QAQC Refrigerant Copper Pipes

This document is a checklist for inspecting the installation of refrigerant copper pipes. It outlines acceptance criteria for pipe material, joints, insulation, pressure testing, vacuuming, and refrigerant levels. The checklist covers fabrication, delivery, installation, post-installation, and general observations. Inspectors are to check that the pipes meet standards, record any non-compliant items, and sign off to approve the installation.

Uploaded by

Ali Aimran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views3 pages

QAQC Refrigerant Copper Pipes

This document is a checklist for inspecting the installation of refrigerant copper pipes. It outlines acceptance criteria for pipe material, joints, insulation, pressure testing, vacuuming, and refrigerant levels. The checklist covers fabrication, delivery, installation, post-installation, and general observations. Inspectors are to check that the pipes meet standards, record any non-compliant items, and sign off to approve the installation.

Uploaded by

Ali Aimran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Mech- REFRIGERANT COPPER PIPES

PROJECT:

CHECKLIST FOR:
MECHANICAL – REFRIGERANT COPPER PIPES

Location of Inspection: Date:

Installation Basis :
1. Post Award :

a. Shop Drawings: b. Submittals (Samples):

c. Mock Up: d. Location of Mock Up:

2. Fabrication Inspection (where applicable):

a. Fabrication (Fill in where applicable):

Item Acceptance Criteria Findings A/N*


Pipe Material
Storage of Pipes
Pipe Joints
Tubing
Bending of pipes
Insulation

* A = Approve; N = Non Compliance (Corrective Action Required)

b. Test (where applicable):

Type of Test Acceptance Criteria Findings** A/N*


Visual Inspection
Rating
Type

* A = Approve; N = Non Compliance (Corrective Action Required)


** Attach Test Report where applicable

c. Delivery:

Delivery Order
(Specify Delivery
Handling / Storage Findings
Equipment/Material Date
Delivered)
Copper Pipes

1/6
Mech- REFRIGERANT COPPER PIPES

3. Installation:

As per approved shop


a. Work Statement: b. Date Submitted:
drawing

** Fill in Where Applicable

Item Acceptance Criteria** Findings** A/N*


Copper Pipes
Pipe Joints
Installation
System Pressure Test
Insulation
System Vacuuming
R-22 Refrigerant Top-up

* A = Approve; N = Non Compliance (Corrective Action Required)

4. Post Installation:

Item Acceptance Criteria** Findings** A/N*


Damage during
installation
Leveling
Ends / openings
Labeling

* A = Approve; N = Non Compliance (Corrective Action Required)

5. General:

Item Site Observations General Comments AR / Date

Inspected By:

______________________ ______________________ ______________________


Name Signature Date

______________________ ______________________ ______________________


Name Signature Date

2/6
Mech- REFRIGERANT COPPER PIPES

3/6