Detail of Rubble Paving at Wing Wall: 60Mm Thk. Wearing Course
Detail of Rubble Paving at Wing Wall: 60Mm Thk. Wearing Course
Detail of Rubble Paving at Wing Wall: 60Mm Thk. Wearing Course
1.5
1.0
15
60mm Thk. WEARING COURSE AND LEVELLED BEFORE
0
141
1.433
RFL 2.506
2.330 -2.5 % 1.363 COMMENCING PAVING
47
-2.5 % 2.280
(STREAM BED LEVEL) (STREAM BED LEVEL)
250
CAMBER FORMED WITH
EX.C-2.352
IL 0.955 GR.30(19) CONCRETE
IL 0.905
(LHS) Slope 1:200
(RHS)
250
450
275
60
DETAIL OF RUBBLE
GR.30(19) CONCRETE
500
500
150
150
150
(SCALE 1:100) 150
1100
GR.30(19) CONCRETE
2500
275 150 150 275
150
150
75 THK.15(37.5)
CONC.
275
1450 SCREED
750 CL 750
SECTION C-C
1500
1500
TURFING / RUBBLE (SCALE :- 1:50)
PITCHING/GR.15(19) CONCRETE
(TO BE DECIDED)
200
200 TO KODIKAMAM 200 GUARD STONE
DRG. NO. JF/01/CUL/SCB/02 2000 2000
1850 1850
2000
2000
1850
1850
CARRIAGEWAY LEVEL
275 275
275
1375
2500
CH.6+588.25
200
500
75 Thk.15(37.5) CONC.
4450
4475 SCREED
END ELEVATION
( SCALE 1:100 )
1500
275
200
1850
1850
2000
2000
NOTES:
1375
FROM PULOLY
1500
1500
750 750 1. ALL DIMENSIONS ARE IN MILLIMETRES & ALL LEVELS ARE IN METERS ABOVE MEAN SEA LEVEL (MSL).
150
2. ALL WORKS SHALL BE CARRIED IN CONFORMITY WITH RELEVANT SPECIFICATIONS.
150
PLAN
200
3. ALL REDUCED LEVELS SHALL BE IN METERS.
( SCALE 1:100 ) 75 THK.15(37.5) 4. FOUNDATION LEVELS BELOW INVERT LEVELS GIVEN ARE INDICATIVE ONLY. THE ACTUAL LEVELS
CONC. SHALL BE DECIDED AFTER EXCAVATION FOR THE FOUNDATION ARE CARRIED OUT.
75
750 SCREED
5. FOR R/F DETAILS GRADE OF CONCRETE AND CLEAR COVER TO R/F ARE AS PER GIVEN DETAILS.
TYPICAL WING WALL SECTION (B-B) 6. MINOR CHANGES MAY BE CARRIED OUT AT SITE AS DIRECTED BY THE ENGINEER.
( SCALE 1:50 ) 7. IF WEAK SOIL STRATA IS ENCOUNTERED AT BASE SLAB LEVEL PREPARATION OF SAND BED SHALL BE
INTRODUCED AS INSTRUCTED BY ENGINEER.