REPUBLIK INDONESIA

DEPARTEMANT PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link Name : Date of testing : / /2019


Type of Work :
Location :

KM. 134+150 (kiri) KM. 134+200 (kanan) KM. 134+250 (kiri)


RIGID PAVEMENT RIGID PAVEMENT RIGID PAVEMENT RIGID PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
38.00 41.00 39.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0 0.00 0
5 13.00 5 9.80 5 14.20 5
10 28.40 10 27.10 10 25.50 10
15 43.40 15 39.40 15 42.20 15
20 58.50 20 59.40 20 59.30 20
25 73.60 25 74.50 25 77.60 25
30 30 30 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0 1

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 CUMULATIVE NO OF BLOW
0 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Al Azhar Chan )


Site Inspector Lab Teknisi Quality Control

file:///conversion/tmp/scratch/418156563.xls
REPUBLIK INDONESIA
DEPARTEMANT PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link No. : Date of testing : / /2019


Link Name :
Type of Work :

KM. 129+050 (kiri) KM. 129+100 (kanan) KM. 129+150 (kiri) KM. 129+200 (kanan)
OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
43.00 41.00 39.00 42.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0 0.00 0 0.00
5 9.10 5 12.70 5 11.50 5 10.50
10 22.40 10 28.30 10 25.60 10 17.30
15 40.60 15 38.40 15 40.10 15 36.80
20 58.70 20 55.30 20 59.40 20 55.80
25 76.80 25 63.30 25 78.20 25 74.90
30 30 84.20 30 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0 1

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
CUMULATIVE NO OF BLOW
0 1 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Zulkarnaen )


Site Inspector Lab Teknisi Quality Control

file:///conversion/tmp/scratch/418156563.xls
REPUBLIK INDONESIA
DEPARTEMANT PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link No. Date of testing : / /2019


Link Name :
Type of Work :

KM. 129+250 (kiri) KM. 129+300 (kanan) KM. 129+350 (kiri)


OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
37.00 43.00 41.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0 0.00 0
5 12.00 5 14.00 5 13.00 5
10 28.00 10 31.00 10 30.00 10
15 46.00 15 49.00 15 50.00 15
20 57.00 20 62.00 20 58.00 20
25 62.00 25 71.00 25 67.00 25
30 30 30 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0 1

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 CUMULATIVE NO OF BLOW
0 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Zulkarnaen )


Site Inspector Lab Teknisi Quality Control
file:///conversion/tmp/scratch/418156563.xls
file:///conversion/tmp/scratch/418156563.xls
REPUBLIK INDONESIA
DEPARTEMANT PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link No. Date of testing : / /2019


Link Name :
Type of Work :

KM. 129+900 (kiri) KM. 129+950 (kanan) KM. 130+000 (kiri) KM. 130+050 (kanan)
OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
38.00 37.00 44.00 42.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0 0.00 0 0.00
5 13.00 5 8.00 5 11.00 5 14.00
10 22.00 10 18.00 10 26.00 10 26.00
15 36.00 15 31.00 15 41.00 15 39.00
20 46.00 20 48.00 20 55.00 20 54.00
25 61.00 25 56.00 25 68.00 25 62.00
30 79.00 30 30 76.00 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0 1

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 CUMULATIVE NO OF BLOW
0 1 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Zulkarnaen )


Site Inspector Lab Teknisi Quality Control
file:///conversion/tmp/scratch/418156563.xls
file:///conversion/tmp/scratch/418156563.xls
REPUBLIK INDONESIA
DEPARTEMANT PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link No. Date of testing : / /2019


Link Name :
Type of Work :

KM. 130+100 (kiri) KM. 130+150 (kanan)


OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
36.00 41.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0
5 11.00 5 13.00 5
10 23.00 10 26.00 10
15 34.00 15 40.00 15
20 46.00 20 55.00 20
25 60.00 25 70.00 25
30 76.00 30 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 CUMULATIVE NO OF BLOW
0 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Zulkarnaen )


Site Inspector Lab Teknisi Quality Control
file:///conversion/tmp/scratch/418156563.xls
file:///conversion/tmp/scratch/418156563.xls
REPUBLIK INDONESIA
DEPARTEMANT PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link No. : Date of testing : / /2019


Link Name :
Type of Work :

KM. 132+050 (kiri) KM. 132+100 (kanan) KM. 132+150 (kiri) KM. 132+200 (kanan)
OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
36.00 39.00 41.00 40.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0 0.00 0 0.00
5 13.00 5 15.00 5 14.00 5 11.00
10 27.00 10 34.00 10 28.00 10 24.00
15 41.00 15 48.00 15 42.00 15 39.00
20 57.00 20 60.00 20 56.00 20 54.00
25 74.00 25 72.00 25 70.00 25 66.00
30 30 30 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0 1

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 CUMULATIVE NO OF BLOW
0 1 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Zulkarnaen )


Site Inspector Lab Teknisi Quality Control
file:///conversion/tmp/scratch/418156563.xls
file:///conversion/tmp/scratch/418156563.xls
REPUBLIK INDONESIA
DEPARTEMANT PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN KABUPATEN BUNGO
PAKET : JEMBATAN BUNGO II

SCALA DYNAMIC CONE PENETROMETER TEST

Link No. : Date of testing : 30-Apr-07


Link Name :
Type of Work :

KM. 133+500 (kiri) KM. 133+550 (kanan) KM. 133+600 (kiri) KM. 133+650 (kanan)
OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT OVERLYING PAVEMENT
axt axt axt axt
TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a TYPE t (cm) a
2.54 2.54 2.54 2.54
39.00 38.00 37.00 42.00

STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO. STRUCTURAL NO.


R D DD SPP R D DD SPP R D DD SPP R D DD SPP
0 0.00 0 0.00 0 0.00 0 0.00
5 10.00 5 10.00 5 12.00 5 8.00
10 22.00 10 23.00 10 26.00 10 21.00
15 35.00 15 34.00 15 42.00 15 33.00
20 48.00 20 52.00 20 56.00 20 49.00
25 63.00 25 74.00 25 70.00 25 65.00
30 30 30 30

CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW


0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
0 1 0 1 0 1

10 10 10

20 20 20

30 30 30

40 40 40

50 50 50

60 60 60

70 70 70

80 80 80

90 90 90
CUMULATIVE NO OF BLOW CUMULATIVE NO OF BLOW
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50 CUMULATIVE NO OF BLOW
0 1 0

10 10

20 20

30 30

40 40

50 50

60 60

70 70

80 80

90 90

Disetujui oleh, Diperiksa oleh, Dikerjakan oleh,


PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR

( Ade Kurnia, ST. ) ( Sugiyanto ) ( Zulkarnaen )

file:///conversion/tmp/scratch/418156563.xls
Site Inspector Lab Teknisi Quality Control

file:///conversion/tmp/scratch/418156563.xls

You might also like