Scour Depth Calculation

The document calculates scour depth and determines the appropriate foundation depth for a structure. It first calculates a scour depth of 10.25 meters for soil from 1.5 to 4.5 meters deep. For deeper boulder soil from 4.5 to 6 meters, it calculates a scour depth of 7.84 meters. Based on borehole data that shows rock at 6 meters, it is determined that the rock level will be above the calculated scour level, and sets the fixity level at 343.29 meters. Considering IRC guidelines and the rock strength, it recommends a foundation level of 341 meters.

Uploaded by

ankkeshmundra1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Scour Depth Calculation

The document calculates scour depth and determines the appropriate foundation depth for a structure. It first calculates a scour depth of 10.25 meters for soil from 1.5 to 4.5 meters deep. For deeper boulder soil from 4.5 to 6 meters, it calculates a scour depth of 7.84 meters. Based on borehole data that shows rock at 6 meters, it is determined that the rock level will be above the calculated scour level, and sets the fixity level at 343.29 meters. Considering IRC guidelines and the rock strength, it recommends a foundation level of 341 meters.

Uploaded by

ankkeshmundra1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Calculation of Scour Depth & Foundation Depth

RL of bore hole Top = 350.29 m


Discharge = 25000 m3/s
HFL = 359.4 m

** Scour Depth for 1.5m to 4.5 m ( Yellow soil with Sand )

Silt Factor f = 1.76 x sqrt (d50)


d50 = 2 mm
f = 1.76 x sqrt(2) = 2.49

Scour depth Sd = 0.475 (Q/f)^(1/3) .


Sd = 0.475 X ( 25000/2.49 ) ^ (1/3) = 10.25 m

Max scour depth = 2 Sd 20.50 m


Scour Level = 359.4 - 20.5 = 338.90 m.

** Scour Depth for 4.5m to 6.0 m ( Boulder ) - Say sand has scoured off.

Silt Factor f = 1.76 x sqrt (d50)


d50 = 10 mm
f = 1.76 x sqrt(10) = 5.57

Scour depth Sd = 0.475 (Q/f)^(1/3) .


Sd = 0.475 X ( 25000/5.57 ) ^ (1/3) = 7.84 m

Max scour depth = 2 Sd 15.67 m


Scour Level = 359.4 - 15.67 = 343.73 m.

As per geotechnical investgation report,


Rock strata is available at 6.0 m below RL of bore hole
So, Rock level = 350.29 - 6 = 344.29

It is clear from above calculation that rock is available 0.56m (344.29-343.73) above the scour level
and as Rock strata does not lend itself to scour, therefore no scour will occour beyond rock level i.e.
344.3 m lvl. However by considering loosening of 1.0 m of upper level rock, Fixity level shall be taken
at level 343.29m level.

Determination of Foundation Level


As per geotechnical investgation report ( Test result No 3 , Page no . 12 )
UCS = 33.26 kg/cm2 = 3.39 N/mm2
As per IRC78:2014 Art. 705.2.2
For UCS < 12.5 Mpa and UCS > 2.5 Mpa, Embedment depth shall be 1.5m.

Foundation level = 343.29 - 1.5 = 341.79 m lvl

Let us provide foundation level at 341.0 m lvl.