This document provides details of a strut and tie model analysis of a pile cap. It includes load combinations, node coordinates and loads, and design of reinforcement ties between nodes. The analysis divides the pier base into 4 nodes and converts beam moments into equivalent vertical loads at the nodes. Tie forces between nodes are determined and required steel reinforcement is calculated and specified.

Uploaded by

NONGTHON
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
320 views2 pages

6.strut-Tie Model Guide

This document provides details of a strut and tie model analysis of a pile cap. It includes load combinations, node coordinates and loads, and design of reinforcement ties between nodes. The analysis divides the pier base into 4 nodes and converts beam moments into equivalent vertical loads at the nodes. Tie forces between nodes are determined and required steel reinforcement is calculated and specified.

Uploaded by

NONGTHON
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Strut and Tie model of pile cap L

1 3
Kerinchi Interchange - Ramp B
All units are in kN & m.
Pier B/P7 5 7
Spacing between 5 to 6 1.20 T
Spacing between 5 to 7 0.95
Offset of pier wrt CL of cap 0
6 8
Pile spacing LxT 3.60 3.60
Coord x & z of 5 1.325 1.20 coord. of 7 2.275 1.20
Coord x & z of 6 1.325 2.40 coord. of 8 2.275 2.40 2 4

Combination 1 (construction stage) Notes:-- Analyse this 4-pile group system as a Space Truss with
With gf3 Hinged Supports at 1, 2, 3 & 4 (pile centre points at top of piles)
P 9630 Find out the loads at nodes5/6/7/8 as shown in the spreadsheet.
trans 1570 BM about L-L axis Put these Vertical loads at nodes 5, 6, 7 & 8 (nodes at pier base)
longi mom 1820 BM about T-T axis the idea of choosing 4 points at pier base is to convert the BMs to
vertical loads.
Load at node 5 3992 5 FY -3992
Load at node 6 2475 6 FY -2475 node 5 node 7
Load at node 7 2340 7 FY -2340 Pier base/ top of pile cap
Load at node 8 823 8 FY -823 node 6 node 8

divide the pier base area into 4 equal parts and choose their centre points
as nodal points as shown above

Combination 2 From the analysis find out the tie forces : 1-2, 2-4, 3-4 & 1-3.
With gf3 Take the max of 1-2 & 3-4 & get the required steel & put in each band
P 23006 This reinforcement must be provided over the piles only( 1to2 * 3 to 4)
ML 19073 Do the same for ties 1-3 and 2-4.
MT 1740 The strut forces are supposed to be taken by concrete which is strong
HT 0 in compression. Provide suitable distribution steel at other places.
Load at node 5 16515 5 FX 0 FY -16515
Load at node 6 15065 6 FX 0 FY -15065
Load at node 7 -3562 7 FX 0 FY 3562
Load at node 8 -5012 8 FX 0 FY 5012

Combination 3
With gf3
P 23006
ML 15137
MT 1740

Load at node 5 14443 5 FY -14443


Load at node 6 12993 6 FY -12993
Load at node 7 -1490 7 FY 1490
Load at node 8 -2940 8 FY 2940

Combination 5
With gf3
P 18303
ML 11748
MT 10986
HT 770
Load at node 5 15336 5 FX -192.5 FY -15336
Load at node 6 6181 6 FX -192.5 FY -6181
Load at node 7 2970 7 FX -192.5 FY -2970
Load at node 8 -6185 8 FX -192.5 FY 6185

Combination 4A (skidding)
With gf3
P 23006
ML 21178
MT 1740
HT 413
Load at node 5 17623 5 FX -103.125 FY -17623
Load at node 6 16173 6 FX -103.125 FY -16173
Load at node 7 -4670 7 FX -103.125 FY 4670
Load at node 8 -6120 8 FX -103.125 FY 6120
Design:
Force in 1-2 9053 Ast= 18097 mm2 22.5 T32
Force in 1-3 7482 Ast= 14957 mm2 18.6 T32