0% found this document useful (0 votes)
133 views9 pages

Delay Analysis

review of five methods for delay ananlysis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views9 pages

Delay Analysis

review of five methods for delay ananlysis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

The Open Construction and Building Technology Journal, 2009, 3, 81-89 81

Open Access
Review of Delay Analysis Methods: A Process-Based Comparison
Jyh-Bin Yang*,1 and Chih-Kuei Kao2

1
Department of Construction Engineering & Project Management/ Institute of Construction Management, Chunghua
University. No. 707, Sec.2, Wu-Fu Rd., Hsinchu, 300, Taiwan (R.O.C.); 2Construction Management Program, Institute
of Technology Management, Chunghua University, Hsinchu, Taiwan (R.O.C)

Abstract: Schedule delays frequently occur in construction projects. Many methods have been developed and used to
analyze and measure the schedule delay of construction projects. Selecting a suitable analysis methodology is a major task
for resolving the schedule delay claims encountered. This study reviews 18 delay analysis methods, and compares in de-
tail three process-based dynamic analysis methods, namely, the snapshot analysis method, the windows analysis method
and the isolated delay type method. A dynamic method is ideal for resolving a delay claim, since it provides accurate
analysis. The differences among the dynamic methods in terms of the capabilities, required documents, timing and analy-
sis process are discussed to help delay analysts to select an appropriate method. Finally, this study attempts to propose six
suggestions on developing an ideal analysis method.

Keywords: Delay analysis, process comparison, dynamic analysis method, claim management.

1. INTRODUCTION select a suitable analysis method based on a deeper investi-


gation on process variations that influence the accuracy of
Schedule delays frequently occur in construction pro-
delay analysis.
jects. Many recent studies have focused on analyzing delay
values accurately and systematically from the as-planned and This study comprehensively reviews 18 delay analysis
as-built schedules, since the obtained information are the methods, categorized as mathematical, computer-based and
basis for resolving delay disputes and claims. Various meth- process-based models, to identify their characteristics in
ods have been developed and used for analyzing and measur- analysis processes. This study compares three process-based
ing construction schedule delays. However, these methods dynamic delay analysis methods, namely the snapshot analy-
have different analytical approaches and require different sis method, the window analysis method and the isolated
information. For a complicated delay case, different method delay type method, that are adopted to analyze delay events
may provide different results, and require different input contemporaneously. The capabilities, timing and documents
data. That is, no single method is universally accepted by all required in these methodologies are compared. The analyti-
project participants, suitable for all situations. Therefore, cal processes of each methodology are then described by
there is a need to provide complete information of available flow charts for comparison. The research results should al-
delay methods for a delay analyst while he/she wants to se- low potential users to select an appropriate method easily
lect a suitable method to resolve his/her delay problems. This based on their available information. Moreover, this study
study tries to provide this useful information. attempts to propose some suggestions on developing an ideal
analysis method based on the discussion about dynamic de-
Arditi and Pattanakitchamroon [1] discussed selecting a
lay analysis method.
suitable delay analysis method and concluded that the most
appropriate analysis method depends on information avail- 2. RELATED STUDIES
able, time of analysis and capabilities of the method, as well
Bubshait and Cunningham [2] proposed an approach for
as time, funds and effort allocated to the analysis. They dis-
selecting one suitable method among the as-planned method,
cussed four delay analysis methods, namely, the as-planned
vs. as-built method, the impact as-planned method, the col- the as-built method, and the modified as-built method. Their
approach consists of four scenarios, each comprising various
lapsed as-build method and the time impact method. All the
approved schedules (network or bar chart) with different
methodologies discussed by Arditi and Pattanakitchamroon,
evidence and progress reports. They concluded that method
except the time impact method, are static methodologies,
selection depends on the time and resources available, and
which provide less promising information for delay claim
on the accessibility of project control documentation. To
management than dynamic methodologies, which analyze
delay events systematically and objectively to both contract make an appropriate selection among the as-planned vs. as-
built method, the impact as-planned method, the collapsed
parties. Furthermore, the comparisons provided by Arditi
as-build method and the time impact method, Arditi and Pat-
and Pattanakitchamroon still do not fulfill the requirement to
tanakitchamroon [1] prepared a tabular checklist with sched-
ule type (as planned, as-built, updated, adjusted and fragnets)
*Address correspondence to this author at the Department of Construction and information type (progress report, bar chart, approved
Engineering & Project Management/ Institute of Construction Management, network and updated approved network) documents to act as
Chunghua University. No. 707, Sec.2, Wu-Fu Rd., Hsinchu, 300, Taiwan
a selection aid. The study results of Arditi and Pattanakit-
(R.O.C.); Tel: 886-3-5186684; Fax: 886-3-5370517;
E-mail: [email protected] chamroon and of Bubshait and Cunningham reveal that dif-

1874-8368/09 2009 Bentham Open


82 The Open Construction and Building Technology Journal, 2009, Volume 3 Yang and Kao

ferent delay analysis methods require different documents 4. DELAY ANALYSIS METHOD
and consume different levels of resources.
4.1. Available Delay Analysis Method
It is interested that previous literature discussing the se-
lection of proper delay analysis methodology has concen- Many delay analysis methods have been present in the
trated mainly on available schedule-related documents. Al- literature [1, 3, 7-11]. They can be categorized as process-
though available schedule-related documents dominate the based, mathematical and computer-based models (Fig. 1).
selection of schedule delay analysis methods, the execution The famous process-based methods include the global
processes with required documents can provide constructive impact, net impact, adjusted as-built CPM, as-planned ex-
information for selection of methodologies. The purpose of panded, but-for, snapshot, time impact, windows and iso-
this study is to depict the analysis processes to help schedule lated delay type techniques [12, 13]. Mathematical models
analysts to understand the complexity of discussed method- are developed to help delay analysts to calculate accurately
ologies, thus enabling them to select the most appropriate the delay impact of a single activity on a project. Computer-
methodology. Similar to the scope of this study, Mohan and based model are designed to help delay analyst to collect and
Al-Gahtani [3] discussed ten delay analysis techniques in record required data (or information) and running definite
analysis flow and compared them in resolving the issues of delay analyses. Mathematical methods include an equation-
real time delay, concurrent delay and pacing delay. Based on activity-based calculation method proposed by Shi et al.
study results, Mohan and Al-Gahtani proposed a desirable [14]; a fuzzy logic approach for estimating delay duration to
delay analysis system consisting of eleven requirements, improve delay analysis, proposed by Oliveros and Fayek
such as the requirement for the project schedule to be up- [15]; and a method proposed by Lee et al. [16] that considers
dated every day, taking account of all delays and changes in lost productivity for analyzing schedule delay.
total floats. Comprehensive schedule data about real world
With regard to computer-based methods, Yates [17] de-
cases involving construction schedule delays are clearly hard
to gather. The objective of this study is to differentiate veloped a construction decision support system for delay
analysis with the capability of determining possible causes
among available delay analysis techniques with general
for project delays. The system used some information tech-
schedule-related documents and distinct analysis processes,
nology (IT) to process data for delay analysis. Aoude [18]
thus providing an attainable target for most delay analysts in
developed a computer program to help identify and quantify
their real-world analyses.
delays encountered in construction projects. The system used
general project appraisal information to analyze project and
3. GENERAL DOCUMENTS FOR DELAY ANALYSIS activity level delays. Abudayyeh developed a multimedia
The schedule information of construction projects for system for construction delay management, in order to dem-
tracing delay events after project completion is generally onstrate the roles of pictorial and audio data and information
varied. Elnagar and Yates [4] conducted a survey of project in management of delays and potential claims [19]. This in-
control personnel from contractors, owner and the US Army vestigation only focuses on the process-based methods.
Corps of Engineers, and concluded that schedule network, 4.2. Reviews on Delay Analysis Methods
daily construction report, quality control report, correspon-
dence, progress curves, productivity measurement and Table 1 summarizes 18 methods found in periodical
change-order log are the essential delay indicators. At least journals. Each methodology is briefly introduced. Addition-
four types of schedule network, namely, as-planned, as-built, ally, similar methods from other studies are presented. Fur-
adjusted and entitlement schedules are used in various delay ther descriptions about discussed delay methods may be
analysis methods. found in the references provided. Notably, methods that ap-
peared in reports or proceedings are not discussed in this
An as-planned schedule is an initial approved schedule investigation, due to their low accessibility. The excluded
submitted by the contractor to the owner for a project. The methods are the Entropy [23, 32] and Scatter Diagram [23]
as-planned schedule is regarded as a baseline schedule or a methods.
target schedule for managing a project. An as-built schedule
is the final schedule for a project and is usually prepared
when the project is completed and contains all the actual
start and finish dates, and the disruptions (for example, de-
lays) that have occurred in the project [5]. An adjusted
schedule is obtained by modifying the as-planned or as-built
schedule according to the method dictated by the chosen
delay analysis technique [5]. Entitlement schedules are used
to show the original contractual completion dates, how these
completion dates have been impacted due to excusable de-
lays, and the projected completion dates given the remaining
work. The final entitlement schedule reflects the original,
adjusted and actual completion dates used to establish the
total time that the contractor or the owner is entitled to for
compensation [6]. These four schedule types are found in
different delay methodologies, as discussed below. Fig. (1). Rationale classification of delay analysis method.
Review of Delay Analysis Methods: A Process-Based Comparison The Open Construction and Building Technology Journal, 2009, Volume 3 83

Table 1 Delay Analysis Method and its Isomorphism and Similar Method

Method Introduction Isomorphism/ Similar Method Category

Reams’ systematic This method systematically isolates the impact in time of each alleged None concept method
approach [20] delay, impact or acceleration directive occurred, then determines the type
of the alleged delay by comparing the impacts of previous delays.

Global impact tech- This method represents all the delays and disruptions on a bar chart, and None concept method
nique [7] then calculates the total delay by summarizing all delaying events.

Net impact technique This method is similar to the global impact technique, but only the net Adjusted as-built CPM technique concept method
[7] effect of all the delays. The method determines total delay by calculating [6, 7]
the difference between the as-planned and the as-built completion dates.

Snapshot technique [7] This method divides the as-built schedule into a number of consecutive None dynamic
snapshot (time period) and updates the as-planned schedule by imposing method
all delays that occur in each snapshot and in succession. The method re-
cords the delay caused by each update, and then summarizes all the re-
corded delays.

Isolated delay type [7] This method is similar to the snapshot technique, except that it classifies None dynamic
delay types as excusable compensable delays, excusable non-compensable method
delays and non-excusable delays, instead of considering all the delays
together. The method imposes the delay to update the as-planned schedule
and summarizes all apportioned delay values that have been recorded.

After-the-fact and Similar to the impacted as-planned method, this method uses a created None forward path
modified CPM sched- new baseline or modified as-planned schedule, instead of the original as- method
ule [21] planned schedule.

Dollar-to-time rela- This method supports the direct relationship between the project cost and None concept method
tionship [21] time. However, delay value is hard to calculate from the extra cost.

Bar chart analysis [10, This method compares the as-planned bar chart with an as-built bar chart As-built bar chart [23] concept method
22] prepared by recording delays on extended or added bars. This method
systematically ignores the lack of underlying logic between the activities.

CPM update review This method examines each schedule update submitted on the project, and None concept method
[10, 22] explains the cause of the delay on each update, without performing any
further analysis.

As-planned versus as- Similar to the bar chart analysis method, this method simply compares the None concept method
built analysis [10, 22] baseline or as-planned schedule with the final or as-built schedule. The
time owed is calculated by subtracting the time planned from the actual
time expended to determine.

Linear schedule analy- This method is only used for linear type projects. The method compares None concept method
sis [10, 22] the as-planned schedule with actual linear progress.

B&B’s delay analysis This method uses critical path techniques to simulate the impact of events None forward path
method [23] that have been identified as likely to cause delays to the project. This method
method is a clear, straightforward step-by-step approach with a dynamic
model considered by both experts and practitioners.

Impacted as-planned This method starts with the as-planned schedule and adds delay one by As-planned plus delay analysis forward path
method [10, 22] one (generally caused by other party) to an activity to demonstrate why [10, 22, 25]; impacted baseline method
the project was completed later than planned. schedule [21]; what-if, [24, 25];
affected baseline schedule [26];
as-planned method [27]
84 The Open Construction and Building Technology Journal, 2009, Volume 3 Yang and Kao

Table 1. Contd….

Method Introduction Isomorphism/ Similar Method Category

But-for [24] This method concentrates on a specific delay or delaying event, not a time Time impact technique [2, 10, 22, forward path
period containing delays or delaying events. This method starts with the 27]; modified as-built [2, 10]; method
as-planned schedule, and imposes delayed activity one by one caused baseline adding impacts method
solely by the other party to calculate its liability. [23]; forensic scheduling [27]

This method starts with the as-built schedule, and removes one party’s Traditional method [2]; but-for backward path
delays from the schedule to collapse it, leaving those delays caused solely schedules [10]; as-built subtract- method
by the other party. ing impacts method [23]; as-built
method [27]; as-built less delay
analysis, [10, 22]; collapsed as-
built [8, 10, 22, 26]; impacted as-
built CPM, [8]; collapsing tech-
nique [5, 6]

Modified but-for [24] This method designed to produce repeatable and accurate results by rec- None dynamic
onciling all parties’ points of view. This method uses the Venn diagram method
representation for three-party critical delays and the selected set of com-
pensation rules [28].

Apportionment delay This method is a compromise between the net impact and but-for tech- None dynamic
method [5] niques. It apportions the actual delay amount according to the ratios of the method
compensable-delay, non-excusable-delay and excusable -delay to the total
delays.

Windows analysis [24] This method breaks the project into discrete time increments (windows) Contemporaneous period analysis dynamic
and examines the effects of the delays attributable to each project partici- [10, 24, 29]; modified windows method
pant as the delays occur. This method adopts the as-planned schedule as analysis [8]; daily windows delay
its baseline; determines the delay values in each window, and then sum- analysis [9]; delay section [30]
marizes all recorded values.

Total float manage- This method starts with the as-planned schedule to run a day-by-day None forward path
ment [31] analysis of changes in order of operation, namely delayed or accelerated method
events on total float consumption.

4.3. Classification of Process-Based Delay Analysis contract. Therefore, this investigation analyzed three well-
Method known dynamic delay analysis methodologies, namely,
snapshot windows and isolated delay type.
Process-based methods can be further categorized as (1)
concept method, (2) forward path method, (3) backward path 5. PRE- AND POST-ANALYSIS PROCESS
method and (4) dynamic method (Fig. 2) [14]. The final
To help delay analysts or claim managers to collect re-
column in Table 1 shows the classified results. The concept
quired information, several researchers have proposed vari-
method simply calculates delay value by examining final
ous guided processes for delay analysis [20, 21, 23]. Al-
schedule evidence; the forward path method systematically
though various researchers have proposed different ap-
calculates the delay value from an as-planned schedule to an
as-built schedule; the backward path method systematically proaches to cover different issues or scopes. Processes re-
lated to claim management can be split into the following
calculates the delay value from an as-built schedule to an as-
five phases (Fig. 3).
planned schedule; and the dynamic method systematically
calculates the delay value in specific time frames forward or 1) Preparation phase: all required documents including as-
backward from as-planned and as-built schedules. planned schedule, bid documents, construction daily re-
Owing to the method categorized into the ‘dynamic ports and as-built schedules, are gathered.
method’ category providing the ability of comprehensive 2) Diagnosis phase: impacted delay events are identified for
analysis to differentiate the liability between contract parties further analysis. Delay events are classified as excusable
accurately, this study analyzed three famous delay analysis and non-excusable delays. The excusable delays are fur-
methods in the category to present their differences in analy- ther classified into excusable compensable and excusable
sis processes. The discussed methods include the snapshot non-compensable delays.
analysis method, the windows analysis method and the iso-
3) Analysis phase: to adopt the available and reliable delay
lated delay type method.
analysis methodology to calculate the delay impact value
The dynamic methods enable comprehensive analysis to of identified delay events.
differentiate accurately the liabilities of different parties to a
Review of Delay Analysis Methods: A Process-Based Comparison The Open Construction and Building Technology Journal, 2009, Volume 3 85

Fig. (2). Classification of process-based delay analysis method.

4) Interpretation phase: to clarify the schedule impact on the methodologies, and then discusses the similarities and dis-
critical path or total duration. In this phase, concurrent similarities among them. The analytical processes in the fol-
delay should be carefully considered in order to differen- lowing section only focus on Phase 3, which is the analysis
tiate its liability to contract parties. phase in Fig. (3).
5) Summation phase: all analysis results are summarized to 6. PROCESS-BASED ANALYSIS AND COMPARISON
generate a comprehensive analysis report.
6.1. Snapshot Analysis Method
The steps or processes in Phases 1 and 2 are the pre-
analysis processes, which concentrate mainly on collecting The snapshot analysis (SA) method is based on the as-
required information for formal delay analysis. In contrast, planned, as-built and any revised schedules that have been
the steps or processes in Phases 4 and 5 are the post-analysis implemented during the execution of a project. The total
processes, concentrating on summarizing the analysis results project duration is divided into a number of time periods,
that are beneficial to the analyst. To differentiate among called snapshots. The dates of these snapshots usually coin-
three discussed dynamic analysis methodologies, the next cide with major project milestones, significant changes in
section illustrates the analysis processes of three discussed planning or times when a major delay or group of delays is
known to have occurred. The relationships and duration of
the as-built schedule within the snapshot period are imposed
upon the as-planned schedule, while maintaining the rela-
tionships [6]. Fig. (4) shows the analysis process of the SA
method. The SA method calculates the delay value based on
each snapshot from the as-planned schedule and then sum-
marizes project delay values from all analyzed snapshots for
each contract party.

6.2. Windows Analysis Method


The windows analysis (WA) method, also called the con-
temporaneous period analysis method, analyzes delay
event(s) on a predefined time period (termed as a window).
This section focuses on the traditional windows analysis
method, although variants such as the daily windows and
delay section methods have been proposed. The analyst iden-
tifies several analysis windows from the as-planned sched-
ule, and then puts delays in their proper windows within the
overall context of the project to calculate the delay value in
one window. Fig. (5) shows the analysis process of the WA
method. Like the SA method, the WA method also computes
the delay value according to each window from the as-
planned schedule, and then summarizes project delay values
from all analyzed windows for each contract party. However,
the main differences between the SA and WA methods are
the algorithms to determine the analysis timeframe and to
Fig. (3). General delay analysis processes.
86 The Open Construction and Building Technology Journal, 2009, Volume 3 Yang and Kao

Fig. (4). Delay analysis processes of SA method.

settle the relationships and duration of activities within the


timeframe.
6.3. Isolated Delay Type Method
The isolated delay type (IDT) method uses the approach
of SA method to overcome the drawbacks of previous meth-
ods in dealing with proper classification of delay types, con-
Fig. (5). Delay analysis processes of WA method.
current delays and real-time CPM analysis [6]. Therefore,
the IDT method can be regarded as a modified SA method.
The IDT method is based on the as-planned schedule, but schedule. This implies that the three dynamic methods are
performs delay analysis based on the extracted analysis sec- homologous in analysis documents.
tion schedule, and explicitly considers the liabilities of con- Figs. (4, 5) and (6) present the analysis processes of SA,
tract parties. Fig. (6) shows the analysis process of the IDT WA and IDT, respectively. All three methods start to decide
method. This method summarizes project delay liability for the analysis time point, and then proceed to run complete
each contract party from all analyzed periods, based on the delay analyses. SA, WA and IDT determine the analysis
same processes as the above two methodologies. time point from an arbitrary basis (usually considering mile-
6.4. Comparison stone, significant changes or a delay event on the as-built
schedule), the end of each delay event and major delaying
The required, start-up and comparison documentations of events (or after a series of delays), respectively. The deter-
three dynamic delay analysis methodologies were compared. mined analysis time points based on the above three methods
Table 2 shows the documentations used by all discussed are analogous. Although it is hard to evaluate which method
methods. Clear, all methods start delay analysis from the as- is the best in selecting analysis time point, to run delay
planned schedule, and require the as-planned schedule and analysis at the beginning and end of a delay event provides a
identified liability documents along with adjusted schedules holistic check to compare those two points. None of three
to be generated from the as-planned schedule or as-built method run delay analyses on both antecedent time points.
Review of Delay Analysis Methods: A Process-Based Comparison The Open Construction and Building Technology Journal, 2009, Volume 3 87

(the owner or the contractor) prior to the delay impact analy-


sis, and therefore generate results that require further proc-
essing to apportion the entitlement. A complicated delay
event is usually combined with various excusable non-
compensable, excusable-compensable and non-excusable
delays. The impact of various delay types during delay
analysis need to be clearly interpreted for delay analysis. The
IDT method interprets the delay entitlement more clearly
than the others.
Table 3 shows a functionality and limitation comparison
of all three methods. Since the IDT method was developed to
overcome the drawbacks of previous methods, it has most
advantages, namely, dealing with various delay types, con-
current delay and serial delay, and operating real-time criti-
cal path analysis. However, the IDT method still has some
limitations including having logic defect and disability in
finding missing activity, time-consuming in execution and
high cost. The above comparisons reveal that no method is
perfect. A mechanism needs to be developed to help delay
analysts to select an appropriate methodology. Accordingly,
an ideal delay analysis methodology can be developed to
resolve the delay problem.
7. IDEAL DELAY ANALYSIS METHOD
An ideal delay analysis method should contribute to a fair
and accurate delay analysis result that can be accepted by
contract participants and professional schedule analysts. A
new methodology should fix several defects suffered by
available delay analysis methods. Although previous studies
have proposed several improvements or suggestions on
available methods, they still have some pitfalls that should
be fixed. Based on above reviews and discussions, this study
proposes six suggestions on developing an ideal delay analy-
sis method. The suggestions are explained as follows.
1. Concerning of as-planned and as-built schedules. These
two types of schedules are regarded as fundamental legal
documents in claim debate, and are usually used for li-
ability diagnosis. Making best use of these two schedules
or even entitlement schedules mitigates extra disputes in
claim debate. If a delay analysis method can perform its
analysis based on these schedules, the outcomes will be
convinced that all evidences are from as-planned or as-
built schedules.

Fig. (6). Delay analysis processes of IDT method. 2. Dealing with various delay types. A delay event is usu-
ally accompanied with another delay event. Complicated
delays even combine with various delay types, i.e., con-
A comparison of the processes in Figs. (4, 5) and (6) re- current and pacing delays, or excusable non-
veals that SA and WA do not address analysis viewpoints compensable, excusable-compensable and non-excusable

Table 2. Documents for Three Dynamic Delay Analysis Methods

Feature SA WA IDT

Required docs. As-planned schedule, as-built schedule and As-planned schedule, as-built schedule As-planned schedule, as-built schedule
identified liability documentations and identified liability documentations and identified liability documentations

Start-up docs. As-planned schedule As-planned schedule As-planned schedule

Comparison As-planned schedule and adjusted schedules As-planned schedule and adjusted sched- As-planned schedule and adjusted
docs. from as-built schedule ules from as-planned schedule schedules from as-planned schedule
88 The Open Construction and Building Technology Journal, 2009, Volume 3 Yang and Kao

Table 3. Comparison of Functionçality and Limitation

Feature SA WA IDT

Considering the actuality in the as-planned and as-built schedules Yes Yes Yes

Debate in responsibility distribution Partially Partially Fully

Scrutinizing delay types None None Yes

Disability in finding missing activity Yes Yes None

Dealing with concurrent delay None None Yes

Analytical process Not clearly Clearly Clearly

Determining time frame Depends Clearly Depends

Logic defect for revising next analysis schedule Yes Yes Yes

Employing timing Depends After-the-fact Depends

Analysis effort Huge Huge Huge

delays. These types of delay should be manipulated by 6. Incorporating the developed methods into popular com-
additional process compared to the discussed delay mercial scheduling software. Currently, most construc-
analysis process previously. The ability of dealing with tion projects perform planning and controlling schedules
diverse delay types makes analyst satisfied with the re- by available commercial scheduling software. However,
sults. A delay analysis method can solve more delay no popular commercial scheduling software exists to
types; it can provide more analysis results for a delay provide satisfactory delay analysis functionality. Basic
analyst for final judgment. This judgment will be fair for schedule variance analysis and delay analysis is available
both of dispute parties. in some commercial scheduling software, but it is far
from professional [11]. If a developed delay analysis
3. Providing clear liability distribution. Discussed dynamic
method can be embedded in or based on commercial
delay analysis methods simply provide guided analysis
scheduling software; it will increase convenience for ana-
processes, but lack accurate liability distribution mecha-
nism. A good delay analysis report should provide clear lysts or end-users.
liability distribution for argument delay events. To pro- CONCLUSIONS
vide calculation rules and formulae for distinguishing de-
lay liability makes analysis result more convincing than Schedule delays occur frequently in construction pro-
traditional results. The liability distribution information jects. How to develop a comprehensive method to help delay
will be useful for further damage calculation. analysts to calculate the liability of contract participants has
received much attention. Although many methods have been
4. Considering multiple critical paths and critical path(s) developed and adopted to analyze and measure construction
change. Delaying an activity on a critical path usually schedule delays, no-one is accepted for all project partici-
means taking the responsibility for delay. However, the pants and suitable for all delay situations. This investigation
original critical path(s) on the as-planned schedule may compared three dynamic delay analysis methodologies,
be not the actual critical path(s) that delayed the project namely snapshot analysis, windows analysis and isolated
target date. The effect of multiple critical paths on delay
delay type, to disclose their advantages and disadvantages.
analysis, and the changes in critical path(s) following de-
This investigation not only compared the features of capa-
lay analysis, should be addressed. The delay information
bilities and required documents, but also discussed the
on critical path(s) can provide evidences for liability dis-
analysis process and timing of all discussed methods. Results
tribution.
of this study will help delay analysts to choose an appropri-
5. Defining total float in a clear position. Delay analysis ate method. However, complete delay information should be
traditionally considers the total float as an index to calcu- kept regardless of the delay resolution method adopted.
late the effect of a delay event on the total project dura-
tion. However, the value of total float should be shared Since available delay analysis methods have some limita-
with other activities in a non-critical chain. Calculating tions in resolving delay problem, this study attempts to pro-
an activity’s impact value from its total float on the as- pose six suggestions on developing an ideal delay analysis
planned schedule produces incorrect results, and leads to method, consisting of concerning of as-planned and as-built
further dispute. To appraise the delay impact, a mathe- schedules, dealing with various delay types, providing clear
matical algorithm needs to be developed for clearly cal- liability distribution, considering multiple critical paths and
culating the effect of a single delayed activity on the total critical path(s) change, defining total float in a clear position,
project duration, considering the accurate total float con- and incorporating the system into popular commercial
sumption. scheduling software. Although above issues are hard to be
Review of Delay Analysis Methods: A Process-Based Comparison The Open Construction and Building Technology Journal, 2009, Volume 3 89

considered fully in a new method, these information pro- [14] J. J. Shi, S. O. Cheung and D. Arditi, “Construction Delay Compu-
vides some directions for following. tation Method”, Journal of Construction Engineering and Man-
agement, vol. 127, no. 1, pp. 60-65, 2001.
ACKNOWLEDGEMENTS [15] A. V. O. Oliveros and A. R. Fayek, “Fuzzy Logic Approach for
Activity Delay Analysis and Schedule Updating”, Journal of Con-
The authors would like to thank the National Science struction Engineering and Management, vol. 131, no. 1, pp. 42-51,
2005.
Council, Taiwan, ROC, for financially supporting this re-
[16] H. S. Lee, H. G. Ryu, J. H. Yu and J. J. Kim, “Method for Calculat-
search under Contract No. NSC96-2221-E-216-027-MY2 ing Schedule Delay Considering Lost Productivity”, Journal of
and the Chung Hua University for providing partial funding Construction Engineering and Management, vol. 131, no. 11, pp.
(Funding No. CHU96-2211-E-216-027-MY2) to this re- 1147-1154, 2005.
search. [17] J. K. Yates, “Construction Decision Support System for Delay
Analysis”, Journal of Construction Engineering and Management,
REFERENCES vol. 119, no. 2, pp. 226-244, 1993.
[18] H. M. Aoude, “Computerized Construction Delay Management
[1] D. Arditi and T. Pattanakitchamroon, “Selecting a Delay Analysis System”, Ph.D. thesis, Polytechnic University, Brooklyn, NY,
Method in Resolving Construction Claims”, International Journal U.S.A. 1996.
of Project Management, vol. 24, no. 2, pp. 145-155, 2006. [19] O. Y A. Abudayyeh, “Multimedia Construction Delay Management
[2] A. A. Bubshait and M. J. Cunningham, “Comparison of Delay System”, Microcomputers in Civil Engineering, vol. 12, no. 3, pp.
Analysis Methodologies”, Journal of Construction Engineering 183-192, 1997.
and Management, vol. 124, no. 4, pp. 315-22, 1998. [20] J. S. Reams, “Delay Analysis: a Systematic Approach”, Cost Engi-
[3] S. B. Mohan and K. S. Al-Gahtani, “Current Delay Analysis Tech- neering, vol. 31, no. 2, pp. 12-16, 1989.
niques and Improvement”, Cost Engineering, vol. 48, no. 9, pp. 12- [21] Z. Q. Zafar, “Construction Project Delay Analysis”, Cost Engineer-
21, 2006. ing, vol. 38, no. 3, pp. 23-28, 1996.
[4] H. Elnagar and J. K. Yates, “Construction Documentation Used as [22] J. G. Zack, “Pacing delays—the Practical Effect”, Cost Engineer-
Indicators of Delays”, Cost Engineering, vol. 39, no. 8, pp. 31-37, ing, vol. 42, no. 7, pp. 23-28, 2000.
1997. [23] D. W. Bordoli and A. N. Baldwin, “A Methodology for Assessing
[5] S. T. Ng, M. Skitmore, M. Z. M. Deng and A. Nadeem, “Improving Construction Project Delays”, Construction Management and Eco-
Existing Delay Analysis Techniques for the Establishment of Delay nomics, vol. 16, no. 3, pp. 327-337, 1998.
Liabilities”, Construction Innovation, vol. 4, no. 1, pp. 3-17, 2004. [24] L. Schumacher, “Quantifying and Apportioning Delay on Con-
[6] S. Alkass, M. Mazerolle, E. Tribaldos and F. Harris, “Construction struction Projects”, Cost Engineering, vol. 37, no. 2, pp. 11-13,
Delay Analysis Techniques”, Construction Management and Eco- 1995.
nomics, vol. 14, no. 5, pp. 375-394, 1996. [25] G. R. Stumpf, “Schedule Delay Analysis”, Cost Engineering, vol.
[7] S. Alkass, M. Mazerolle, E. Tribaldos and F. Harris, “Computer 42, no. 7, pp. 32-43, 2000.
Aided Construction Delay Analysis and Claims Preparation”, Con- [26] H. A. Al-Saggat, “The Five Commandments of Construction Pro-
struction Management and Economics, vol. 13, no. 4, pp. 335-352, ject Delay Analysis”, Cost Engineering, vol. 40, no. 4, pp. 37-41,
1995. 1998.
[8] K. D. Gothand, “Schedule Delay Analysis: Modified Windows [27] J. Conlin and A. Retik, “The Applicability of Project Management
Approach”, Cost Engineering, vol. 45, no. 9, pp. 18-23, 2003. Software and Advanced IT Techniques in Construction Delays
[9] T. M. Hegazy and K. Zhang, “Daily Windows Delay Analysis”, Mitigation”, International Journal of Project Management, vol. 15,
Journal of Construction Engineering and Management, vol. 131, no. 2, pp. 107-120, 1997.
no. 5, pp. 505-512, 2005. [28] A. Mbabazi, T. M. Hegazy and F. Saccomanno, “Modified But-for
[10] J. G. Zack, “But-for Schedules—Analysis and Defense”, Cost Method for Delay Analysis”, Journal of Construction Engineering
Engineering, vol. 43, no. 8, pp. 13-17, 2001. and Management, vol. 131, no. 10, pp. 1142-1144, 2005.
[11] J. B. Yang, “Comparison of Delay Analysis Software for Construc- [29] M. R. Fink, “Contemporaneous Analyses of Excusable Delays”,
tion Projects”, in Proceedings of 33rd Annual Conference of Cana- Cost Engineering, vol. 39, no. 12, pp. 26-31, 1997.
dian Society for Civil Engineering (CSCE), Toronto, Canada, 2005, [30] Y. Kim, K. Kim and D. Shin, “Delay Analysis Method Using De-
pp. CT-115-1-9. lay Section”, Journal of Construction Engineering and Manage-
[12] J. B. Yang, C. K. Kao and Y. Y. Lee, “System Requirement Analy- ment, vol. 131, no. 11, pp. 1155-1164, 2005.
sis of a Construction Delay Analysis System”, in Proceedings of [31] S. B. Mohan and K. S. Al-Gahtani, “Current Delay Analysis Tech-
23rd International Symposium on Automation and Robotics in nique and Improvement”, Cost Engineering, vol. 48, no. 9, pp. 12-
Construction, Tokyo, Japan, 2006, pp. 102-106. 21, 2006.
[13] J. B. Yang and C. K. Kao, “A Knowledge Map for Delay Analysis [32] R. F. Elliott, Delay Analysis, Seminar paper, Robert Fenwick
Development”, in Proceedings of Fourth International Conference Elliott, 1993.
on Construction in the 21st Century, Gold Coast, Australia, 2007,
pp. 565-573.

Received: April 20, 2009 Revised: May 11, 2009 Accepted: May 14, 2009

© Yang and Kao; Licensee Bentham Open.

This is an open access article licensed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/-
licenses/by-nc/3.0/) which permits unrestricted, non-commercial use, distribution and reproduction in any medium, provided the work is properly cited.

You might also like