOMENT CAPACITY.
===============================================================================
( ). Compute design parameters.
‐. lambda = 0.8000 ( fck <= 60 MPa.)
‐. eta = 1.0000 ( fck <= 60 MPa.)
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fyd = fyk / Gamma_s = 434782.609 KPa.
( ). Check area of tensile reinforcement (Rectangular‐beam).
‐. fyk = 500000.0000 KPa.
‐. fctm = 0.259 * fck^(2/3) = 2771.2676 KPa.
‐. As.min = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ] = 0.0093 m^2.
‐. As.max = 0.04 * (Bc*Hc) = 0.2352 m^2.
‐. As.prov = 0.0147 m^2.
‐. As.min < As.prov < As.max ‐‐‐> O.K !
( ). Search for neutral axis...... Unit : kN., m.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Trial c C T Ra o
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1‐st 0.186 6511.28 6403.04 101.690
2‐nd 0.180 6319.78 6403.04 98.700
3‐rd 0.183 6415.53 6403.04 100.195
4‐th 0.182 6367.65 6403.04 99.447
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
( ). Check moment capacity.
‐. c = 0.1818 m.
‐. a = lambda * c = 0.1455 m.
‐. C = eta*fcd*(hf*bf+Bc*(a‐hf)) = 6367.65 kN.
‐. T = fyd * As = 6403.04 kN.
‐. hc = 1.0500 m.
‐. M_Rd = C*(hc‐a/2) + T*(d‐hc) = 12203.33 kN‐m.
‐. M_Ed/M_Rd = 0.254 ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE POSITIVE BENDING MOMENT CAPACITY.
===============================================================================
( ). Compute design parameters.
‐. lambda = 0.8000 ( fck <= 60 MPa.)
‐. eta = 1.0000 ( fck <= 60 MPa.)
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fyd = fyk / Gamma_s = 434782.609 KPa.
( ). Check area of tensile reinforcement (Rectangular‐beam).
‐. fyk = 500000.0000 KPa.
‐. fctm = 0.259 * fck^(2/3) = 2771.2676 KPa.
‐. As.min = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ] = 0.0094 m^2.
‐. As.max = 0.04 * (Bc*Hc) = 0.2352 m^2.
‐. As.prov = 0.0074 m^2.
‐. As.prov < As.min ‐‐‐> Not Acceptable !!!
( ). Search for neutral axis...... Unit : kN., m.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Trial c C T Ra o
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1‐st 0.098 3447.15 3201.52 107.672
2‐nd 0.093 3255.64 3201.52 101.690
3‐rd 0.090 3159.89 3201.52 98.700
4‐th 0.092 3207.76 3201.52 100.195
5‐th 0.091 3183.83 3201.52 99.447
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
( ). Check moment capacity.
‐. c = 0.0909 m.
‐. a = lambda * c = 0.0727 m.
‐. C = eta*fcd*(hf*bf+Bc*(a‐hf)) = 3183.83 kN.
‐. T = fyd * As = 3201.52 kN.
‐. hc = 1.0500 m.
‐. M_Rd = C*(hc‐a/2) + T*(d‐hc) = 6297.49 kN‐m.
‐. M_Ed/M_Rd = 0.000 ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE SHEAR CAPACITY.
===============================================================================
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fywd = fyw / Gamma_s = 434782.609 KPa.
‐. Nu = 0.6*(1.0‐fck/310) = 0.5323 (fck in MPa)
( ). Calculate shear strength of concrete.
‐. V_Ed = 2247.936 kN.
‐. d = 1.984 m.
‐. bw = 2.800 m.
‐. K = MIN[ 1.0+sqrt(200/d), 2.0 ] = 1.3175 (by d unit is mm).
‐. Asl = 0.01473 m^2. (Area of tensile reinforcement).
‐. Rhol = Asl/(bw*d) = 0.00265
‐. V_Rdc1 = [ 0.12*K*(80*Rhol*fck)^(1/3) ]*bw*d = 1713.257 kN.
‐. V_Rdc2 = [ 0.031*K^(3/2)*sqrt(fck) ]*bw*d = 1540.712 kN.
‐. V_Rdc = MAX[ V_Rdc1, V_Rdc2 ] = 1713.257 kN.
‐. Vwd = V_Ed (V_Rdc < V_Ed) ‐‐‐> Shear reinforcement is required.
( ). Check crushing of concrete.
‐. Theta = 45.0000 (deg)
‐. V_RdMax= 1.0*Nu*fcd/{cot(Theta)+tan(Theta)}*bw*0.9*d = 20801.088 kN.
‐. V_Ed < V_RdMax ‐‐‐> Acceptable !!!
( ). Calculate required shear reinforcement. ( Asw1 = 0.00011 m^2. )
‐. Asw/s1 = Vwd / (0.9*fywd*d) = 0.00290 m^2/m.
‐. Calculate spacing s1 = 0.31248 m.
‐. Rhow = 0.072*sqrt(fck)/fyw = 0.00085 (by concrete and steel classes).
‐. Smax1 = Asw / (bw*Rhow) = 0.37931 m.
‐. Smax2 = 0.75*d = 1.48800 m.
‐. Applied spacing s = MIN[ s1, Smax1, Smax2 ] = 0.31248 m.
‐. N_leg = 8
‐. Asw/s = N_leg*Asw1 / s = 0.00290 m^2/m.
‐. Aswmax/s = 0.5*1.0*Nu*fcd*bw/fywd = 0.02679 m^2/m.
‐. Asw_use/s_use = N_leg*Asw1 / s_use = 0.00724 m^2/m.
‐. Asw < Asw_use ‐‐‐> O.K !
===============================================================================
[[[*]]] CHECK STRESS LIMITATION.
===============================================================================
( ). Calculate stress of top.
‐. LCB = 25‐
‐. k1 = 0.48000
‐. k3 = 0.80000
( Assumed Uncracked Sec on )
‐. Mu = 2195.82 kN‐m.
‐. n = 12.38074( Long Term ).
‐. fctm = 0.259 * fck^(2/3) = 2771.26757 KPa.
‐. fr1 = (1.6 ‐ H/1000) * fctm = ‐1385.63379 KPa.
‐. fr = MAX[ fctm, fr1 ] = 2771.26757 KPa.
‐. z_bar = 1.06242 m.
‐. Iyy = 2.38324 m^4.
‐. Ss_con = Mu*(H‐z_bar)/Iyy = 955.98044 KPa.
‐. Ss_stl = Mu*(d‐z_bar)*n/Iyy = 10512.51939 KPa.
Ss_con < fr ‐‐‐> O.K !
Ss_stl < k3*fyk=400000.00000 KPa. ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE CRACK.
===============================================================================
===============================================================================
[[[*]]] CHECK DEFLECTIONS.
===============================================================================
( ). Compute Maximum Deflec on.
‐. LCB = 26 (Quasi‐permanent).
‐. Posi on = 1.400 m. From i‐end(Node 4).
‐. DAF = 1.000 (Deflec on Amplifica on Factor)
‐. Def = 5.338e‐005 * DAF = 5.338e‐005 m.
‐. Def_Lim = L / 250.000 = 0.011 m.
Def < Def_Lim ‐‐‐> O.K !
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MIDAS/Civil ‐ RC‐Beam Checking [ IRC:112‐2011 ] Civil 2017
==========================================================================================
*.MIDAS/Civil ‐ RC‐BEAM Analysis/Design Program.
*.PROJECT :
*.DESIGN CODE : IRC:112‐2011, *.UNIT SYSTEM : kN, m
*.MEMBER : Member Type = BEAM, MEMB = 3
*.DESCRIPTION OF BEAM DATA (iSEC = 3) : PierCap C
Sec on Type : Rectangle (RECT)
Beam Length (Span) = 2.800 m.
Sec on Depth (Hc) = 2.100 m.
Sec on Width (Bc) = 2.800 m.
Concrete Strength (fck) = 35000.000 KPa.
Main Rebar Strength (fy) = 500000.000 KPa.
S rrups Strength (fyw) = 500000.000 KPa.
Modulus of Elas city (Es) = 200000000.000 KPa.
*.FORCES AND MOMENTS AT CHECK POINT <M> :
Posi ve Bending Moment P‐M_Ed = 0.00 kN‐m., LCB = 2‐
Nega ve Bending Moment N‐M_Ed = 4724.15 kN‐m., LCB = 15‐
Shear Force V_Ed = 2247.94 kN. , LCB = 15+
*.REINFORCEMENT PATTERN :
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Loca on i di( m.) Rebar Asi( m^2.)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Top 1 0.091 15‐P25 0.00736
Top 2 0.141 15‐P25 0.00736
Bo om 1 0.091 15‐P25 0.00736
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
S rrups : 8.0‐P12 @120
===============================================================================
[[[*]]] ANALYZE NEGATIVE BENDING MOMENT CAPACITY.
===============================================================================
( ). Compute design parameters.
‐. lambda = 0.8000 ( fck <= 60 MPa.)
‐. eta = 1.0000 ( fck <= 60 MPa.)
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fyd = fyk / Gamma_s = 434782.609 KPa.
( ). Check area of tensile reinforcement (Rectangular‐beam).
‐. fyk = 500000.0000 KPa.
‐. fctm = 0.259 * fck^(2/3) = 2771.2676 KPa.
‐. As.min = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ] = 0.0093 m^2.
‐. As.max = 0.04 * (Bc*Hc) = 0.2352 m^2.
‐. As.prov = 0.0147 m^2.
‐. As.min < As.prov < As.max ‐‐‐> O.K !
( ). Search for neutral axis...... Unit : kN., m.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Trial c C T Ra o
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1‐st 0.186 6511.28 6403.04 101.690
2‐nd 0.180 6319.78 6403.04 98.700
3‐rd 0.183 6415.53 6403.04 100.195
4‐th 0.182 6367.65 6403.04 99.447
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
( ). Check moment capacity.
‐. c = 0.1818 m.
‐. a = lambda * c = 0.1455 m.
‐. C = eta*fcd*(hf*bf+Bc*(a‐hf)) = 6367.65 kN.
‐. T = fyd * As = 6403.04 kN.
‐. hc = 1.0500 m.
‐. M_Rd = C*(hc‐a/2) + T*(d‐hc) = 12203.33 kN‐m.
‐. M_Ed/M_Rd = 0.387 ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE POSITIVE BENDING MOMENT CAPACITY.
===============================================================================
( ). Compute design parameters.
‐. lambda = 0.8000 ( fck <= 60 MPa.)
‐. eta = 1.0000 ( fck <= 60 MPa.)
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fyd = fyk / Gamma_s = 434782.609 KPa.
( ). Check area of tensile reinforcement (Rectangular‐beam).
‐. fyk = 500000.0000 KPa.
‐. fctm = 0.259 * fck^(2/3) = 2771.2676 KPa.
‐. As.min = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ] = 0.0094 m^2.
‐. As.max = 0.04 * (Bc*Hc) = 0.2352 m^2.
‐. As.prov = 0.0074 m^2.
‐. As.prov < As.min ‐‐‐> Not Acceptable !!!
( ). Search for neutral axis...... Unit : kN., m.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Trial c C T Ra o
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1‐st 0.098 3447.15 3201.52 107.672
2‐nd 0.093 3255.64 3201.52 101.690
3‐rd 0.090 3159.89 3201.52 98.700
4‐th 0.092 3207.76 3201.52 100.195
5‐th 0.091 3183.83 3201.52 99.447
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
( ). Check moment capacity.
‐. c = 0.0909 m.
‐. a = lambda * c = 0.0727 m.
‐. C = eta*fcd*(hf*bf+Bc*(a‐hf)) = 3183.83 kN.
‐. T = fyd * As = 3201.52 kN.
‐. hc = 1.0500 m.
‐. M_Rd = C*(hc‐a/2) + T*(d‐hc) = 6297.49 kN‐m.
‐. M_Ed/M_Rd = 0.000 ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE SHEAR CAPACITY.
===============================================================================
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fywd = fyw / Gamma_s = 434782.609 KPa.
‐. Nu = 0.6*(1.0‐fck/310) = 0.5323 (fck in MPa)
( ). Calculate shear strength of concrete.
‐. V_Ed = 2247.936 kN.
‐. d = 1.984 m.
‐. bw = 2.800 m.
‐. K = MIN[ 1.0+sqrt(200/d), 2.0 ] = 1.3175 (by d unit is mm).
‐. Asl = 0.01473 m^2. (Area of tensile reinforcement).
‐. Rhol = Asl/(bw*d) = 0.00265
‐. V_Rdc1 = [ 0.12*K*(80*Rhol*fck)^(1/3) ]*bw*d = 1713.257 kN.
‐. V_Rdc2 = [ 0.031*K^(3/2)*sqrt(fck) ]*bw*d = 1540.712 kN.
‐. V_Rdc = MAX[ V_Rdc1, V_Rdc2 ] = 1713.257 kN.
‐. Vwd = V_Ed (V_Rdc < V_Ed) ‐‐‐> Shear reinforcement is required.
( ). Check crushing of concrete.
‐. Theta = 45.0000 (deg)
‐. V_RdMax= 1.0*Nu*fcd/{cot(Theta)+tan(Theta)}*bw*0.9*d = 20801.088 kN.
‐. V_Ed < V_RdMax ‐‐‐> Acceptable !!!
( ). Calculate required shear reinforcement. ( Asw1 = 0.00011 m^2. )
‐. Asw/s1 = Vwd / (0.9*fywd*d) = 0.00290 m^2/m.
‐. Calculate spacing s1 = 0.31248 m.
‐. Rhow = 0.072*sqrt(fck)/fyw = 0.00085 (by concrete and steel classes).
‐. Smax1 = Asw / (bw*Rhow) = 0.37931 m.
‐. Smax2 = 0.75*d = 1.48800 m.
‐. Applied spacing s = MIN[ s1, Smax1, Smax2 ] = 0.31248 m.
‐. N_leg = 8
‐. Asw/s = N_leg*Asw1 / s = 0.00290 m^2/m.
‐. Aswmax/s = 0.5*1.0*Nu*fcd*bw/fywd = 0.02679 m^2/m.
‐. Asw_use/s_use = N_leg*Asw1 / s_use = 0.00724 m^2/m.
‐. Asw < Asw_use ‐‐‐> O.K !
===============================================================================
[[[*]]] CHECK STRESS LIMITATION.
===============================================================================
( ). Calculate stress of top.
‐. LCB = 25‐
‐. k1 = 0.48000
‐. k3 = 0.80000
( Assumed Uncracked Sec on )
‐. Mu = 3358.09 kN‐m.
‐. n = 12.38074( Long Term ).
‐. fctm = 0.259 * fck^(2/3) = 2771.26757 KPa.
‐. fr1 = (1.6 ‐ H/1000) * fctm = ‐1385.63379 KPa.
‐. fr = MAX[ fctm, fr1 ] = 2771.26757 KPa.
‐. z_bar = 1.06242 m.
‐. Iyy = 2.38324 m^4.
‐. Ss_con = Mu*(H‐z_bar)/Iyy = 1461.99267 KPa.
‐. Ss_stl = Mu*(d‐z_bar)*n/Iyy = 16076.92544 KPa.
Ss_con < fr ‐‐‐> O.K !
Ss_stl < k3*fyk=400000.00000 KPa. ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE CRACK.
===============================================================================
===============================================================================
[[[*]]] CHECK DEFLECTIONS.
===============================================================================
( ). Compute Maximum Deflec on.
‐. LCB = 26 (Quasi‐permanent).
‐. Posi on = 1.400 m. From i‐end(Node 4).
‐. DAF = 1.000 (Deflec on Amplifica on Factor)
‐. Def = 5.338e‐005 * DAF = 5.338e‐005 m.
‐. Def_Lim = L / 250.000 = 0.011 m.
Def < Def_Lim ‐‐‐> O.K !
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MIDAS/Civil ‐ RC‐Beam Checking [ IRC:112‐2011 ] Civil 2017
==========================================================================================
*.MIDAS/Civil ‐ RC‐BEAM Analysis/Design Program.
*.PROJECT :
*.DESIGN CODE : IRC:112‐2011, *.UNIT SYSTEM : kN, m
*.MEMBER : Member Type = BEAM, MEMB = 3
*.DESCRIPTION OF BEAM DATA (iSEC = 3) : PierCap C
Sec on Type : Rectangle (RECT)
Beam Length (Span) = 2.800 m.
Sec on Depth (Hc) = 2.100 m.
Sec on Width (Bc) = 2.800 m.
Concrete Strength (fck) = 35000.000 KPa.
Main Rebar Strength (fy) = 500000.000 KPa.
S rrups Strength (fyw) = 500000.000 KPa.
Modulus of Elas city (Es) = 200000000.000 KPa.
*.FORCES AND MOMENTS AT CHECK POINT <J> :
Posi ve Bending Moment P‐M_Ed = 0.00 kN‐m., LCB = 2‐
Nega ve Bending Moment N‐M_Ed = 2218.43 kN‐m., LCB = 14‐
Shear Force V_Ed = 1926.35 kN. , LCB = 20‐
*.REINFORCEMENT PATTERN :
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Loca on i di( m.) Rebar Asi( m^2.)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Top 1 0.091 15‐P25 0.00736
Top 2 0.141 15‐P25 0.00736
Bo om 1 0.091 15‐P25 0.00736
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
S rrups : 8.0‐P12 @120
===============================================================================
[[[*]]] ANALYZE NEGATIVE BENDING MOMENT CAPACITY.
===============================================================================
( ). Compute design parameters.
‐. lambda = 0.8000 ( fck <= 60 MPa.)
‐. eta = 1.0000 ( fck <= 60 MPa.)
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fyd = fyk / Gamma_s = 434782.609 KPa.
( ). Check area of tensile reinforcement (Rectangular‐beam).
‐. fyk = 500000.0000 KPa.
‐. fctm = 0.259 * fck^(2/3) = 2771.2676 KPa.
‐. As.min = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ] = 0.0093 m^2.
‐. As.max = 0.04 * (Bc*Hc) = 0.2352 m^2.
‐. As.prov = 0.0147 m^2.
‐. As.min < As.prov < As.max ‐‐‐> O.K !
( ). Search for neutral axis...... Unit : kN., m.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Trial c C T Ra o
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1‐st 0.186 6511.28 6403.04 101.690
2‐nd 0.180 6319.78 6403.04 98.700
3‐rd 0.183 6415.53 6403.04 100.195
4‐th 0.182 6367.65 6403.04 99.447
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
( ). Check moment capacity.
‐. c = 0.1818 m.
‐. a = lambda * c = 0.1455 m.
‐. C = eta*fcd*(hf*bf+Bc*(a‐hf)) = 6367.65 kN.
‐. T = fyd * As = 6403.04 kN.
‐. hc = 1.0500 m.
‐. M_Rd = C*(hc‐a/2) + T*(d‐hc) = 12203.33 kN‐m.
‐. M_Ed/M_Rd = 0.182 ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE POSITIVE BENDING MOMENT CAPACITY.
===============================================================================
( ). Compute design parameters.
‐. lambda = 0.8000 ( fck <= 60 MPa.)
‐. eta = 1.0000 ( fck <= 60 MPa.)
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fyd = fyk / Gamma_s = 434782.609 KPa.
( ). Check area of tensile reinforcement (Rectangular‐beam).
‐. fyk = 500000.0000 KPa.
‐. fctm = 0.259 * fck^(2/3) = 2771.2676 KPa.
‐. As.min = MAX[ 0.26*(fctm/fyk)*bt*d, 0.0013*bt*d ] = 0.0094 m^2.
‐. As.max = 0.04 * (Bc*Hc) = 0.2352 m^2.
‐. As.prov = 0.0074 m^2.
‐. As.prov < As.min ‐‐‐> Not Acceptable !!!
( ). Search for neutral axis...... Unit : kN., m.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Trial c C T Ra o
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1‐st 0.098 3447.15 3201.52 107.672
2‐nd 0.093 3255.64 3201.52 101.690
3‐rd 0.090 3159.89 3201.52 98.700
4‐th 0.092 3207.76 3201.52 100.195
5‐th 0.091 3183.83 3201.52 99.447
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
( ). Check moment capacity.
‐. c = 0.0909 m.
‐. a = lambda * c = 0.0727 m.
‐. C = eta*fcd*(hf*bf+Bc*(a‐hf)) = 3183.83 kN.
‐. T = fyd * As = 3201.52 kN.
‐. hc = 1.0500 m.
‐. M_Rd = C*(hc‐a/2) + T*(d‐hc) = 6297.49 kN‐m.
‐. M_Ed/M_Rd = 0.000 ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE SHEAR CAPACITY.
===============================================================================
‐. Gamma_c = 1.50 (for Fundamental).
‐. Alpha_cc= 0.67 (Default or User Defined).
‐. fcd = Alpha_cc * fck / Gamma_c = 15633.333 KPa.
‐. Gamma_s = 1.15 (for Fundamental).
‐. fywd = fyw / Gamma_s = 434782.609 KPa.
‐. Nu = 0.6*(1.0‐fck/310) = 0.5323 (fck in MPa)
( ). Calculate shear strength of concrete.
‐. V_Ed = 1926.352 kN.
‐. d = 1.984 m.
‐. bw = 2.800 m.
‐. K = MIN[ 1.0+sqrt(200/d), 2.0 ] = 1.3175 (by d unit is mm).
‐. Asl = 0.01473 m^2. (Area of tensile reinforcement).
‐. Rhol = Asl/(bw*d) = 0.00265
‐. V_Rdc1 = [ 0.12*K*(80*Rhol*fck)^(1/3) ]*bw*d = 1713.257 kN.
‐. V_Rdc2 = [ 0.031*K^(3/2)*sqrt(fck) ]*bw*d = 1540.712 kN.
‐. V_Rdc = MAX[ V_Rdc1, V_Rdc2 ] = 1713.257 kN.
‐. Vwd = V_Ed (V_Rdc < V_Ed) ‐‐‐> Shear reinforcement is required.
( ). Check crushing of concrete.
‐. Theta = 45.0000 (deg)
‐. V_RdMax= 1.0*Nu*fcd/{cot(Theta)+tan(Theta)}*bw*0.9*d = 20801.088 kN.
‐. V_Ed < V_RdMax ‐‐‐> Acceptable !!!
( ). Calculate required shear reinforcement. ( Asw1 = 0.00011 m^2. )
‐. Asw/s1 = Vwd / (0.9*fywd*d) = 0.00248 m^2/m.
‐. Calculate spacing s1 = 0.36465 m.
‐. Rhow = 0.072*sqrt(fck)/fyw = 0.00085 (by concrete and steel classes).
‐. Smax1 = Asw / (bw*Rhow) = 0.37931 m.
‐. Smax2 = 0.75*d = 1.48800 m.
‐. Applied spacing s = MIN[ s1, Smax1, Smax2 ] = 0.36465 m.
‐. N_leg = 8
‐. Asw/s = N_leg*Asw1 / s = 0.00248 m^2/m.
‐. Aswmax/s = 0.5*1.0*Nu*fcd*bw/fywd = 0.02679 m^2/m.
‐. Asw_use/s_use = N_leg*Asw1 / s_use = 0.00724 m^2/m.
‐. Asw < Asw_use ‐‐‐> O.K !
===============================================================================
[[[*]]] CHECK STRESS LIMITATION.
===============================================================================
( ). Calculate stress of top.
‐. LCB = 24‐
‐. k1 = 0.48000
‐. k3 = 0.80000
( Assumed Uncracked Sec on )
‐. Mu = 1604.78 kN‐m.
‐. n = 12.38074( Long Term ).
‐. fctm = 0.259 * fck^(2/3) = 2771.26757 KPa.
‐. fr1 = (1.6 ‐ H/1000) * fctm = ‐1385.63379 KPa.
‐. fr = MAX[ fctm, fr1 ] = 2771.26757 KPa.
‐. z_bar = 1.06242 m.
‐. Iyy = 2.38324 m^4.
‐. Ss_con = Mu*(H‐z_bar)/Iyy = 698.66357 KPa.
‐. Ss_stl = Mu*(d‐z_bar)*n/Iyy = 7682.91277 KPa.
Ss_con < fr ‐‐‐> O.K !
Ss_stl < k3*fyk=400000.00000 KPa. ‐‐‐> O.K !
===============================================================================
[[[*]]] ANALYZE CRACK.
===============================================================================
===============================================================================
[[[*]]] CHECK DEFLECTIONS.
===============================================================================
( ). Compute Maximum Deflec on.
‐. LCB = 26 (Quasi‐permanent).
‐. Posi on = 1.400 m. From i‐end(Node 4).
‐. DAF = 1.000 (Deflec on Amplifica on Factor)
‐. Def = 5.338e‐005 * DAF = 5.338e‐005 m.
‐. Def_Lim = L / 250.000 = 0.011 m.
Def < Def_Lim ‐‐‐> O.K !
Design Force
Ultimate shear force(Vu) = 3458.6 kN
Minimum horizontal force (Nuc) = 691.72 kN
𝑁𝑢𝑐 = 0.2 × 𝑉𝑢
𝑀𝑢 = 𝑉𝑢 × 𝑎 + 𝑁𝑢𝑐 × (ℎ − 𝑑)
Limitation Checking
∅ 0.2𝑓 ′ 𝑐 𝑏𝑤𝑑 = 25556.44 kN
Reinforcement Calculation
Shear Friction Reinforcement = 5812.773 mm2
𝑉𝑢
𝐴𝑣𝑓 =
∅ × 𝑓𝑦 × 𝜇
2
1 𝐴𝑠 ≥ × 𝐴𝑣𝑓 + 𝐴𝑛 = 5502.759 mm2
3
2 𝐴𝑠 ≥ 𝐴𝑓 + 𝐴𝑛 = 8189.282 mm2